For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.32.030 — Definitions

Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 17.32.030

Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/c06e5665-e800-4fc2-aed2-4d9eaee15cbb

17.32.030 - Definitions.

For the purpose of this Chapter, the following words or phrases shall have the meaning established by this Section: (a) Administrative Authority means the Director, or their designee, of the department responsible for the administration and enforcement of this Chapter. (b) Applicant means any person making written application for a permit hereunder. (c) As-Graded is the extent of surface and subsurface conditions and configuration upon completion of Grading. (d) Bedrock is naturally occurring, in-place solid rock. (e) Bench means a relatively level step graded into sloped earth. (f) Best Management Practices or BMPs mean the procedures, schedule of activities, prohibitions of practices, maintenance procedures, and devices to prevent or minimize the quantity of runoff pollutants and/or volumes that flow to receiving water bodies. BMPs may include any type of pollution prevention or control measure that the Administrative Authority finds necessary to reduce pollutants entering the Waters of the United States to the maximum extent practicable. (g) Blasting Operation means the use of an explosive device or explosive materials to destroy, modify, obliterate, or remove any obstruction of any kind from a piece of property. (h) Certify or Certification means the act of to provide a signed (and stamped, as applicable) written statement by the Permittee or by the responsible professional, as required, that the specific inspections and tests have been performed and comply with the applicable requirements of this Chapter. (i) Civil Engineer means a Professional Engineer duly licensed and registered with the State of California to practice in the field of civil engineering. (j) Clearing means the removal of all unwanted surface material, such as brush, grass, weeds, downed trees, and other material by manual, mechanical, or other methods that do not disturb the earth's surface and that leave the material at existing grade and within four inches above existing grade intact. For purposes of this Chapter, clearing activities using heavy equipment or other measures that do not leave the existing grade intact are not classified as "Clearing." Rather, such activities are classified as "Grubbing," as defined below. (k) Compaction means the densification of earth by mechanical means. (l) Construction General Permit means the then-current General Permit for Discharges of Storm Water Associated with Construction Activity as issued by the California State Water Resources Control Board, Construction General Permit Order 2009-0009-DWQ as it may be amended and reissued from time to time. (m) Cross-Lot Drainage means storm water runoff that flows directly across lot lines to a neighboring property. (n) Cumulative Impervious Surface Area means the total measurement of those surface areas within a lot or parcel that prevent aeration, infiltration, and water penetration, and that release all or a majority of the precipitation that falls on the same. Cumulative Impervious Surface Area includes, but is not limited to, sidewalks, driveways, parking lots, roads, pavers or landscape materials that prevent infiltration and water penetration, and rooftops. (o) Embankment or Fill means the deposition of Soil, sand, gravel, rock, or other earth materials by human activity and the conditions resulting therefrom. (p) Engineering Geologist means a Certified Engineering Geologist, registered with the State of California to practice engineering geology. (q) Engineering Geology means the application of geologic knowledge and principles in the investigation and evaluation of naturally occurring rock and Soil for use in the design of civil work. (r) Engineer of Record means the Civil Engineer with responsible charge for the Grading and associated improvements; authorized to act for a property owner or agent in doing work covered by this Chapter; licensed and registered by the State of California to practice in the relevant field; and responsible for preparation of the Grading plans, certification of the completed Grading work, and preparation of the record plans. (s) Erosion means the process by which land is diminished or worn away due to wind, water, or glacial ice. Often the eroded debris (silt or sediment) becomes a pollutant via storm water runoff. Erosion occurs naturally but can be intensified by activities such as Clearing, Grading, Grubbing, farming, development, road building, and timber harvesting. (t) Erosion Control means any combination of desilting facilities, pipes, channels, culverts, sandbags and Erosion protection devices, including effective planting and the maintenance thereof, installed or placed to protect property, watercourses, public facilities, and receiving waters from Erosion or from the deposit of sediment or dust. (u) Excavation or Cut means any earth, sand, gravel, rock, or other similar material, which is cut into, dug, quarried, uncovered, removed, displaced, relocated, or bulldozed by man, and the conditions resulting therefrom. (v) Expansive Soil means soils meeting all four of the following provisions, except that tests to show compliance with Items 1, 2 and 3 shall not be required if the test prescribed in Item 4 is conducted: (1) Plasticity index (PI) of 15 or greater, determined in accordance with ASTM D4318. (2) More than 10 percent of the Soil particles pass a No. 200 sieve (75 μm), determined in accordance with ASTM D422. (3) More than 10 percent of the Soil particles are less than 5 micrometers in size, determined in accordance with ASTM D422. (4) Expansion