For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 81.2.51 — Grading permit requirements. [Geological]

Municipal Code, City of Torrance, California · Torrance Municipal Code § 81.2.51

Corpus is an independent public-information project, not the official City of Torrance website. Stable reference: corpuslaw.us/code/4c235a2a-85fe-4ab3-a8eb-eab53495378a

§ 81.2.51: Grading permit requirements. [Geological]

Section J104 of Appendix J of the California Building Code, 2025 Edition, is hereby deleted in its entirety and a new Section J104 added to read in its entirety, as follows: J104 Permit Application and Submittals. J104.1 Submittal Requirements. In addition to the provisions of Sections 105.3 and 1.8.4, as applicable, the applicant shall state the estimated quantities of grading works. J104.2 General Grading Requirements. In granting a grading permit, the Building Official shall impose the following restrictions or conditions thereon, in addition to those otherwise provided herein. Such restrictions or conditions shall include but not be limited to: 1. | Whenever any grading, excavation, filling, or paving requires entry onto adjacent property for any reason, the permit applicant shall obtain the written consent of the adjacent property owner or his authorized representative, and shall file a copy of said consent with the Building Official, before a permit for such grading or paving work may be issued. In the event that contours on adjacent properties are permanently changed, structures or drainage devices are added or modified, and/or the work done requires a grading permit under Section J103, a separate permit shall be required for each of such affected adjoining properties in addition to the consent letter. The consent letter will not be required if the adjoining owner obtains such grading permit. 2. | No person shall conduct any grading, excavation, filling or paving, including the export or import of earth material between the hours of 8:00 P.M. and 7:00 A.M. of any day, except in emergencies as determined by the Building Official. 3. | No person shall conduct any grading, excavation, or filling in excess of two hundred (200) cubic yards or any paving operations in excess of five thousand (5,000) square feet during the period between October 1and April 5 unless a winter grading or paving plan and specifications and other plans or specifications, as required by the Building Official, are filed with the Building and Safety Division and approved by the Building Official. Whenever it appears that any grading or paving project previously commenced pursuant to a permit issued by the Building and Safety Division will not be completed by October 1, the Building Official may require the permit applicant to submit plans for winter protection and erosion control to safeguard adjacent properties. 4. | Paved streets, sidewalks and other improvements shall be maintained in a neat and clean condition free of loose soil, construction debris and trash. Street sweeping or other equally effective means shall be performed on a regular basis to prevent storm flows from transporting sediment and debris beyond the project boundaries. All improvements shall comply with NPDES requirements. 5. | The civil engineer or other qualified professional who prepared the grading plans and designed the erosion control measures shall be responsible for inspection and modification of those measures, as necessary. Any significant modifications to the erosion control plan shall be subject to approval by the Building Official. In addition, the Building Official in granting a grading or paving permit, may impose such conditions thereon in addition to those otherwise provided herein, as are reasonably necessary to prevent the proposed operations from being conducted in such a manner as to constitute or create a hazard to life or property. Such conditions may include, but shall not be limited to: 1. | The designation of routes along which earth, sand, gravel, asphaltic concrete, or similar materials shall be transported where grading permit is for more than five hundred (500) cubic yards, or paving permits is for more than ten thousand (10,000) square feet. 2. | Restrictions as to size, type, and number of pieces of equipment to be used, including trucks, where grading permit is for more than five hundred (500) cubic yards or paving permit is for more than ten thousand (10,000) square feet. 3. | A provision that the applicant carry a policy of insurance insuring the City, its agents and employees, and the public against any loss or damage to persons or property resulting from the work to be performed under said permit in an amount not to exceed one million dollars ($1,000,000) or double the amount of the bond required therefore, whichever sum is greater, in a form approved by the Building Official. 4. | Requirements for fencing or temporary protection for excavations or fills which would otherwise be hazardous. 5. | A requirement for dust control during the course of grading or stockpile operation by watering or other approved method approved by the Building Official. 6. | A requirement to provide a stabilized site access, using temporary asphalt concrete paving of two (2) inch thickness or more, or approved compacted base material, to allow for the removal of debris from vehicles leaving the development site, and prevent the tracking of debris into the public right of way. J104.3 Plans and Specifications. Each application for a grading or paving permit shall be accompanied by two (2) sets of plans and specifications and, when required, supporting data consisting of, but not limited to, a geotechnical report, engineering geology report, drainage report, and hillside landscape report. The plans and specifications shall be prepared and signed by a civil engineer when required by the Building Official. Plans shall be drawn to scale on substantial paper ,cloth, or in an approved electronic format, and shall be of sufficient clarity to indicate the nature and scope of the proposed work. The plans must demonstrate, in detail, conformance with the provisions of this code and all relevant laws, ordinances, rules and regulations. The first sheet of each set of plans shall include the project location, legal description of the property, and the name and address of preparer. The plans shall include, but not be limited to, the following information: 1. | General vicinity sketch of the proposed site location and known seismic faults. 