17.32.100 - Fills.
(a) Applicability. Unless otherwise recommended in the Geotechnical Report and approved by the Administrative Authority, fill grading shall conform to the provisions of Section 300-4 of the Standard Specifications for Public Works Construction (Greenbook) and the City of San Marcos Special Provisions. If a Geotechnical Report is not otherwise required by this Code or by the Administrative Authority, the Administrative Authority may waive the provisions in this Section. (b) Fill location. Fill Slopes shall not be constructed on natural Slopes steeper than three horizontal to one vertical (3:1). Fill placement in Zones A and B shall comply with Figure 1. Zone A. Zone A shall consist of compacted Soil only (no rock fragments over 12 inches in maximum dimension), must be in conformance with Section 300-4 of the Standard Specifications for Public Works Construction (Greenbook), and shall contain at least 40 percent Soil sizes passing the one-fourth-inch sieve. Zone A shall extend horizontally fifteen feet from face of slope and vertically a minimum of five feet from Finished Grade. In public rights-of-way and easements, Zone A shall be ten feet minimum and must extend three feet below the deepest utility, whichever is greater. Zone B. Oversize rocks greater than two feet in minimum dimension must be windrowed. Rocks shall be placed in excavations in well compacted Soil conforming to Zone A. Approved granular Soil (SE greater than 30) must be flooded in the windrows to completely fill the voids around and beneath rocks. All windrows must be parallel and may be placed either parallel or perpendicular to face of slope depending on site geometry. All rock placement, fill placement, and flooding of approved granular fill must be continuously observed by the Geotechnical Engineer. (b) Preparation of Ground. The ground surface shall be prepared to receive Fill by removing vegetation, noncomplying Fill, topsoil, and other unsuitable materials, and by scarifying to provide a bond with the new fill. Where Slopes are steeper than five horizontal to one vertical and the height is greater than five feet, the Slope shall be prepared by benching into sound Bedrock or other competent material as determined by the Geotechnical Engineer. The bench under the toe of fill on a slope steeper than five horizontal to one vertical shall be at least ten feet wide. The area beyond the toe of fill shall be sloped for sheet overflow, or a paved drain shall be provided. Where fill is to be placed over a cut, the cut shall be approved as suitable by the Geotechnical Engineer and Engineering Geologist prior to fill placement. Suitable Soil is Soil which, in the opinion of the Geotechnical Engineer, Engineering Geologist, and accepted by the Administrative Authority, is competent to support other Soil or Fill, to support structures, and to satisfactorily perform the other functions for which the Soil is intended. (d) Fill Material. Detrimental amounts of organic material shall not be permitted in Fills. Except as permitted by the Administrative Authority, no rock or similar irreducible material with a maximum dimension greater than 12 inches shall be buried or placed in Fills. EXCEPTION: The Administrative Authority may permit placement of larger rock when the rock disposal areas are delineated on the grading plan complying with the Zone B criteria. (e) Expansive Soils. Expansive Soil shall not be placed within four feet of Finish Grade in areas intended or designed to support buildings, unless design considerations are specifically addressed in the Geotechnical Report and approved by the Administrative Authority. (f) Compaction. All Fills shall be compacted to a minimum of 90 percent of maximum density as determined by ASTM D1557. Field density shall be determined in accordance with ASTM D1556 or equivalent as approved by the Administrative Authority. (g) Slope. The Slope of Fill surfaces shall be no steeper than is safe for the intended use. Fill Slopes shall be no steeper than two horizontal to one vertical. Figure 1: Placement of Oversized Rock [image omitted; see the official code]
(Ord. No. 2022-1522, § 2(Exh. A), 9-13-2022)
Ask a question about San Marcos law
Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.