index greater than 20, determined in accordance with ASTM D4829. (w) Finish Grade means the final elevation of the ground surface upon completion of any excavation or fill that conforms to the City-approved grading plan. (x) Geotechnical Engineer means a Civil Engineer who has been licensed, registered, and granted authority to hold themselves out as a Geotechnical Engineer by the State of California. (y) Geotechnical Report means a report which contains all appropriate Soil Engineering, geologic, hydrologic, and seismic information, evaluation, recommendations, and findings. This type of report combines both engineering and Soil Engineering reports. (z) Grade means the vertical location of the ground surface. (aa) Grading means any excavating or filling or combination thereof; any earth disturbance; removal, and recompaction; storage; stockpiling; or any combination thereof resulting in the displacement, removal, excavation, import, export, or recompaction of soil. (bb) Grading Contractor means a contractor licensed by the State of California who specializes in grading work or is otherwise licensed to do grading work. (cc) Grading Plan means a plan prepared in accordance with this Chapter showing Grading and related work. (dd) Gross Stability means the factor of safety against failure of slope material below a surface approximately three to four feet deep measured from and perpendicular to the slope face. (ee) Grubbing means the removal of vegetative matter such as roots, stumps, buried materials, and other matter using manual, mechanical, or chemical methods that disturb the zone from four inches or less above the earth's surface to beneath the existing grade. (ff) Interim Erosion Control Plan means a plan prepared in accordance with this Chapter showing Erosion Control and Best Management Practices designed to control surface runoff, prevent Erosion, and retain sediment on a development site during the period in which pre-construction and construction-related land disturbances and Grading occur, and before final improvements are completed. (gg) Landscape Architect means a landscape architect, registered by the State of California, who performs professional work in physical land planning and integrated land development, including the design of landscape planting programs. (hh) Permanent Erosion Control Plan means a plan prepared in accordance with this Chapter showing Erosion Control and Best Management Practices designed to control surface runoff, prevent Erosion, and retain sediment on a development site after final structures and permanent improvements have been completed. (ii) Permittee means the Applicant or developer in whose name a valid permit is duly issued pursuant to this Chapter and their agents, employees, and others acting under their direction. (jj) Precise Grading Plan means a plan showing the precise finish grades, structure locations, and site improvements. A Precise Grading Plan is typically required for the finish work to occur after Rough Grading. (kk) Public Place means any public street, way, place, alley, sidewalk, trail, park, square, or any other public property owned or controlled by any government agency in a governmental capacity. (ll) Retaining Wall means a structure designed to resist the lateral displacement of Soil or other materials. (mm) Rock Crushing means the use of a device, machine, apparatus, or equipment for the purpose of crushing, grinding, breaking, or pulverizing rock or stone. Rock Crusher means the device, machine, apparatus, or equipment to carry out Rock Crushing activities. (nn) Rough Grade means the operational stage at which the grade approximately conforms to the approved plan. (oo) Rough Grading Plan means a plan for rough grading, clearing and grubbing, stockpiling, and other preliminary work to precede Precise Grading work. (pp) Surficial Stability means the factor of safety against failure of the outer three to four feet of slope material measured from and perpendicular to the slope face. (qq) Slope is an inclined ground surface, the inclination of which is expressed as a ratio of horizontal distance to vertical distance. (rr) Soil means the naturally occurring superficial earth deposits overlying Bedrock. (ss) Soils Engineering means the application of the principles of Soil mechanics in the investigation, evaluation, and design of civil works involving the use of earth materials and the inspection and testing of the construction thereof. (tt) Soils Engineer means a Civil Engineer experienced and knowledgeable in the practice of Soil Engineering. (uu) Structural Best Management Practice or Structural BMP means that subset of BMPs which detains, retains, filters, removes, or prevents the release of pollutants to surface waters from development projects in perpetuity, after construction of a project is completed. This general term encompasses the pollutant control BMPs and hydromodification BMPs required for Priority Development Projects under the San Diego Region Municipal Separate Storm Sewer System (MS4) Permit. A structural BMP may be a pollutant control BMP, a hydromodification management BMP, or an integrated pollutant control and hydromodification management BMP. (vv) They and Their as used herein are the gender-neutral singular pronoun (such as he/she/they) and the associated possessives (his/hers/theirs). (ww) Terrace means a relatively level step constructed in the face of a graded slope for drainage, erosion control, and/or maintenance purposes. (xx) Vertical Height of a slope means the measurement from the toe of slope to a point projected horizontally directly above it from the top of slope.

(Ord. No. 2022-1522, § 2(Exh. A), 9-13-2022)

Ask a question about San Marcos law

Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.