17.32.105 - Retaining Walls.
Subject to the applicability below, the following items shall be provided with the Grading permit for proposed retaining wall construction: (a) Applicability. Retaining walls require a Grading permit, with the following exceptions: (1) Walls less than three feet in height as measured from top of footing to top of wall. (2) Walls permitted under a Building Permit from the Administrative Authority. (b) Structural Calculations. Design calculations and construction drawings, prepared by a qualified engineer registered in California, must be submitted for all proposed walls, with the exception noted in (1) below. The Geotechnical Engineer is required to provide the specific recommendations noted below. (1) Exception. Walls designed in strict conformance with the current San Diego Regional Standard Drawings ("SDRSD") may be constructed per the SDRSD without calculations, provided that drainage provisions to the satisfaction of the Administrative Authority are made. (2) Soil Parameters, including specific recommendations and design parameters for on-site Soils and/or import material and for retained, reinforced, and foundation Soils. Any imported Soils must be tested and certified by the Soils Engineer as suitable for the specific application. (3) Design calculations based on the design parameters provided by the Soils Engineer, with minimum factors of safety for the wall design as established by the Administrative Authority. (c) Drainage Facilities satisfactory to the Administrative Authority, shall be provided for all walls over three feet in height. The following criteria shall be observed: (1) For all SDRSD-based and similar custom-designed walls, the drainage system shall include continuous vertical and horizontal drains with filter protection leading to an approved outlet. (2) Segmented wall designs shall include permanent drainage interceptors above the wall to ensure that projected 100-year flows are diverted entirely away from the wall and carried to an approved outlet. (3) Segmented wall designs shall be prepared in accordance with specific recommendations from the Soils Engineer regarding drainage behind and through the wall system. The design must provide features adequate to avoid buildup of hydraulic pressure in the Soil behind the wall and to prevent migration of fine material from the backfill. (d) Visual Simulations shall be required at the discretion of the Administrative Authority. Additionally, retaining walls exceeding four feet in exposed wall face shall be earth-tone colored and textured to provide a natural appearance, or as otherwise required by the Administrative Authority. (e) Engineer of Record Certification in writing that states, with no disclaimer, that the Engineer of Record has reviewed the calculations, concurs with and approves the design and calculations, and is satisfied that the design meets all applicable standards. (f) Certification Prior to Acceptance. Upon completion of the wall, and before reliance on any wall for issuance of a Building Permit, the Engineer of Record and Soils Engineer of Record shall submit certification to the City stating that the wall has been constructed in accordance with this Code, the minimum requirements of the manufacturer, the design plans, and specifications as approved by the City, and their recommendations.
(Ord. No. 2022-1522, § 2(Exh. A), 9-13-2022)
Ask a question about San Marcos law
Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.