For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19.28.200 — Horizontal seepage pit systems

Municipal Code, City of Rancho Cucamonga, California (Code 2026-09-02) · Rancho Cucamonga Municipal Code § 19.28.200

Corpus is an independent public-information project, not the official City of Rancho Cucamonga website. Stable reference: corpuslaw.us/code/a59017b2-c366-417e-a4f3-8b2924bb92db

§ 19.28.200: Horizontal seepage pit systems.

The use of the horizontal seepage pit systems is permitted only where adequate area does not exist for a leach line system. All horizontal seepage pit systems shall comply with the design and construction requirements provided in this section. A. Percolation test procedures for horizontal seepage pit systems. All percolation tests shall be performed in accordance with the test procedures found in section 19.28.160 (Groundwater and percolation testing requirements). In addition to the requirements of section 19.28.160, percolation tests for horizontal seepage pits must also comply with the following additional requirements: 1. The average percolation rates shall not exceed 30 minutes per inch in any portion of the horizontal seepage pit. Individual rates exceeding 30 minutes per inch may be considered with additional soil testing. 2. At least four percolation test holes at each pit location should be provided to represent soil types within the infiltrative surface area of the seepage pit. This profile should represent the entire sidewall depth of the pit. 3. At least one deep boring should extend to a depth of at least 10 feet below the bottom of the seepage pit, or to impermeable material. In no case shall less than five feet of unsaturated permeable soil exist below the bottom of the seepage pit. 4. Backhoe excavations may be required to demonstrate uniformity of soil throughout the seepage pit. This would be necessary when the pit is proposed in an area of variable soil conditions. 5. Any percolation tests for horizontal seepage pits, which were approved based on testing prior to the effective date of this section, will require additional percolation testing unless the previous testing meets current requirements. B. Dimensions and construction requirements. 1. Horizontal seepage pits are to be installed according to the qualified professional's specifications for location, length, width, and depth. 2. Horizontal seepage pits must be spaced 20 feet apart measured edge to edge. 3. Primary and reserve horizontal seepage pits cannot be combined in one common pit. 4. The pit excavation must be at least four feet in width, but not greater than six feet in width. 5. The top of the infiltrative surface shall be at least two feet below the natural grade but no more than five feet. This depth is also known as the cap depth. Additional soil can be placed over the top of the installed horizontal seepage pit at the discretion of the qualified professional. 6. The sidewall depth below the cap shall be at least six feet but cannot exceed seven feet. 7. The pit excavations may arc or bend under the following conditions: (i) the maximum deflection cannot exceed a total of 45 degrees in any direction without increasing the pit length to compensate for loss of sidewall area; (ii) bends or arcs totaling greater than 45 degrees may be accepted on a case-by-case basis. A correction factor will be required, increasing the total length, due to sidewall loss; and (iii) U-shaped and H-shaped bends will not be accepted. 8. The maximum slope for the use of horizontal seepage pits is 25 percent (4:1). Exceptions to this slope limit may be considered up to 50 percent (2:1), on a case-by-case basis, where the soil and slope are uniform, extending 100 feet beyond the seepage pit. Additional testing, and design detail shall be required to address the risk of effluent surfacing on the slope recognizable as sewage as well as slope stability issues. Slopes that exceed 25 percent (4:1) will, in most cases, require a terrace design. Any grading to create terraces should be in accordance with any permit requirements for brushing, clearing, and grading from any other agency. 9. The use of concrete pit liners is allowed. If used, the concrete pit liners shall meet the testing standards established by the International Association of Plumbing and Mechanical Officials (IAPMO). 10. All pits must be filled with clean leach line rock to the cap depth of the horizontal pit liner. The rock should be graded at one to one and one-half inches in size and shall be covered with straw, untreated building paper or a geotextile fabric prior to backfill to prevent the infiltration of soil into the rock. 11. A manifold system constructed of four-inch loop of Schedule 40 perforated pipe shall be installed in the pit to allow for distribution of the effluent throughout the entire pit. The manifold shall be placed one foot from the sidewall of the horizontal seepage pit and shall run the length and width of the pit in a rectangular pattern. 12. Where more than one horizontal seepage pit is proposed for the primary or reserve system, a distribution box must be used to connect the pits. 13. A hybrid system combining a horizontal seepage pit for the primary or reserve design, and leach lines for the other system is allowed. However, a combination of the two types of systems, used for a single primary or reserve design, will not be considered. The system design identified as the most difficult installation shall be installed as the primary system. This is to be based on access, grading, or other obstacles to install the system once the house is constructed. 14. The California Occupational Health and Safety Act (COHSA) requires shoring for excavations exceeding five feet when persons will be working in them. All work done installing horizontal seepage pits must comply with COHSA for the purpose of construction and inspection. C. Horizontal seepage pit sizing calculations. The calculations for sizing a horizontal seepage pit are done to provide an equivalent amount of sidewall area in the seepage pit as found in a standard three-foot deep leach line trench using the same percolation rate. Seepage Pit Length = (3LL – 2wd) / 2d Where: 3 = sq. ft. of absorptive sidewall area per lineal foot of 3-foot deep leach line trench LL = leach line length as a function of percolation rate w = seepage pit width d = seepage pit sidewall depth below cap

( Ord. No. 911 § 2, 2017 ; Ord. No. 936 § 2, 2018 )

Ask a question about Rancho Cucamonga law

Corpus searches the Rancho Cucamonga sections it holds and shows the ones that match, with their citations. Free, no sign-in.