2. | Property limits, accurate contours of existing ground, and details of terrain and drainage patterns on the subject property. This shall include contributory drainage areas and conditions on adjacent properties extending enough to allow for sufficient data to demonstrate compliance with grading code requirements. 3. | Detailed plans of pavement, planters, landscaped areas, all surface and subsurface drainage devices, walls, cribbing, dams, and other protective features. A drainage map showing drainage areas and estimated runoff for areas served by any drainage facilities shall also be provided. 4. | The location of any buildings or structures on the subject property and the location of any building or structures on adjacent properties within fifteen (15) feet of the property line or that may be affected by the proposed grading activity. 5. | The location of top and toe of all cuts and fills, as well as the location of all “daylight” lines. 6. | Planting and irrigation plans of all hillside or slope areas, when required by the Building Official. 7. | The quantity of excavation and fill involved, including the recompaction of existing uncompacted fill. 8. | Limiting dimensions, finish elevations or contours to be achieved by the grading, and the layout of proposed drainage channels and related improvements. 9. | The dates of the geotechnical engineering and engineering geology reports together with the names, addresses and phone numbers of the firms or individuals who prepared the reports. 10. | Existing and proposed improvements within the public right of way. Specifications shall contain information covering construction and material requirements. J104.4 Grading and Paving Designation. All grading in excess of five thousand (5,000) cubic yards or paving in excess of fifty thousand (50,000) square feet shall be performed in accordance with the approved grading or paving plans prepared by a civil engineer, and shall be designated as “engineered grading or paving”. Grading involving less than 5,000 cubic yards or paving of less than fifty thousand (50,000) square feet shall be designated “regular grading or paving” unless the permittee with the approval of the Building Official chooses to have the grading performed as “engineered grading or paving.” The Building Official may designate grading of less than five thousand (5,000) cubic yards or paving of less than fifty thousand (50,000) square feet as “engineered grading or paving” if the grading takes place in the Hillside Area or the nature of the work requires special design consideration. J104.5 Engineered Grading and Paving Requirements. For engineered grading or paving , the plans and specifications shall be prepared and signed by aa registered design professional licensed by the state to prepare such plans or specifications, when required by the Building Official. It shall be the responsibility of the registered design professional to incorporate all recommendations from the geotechnical engineering, engineering geology, seismological, drainage and landscape planting reports into the grading or paving plans. The registered design professional shall also act as the coordinating agent in the event the need arises for liaison between the other professionals, the contractor, and the Building Official. The landscape architect shall also be responsible for the preparation of landscape planting and irrigation plans and specifications. These plans and specifications shall be submitted to the Building Official for approval prior to the issuance of the grading permit. All undocumented fill shall be removed, until competent native soils have reached, and recompacted from property line to property line. Exception: The building official is authorized to waive or modify the requirement if it found that the nature of the work is not necessary. J104.6 Geotechnical Report. The geotechnical report prepared by a registered design professional required by Section J104.3 shall include at least the following: 1. | Data regarding the nature, distribution, and strength of existing soils; 2. | Conclusions, and recommendations for grading and paving procedures; 3. | Soil design criteria for any structures or embankments required to accomplish the proposed grading; 4. | Where necessary, slope stability studies, and recommendations and conclusions regarding site geology; and 5. | Effect of the development on adjacent properties. Recommendations included in the report and approved by the Building Official shall be incorporated in the grading or paving plans and specifications. J104.7 Engineering Geology Report. The engineering geology report prepared by a registered geologist required by Section J104.3 shall include at least the following: 1. | An adequate description of the geology of the site, conclusions, and recommendations regarding the effect of geologic conditions on the proposed development; 2. | Opinions and recommendations covering the adequacy of sites to be developed by the proposed grading or construction; and 3. | Analysis of seismic activity and seismic fault zones and their influence of the proposed development. Recommendations included in the report, and approved by the Building Official, shall be incorporated in the grading plans or specifications. J104.8 Liquefaction Study. For sites with mapped maximum considered earthquake spectral response accelerations at short periods (Ss) greater than 0.5g as determined by Chapter 11 of ASCE 7, a study of the liquefaction potential of the site shall be