17.32.130 - Interim Erosion Control.
(a) Interim Erosion Control Requirements. Interim erosion control plans shall be submitted as part of the grading plans. For bonding purposes, an estimate of the cost of implementing and maintaining all interim erosion and sediment control measures must be submitted in a form acceptable to the Administrative Authority. The Erosion Control Plan prepared by the Engineer of Record shall address mitigation of erosion during any ground-disturbing activity, including all of the following key requirements: (1) Reduce Erodible Soil Exposure in the event of rain including, but not limited to, a phased grading schedule, consultation with the National Weather Service to determine the forecast during the wet season, and plans to have erosion control measures in place on the site no later than 24 hours prior to the forecasted rain event. (2) Erosion Control Measures including, but not limited to, geotextile material, mats, bonded fiber matrix, hydroseeding, vegetation stabilization, preservation of existing vegetation on site, seeding and planting of ground cover, permanent landscaping, and supporting irrigation. (3) Flow Control Measures including, but not limited to, gravel bag dikes, fiber rolls, use of stabilized earth to reduce flow velocity and trap sediments, and energy dissipaters. (4) Diversion of Runoff and Nuisance Flow around the areas subject to construction, including but not limited to redirection of runoff away from the construction area, conveyance of concentrated flows via lined ditches or pipes, redirection of flows directed away from top of slope, and conveyance over slopes via pipes and lined ditches. (5) Sediment Control Devices including, but not limited to, check dams, protection at storm drain inlets, silt fences, gravel bags, berms, fiber rolls, desilting and sediment basins, street sweeping, and stabilized construction entrances. (6) Confirmation of Coverage under the current State of California Construction General Permit. (7) Management of Waste including, but not limited to, inclusion of a 24-hour emergency contact plan, spill prevention and control, solid waste management, hazardous waste management, liquid waste management, concrete wash outs, and storage of minimum qualities of material on site for spill control. (8) Any Additional Measures as required by the Administrative Authority to temporarily stabilize and reseed disturbed Soil areas to protect water quality. (b) Information on Interim Erosion Control Plan. The plan shall include: (1) Contact Information including the 24-hour telephone number of the person responsible for performing emergency erosion control work. (2) Signature and Seal of the licensed professional who prepared the erosion control plan. (3) All temporary and permanent desilting, sediment control, and erosion protection structures, devices, and facilities necessary to protect drainage ways, storm drain systems, streets, and adjacent property from sediment deposition. (4) The proposed streets and drainage devices and a schedule for their completion. (5) Access Plan showing how access will be provided to maintain erosion control facilities during wet weather. (6) Phasing. The erosion control provisions shall take into account drainage patterns during the current and future phases of grading throughout the rainy season (7) Other Information as the Administrative Authority deems necessary based upon the scale, location, extent, topography and other matters relating to the grading. (c) Interim Erosion Control Maintenance. The following minimum erosion control maintenance requirements shall be included in each Interim Erosion Control Plan and are a condition of each Grading permit in addition to any applicable storm water permit requirement: (1) Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall be available on-site and appropriately stockpiled in compliance with applicable permit requirements at convenient locations to facilitate rapid construction of temporary devices when rain is imminent. (2) All removable protection devices shown shall be in place at the end of each working day when the five day rain probability forecast exceeds 40 percent. (3) Graded areas around the tract perimeter must drain away from the face of Slopes at the conclusion of each working day. (4) After each rainstorm, silt and debris shall be removed from check berms and desilting basins and the basins pumped dry. (5) After each rainstorm, the performance of the erosion control system shall be evaluated and revised and maintained and/or repaired as necessary. (6) Devices shall not be removed or modified without the approval of the Administrative Authority. (7) The Permittee and the Permittee's contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas where impounded water creates a hazardous condition. (8) Paved streets, sidewalks, and other improvements shall be maintained in a neat and clean condition, free of loose Soil, construction debris, and trash. Street sweeping or other equally effective means shall be used on a regular basis to control erosion. Watering shall not be used to clean streets except for fine material not otherwise removed by sweeping or other mechanical means. (9) The Permittee and the contractor who constructed the erosion control devices shall be responsible for inspection and modification of the devices, as necessary, during the rainy season. The contractor, Permittee, or project owner shall be responsible for continual maintenance of the devices during the rainy season. In the event of failure or refusal by the contractor, Permittee, or project owner to properly maintain the devices, the Administrative Authority may cause emergency maintenance work to be done to protect adjacent private and public property. The cost shall be charged to the owner, and shall include an initial mobilization cost plus the cost of doing the work. In the event the Administrative Authority must cause emergency maintenance work to be done, it may revoke the Grading permit by giving written notice of the revocation to the Permittee. The permit shall not be renewed until an erosion control system approved by the Administrative Authority is installed, and the cost of emergency work is paid to the City by the contractor or other responsible party.
(Ord. No. 2022-1522, § 2(Exh. A), 9-13-2022)
Ask a question about San Marcos law
Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.