provided and the recommendations incorporated in the plans. Exception: A liquefaction study is not required where the Building Official determines from established local data that the liquefaction potential is low. J104.9 Drainage Report. Developments in excess of one acre, and using a subsurface drainage system shall submit a drainage study prepared by a civil engineer. The drainage report shall use the Los Angeles County Department of Public Works Hydrology Handbook methodology. A design frequency of 50-years shall be used for all developments located within sumped areas or required to retain drainage on site. All other developments may use a design frequency of 25-years. J104.10 Hillside Landscaping Report. The landscaping report required by J104.3 shall include a plant list and data regarding the nature and method for promotion of growth of ground cover plants and shrubs to protect the slopes against erosion, conclusions, and recommendations for planting procedures, and criteria for corrective measures when necessary; and opinions and recommendations covering adequacy of protection of sites to be developed by the proposed grading. This report shall be prepared by a licensed landscape architect and approved by the Building Official. Recommendations included in the report and approved by the Building Official shall be incorporated in the grading plans or specifications. J104.11 Issuance. The provisions of Sections 107.3, 107.4 and 107.5 of the California Building Code are applicable to grading permits. The Building Official may require that grading or paving operations and project designs be modified if delays occur which incur weather-generated problems not considered at the time the permit was issued. Grading and paving operations on a single site may be conducted under a single permit provided fees have been paid. The Building Official may require professional inspection and testing by the geotechnical engineer. When the Building Official has cause to believe that geologic factors may be involved, the grading will be required to conform to engineered grading. J104.12 Stockpile Permit. The Building Official may issue a permit to stockpile soil on a lot upon submission by the owner of such a lot or his authorized agency, a scaled plan showing the lot dimensions, location in which the stockpile is to be placed, the approximate amount of soil to be stockpiled, height of stockpile and method of dust and erosion control. Soil so stockpiled must not be disturbed or leveled unless a regular grading permit has been obtained for the work. Stockpile permits shall be valid for no longer than 180 days unless a written extension request is received from the owner, or his authorized agency, and approved by the Building Official. J104.13 Bonds. [Administrative] a) | General. The Building Official may require bonds in such form and amounts as may be deemed necessary to assume that the work, if not completed in accordance with the approved plans and specifications, will be corrected to eliminate hazardous conditions or assure performance under conditions imposed by the pertinent governing body. When required, bonds shall be filed with the Building Official for the benefit of the City prior to the issuance of the permit for grading. The bond shall be on a form approved by the Building Official, executed by the owner and a corporate surety sufficient to cover correction elimination of hazardous conditions or to assure completion of conditions imposed by the pertinent governing body. b) | Hillside. Bonds shall be required for excavation or fill of earth in a hillside area unless the Building Official determines that the proposed grading is neither actually or potentially hazardous. c) | Cash Bond. In lieu of a surety bond the applicant may file a cash bond or instrument of credit with the Building Official in an amount equal to that which would be required in the surety bond. d) | Conditions of the Bond. Every bond shall be conditioned such that the owner shall: 1. | Comply with all applicable provisions of this Code and all other applicable laws. 2. | Comply with all of the terms and conditions of the grading permit to the satisfaction of the Building Official. 3. | Complete all of the work described by the permit, and the plans and specifications relating thereto, within the time limit specified in the permit. Upon application by the permittee, the Building Official, for sufficient cause, may extend the time specified in the permit, but no such extension shall release any surety on the bond. 4. | Install temporary erosion control devices when required to do so by the provisions of this Chapter. e) | Term of the Bond. The term of each bond shall begin upon the date of filing with the City and shall remain in effect until the completion of the work to the satisfaction of the Building Official or until replaced by a new bond in the event of a change of ownership. In the event of a failure to complete the work and failure to comply with all of the conditions and terms of the permit, the Building Official may order the work to be completed as required by the permit and to the satisfaction of the Building Official. f) | Bond Amount. The amount of the bond shall be based upon the number of cubic yards of material in either excavation or fill, whichever is the greater amount, and in addition shall include the cost of all drainage or other protective devices as may be required by the civil engineer and approved by the Building Official. That portion of the bond valuation covering the costs of excavation or fill shall be computed as set forth in Table B-J-A, unless increased by the Building Official. TABLE B-J-A—BONDS 1 to 10,000 cubic yards Over 10,001 cubic yards | $10.00 per cubic yard $100,000 plus $5.00 for each additional cubic yard in excess of 10,000 Minimum Grading Bond | $10,000

Ask a question about Torrance law

Corpus searches the Torrance sections it holds and shows the ones that match, with their citations. Free, no sign-in.