§ 81.2.52 — Fills. [Geological]

Municipal Code, City of Torrance, California · Torrance Municipal Code § 81.2.52

Corpus is an independent public-information project, not the official City of Torrance website. Stable reference: corpuslaw.us/code/8948590f-e62e-43b6-8571-584a0d06198f

§ 81.2.52: Fills. [Geological]

Section J107 of Appendix J of the California Building Code, 2025 Edition, is hereby deleted in its entirety and a new Section J107 added to read in its entirety as follows: J107 Fills. J107.1 General. Unless otherwise recommended in the approved geotechnical engineering report, fills shall conform to the provisions of this section. In the absence of an approved geotechnical engineering report, these provisions may be waived for minor fills not intended to support structures. J107.2 Preparation of Ground. Fill slopes shall not be constructed on natural slopes steeper than two to one. The ground surface shall be prepared to receive fill by removing vegetation, noncomplying fill, topsoil and other unsuitable materials scarifying to provide a bond with the new fill and where slopes are steeper than five to one, and the height is greater than five (5) feet, by benching into sound bedrock or other competent material, as determined by the geotechnical engineer. The bench under the toe of a fill on a slope steeper than five to one shall be at least ten (10) feet wide. The area beyond the toe of fill shall be sloped for sheet overflow or a paved drain shall be provided. When fill is to be placed over a cut, the bench under the toe of the fill shall be at least ten (10) feet wide but the cut shall be made before placing the fill and acceptance by the geotechnical engineer or engineering geologist or both as a suitable foundation for fill. Unsuitable soil is soil which, in the opinion of the Building Official or the civil engineer or the geotechnical engineer or the geologist, is not competent to support other soil or fill, to support structures, or to satisfactorily perform the other functions for which the soil is intended. J107.3 Fill Material. Detrimental amounts of organic material shall not be permitted in fills. Except as permitted by the Building Official, no rock or similar irreducible material with a maximum dimension greater than twelve (12) inches shall be buried or placed in fills. Exception: The Building Official may permit placement of larger rock when the geotechnical engineer properly devises a method of placement, continuously inspects its placement, and approves the fill stability. The following conditions shall also apply: 1. | Prior to issuance of the Grading Permit, potential rock disposal areas shall be delineated on the grading plan. 2. | Rock sizes greater than twelve (12) inches in maximum dimension shall be ten (10) feet or more below grade, measured vertically. 3. | Rocks shall be placed so as to assure filling of all voids with fines. J107.4 Compaction. All manufactured fills shall be placed on natural undisturbed material or approved compacted fill, and compacted to a minimum of 90 percent relative compaction as determined by ASTM D 1557. Every manufactured fill shall be tested for relative compaction by a soil testing agency approved by the Building Official. A compaction report including a Certificate of Compliance setting forth densities so determined shall be submitted to the Building Official for review before approval of any fill is given. Exception: 1. | The Building Official may approve uncompacted fill in self-contained areas where the fills are not to be used to support buildings or structures and no hazard will be created. 2. | Compaction report is not required for gravel backfill behind retaining walls provided the following conditions are met: (a) | The retaining wall does not exceed 5 feet in height from the bottom of the footing to the top of the wall. (b) | The maximum distance between the retaining wall and the backcut shall not exceed 24 inches. (c) | The gravel backfill shall be mechanically compacted and covered with concrete pavement or be capped with a 24-inch thick soil blanket mechanically compacted to the Building Official's satisfaction. 3. | The gravel backfill does not provide vertical or lateral support for any structures or adverse bedding planes. J107.5 Slope. The slope of fill surfaces shall be no steeper than is safe for the intended use. Fill slopes shall be no steeper than two (2) horizontal to one (1) vertical unless justified by a geotechnical report or engineering data. J107.6 Grade. All lots shall have a minimum grade of one (1) percent unless waived by the Building Official. The lot shall be graded to drain to the adjacent street(s). If the natural grade of any lot slopes away from the adjacent street an average grade greater than two (2) percent, or if the grade of adjacent lots causes adherence to the provisions of this section to not be in the best engineering practices, then the Building Official may allow an alternate method of conducting the drainage to adjacent streets as provided in Section J109. All paved parking areas, except driveways, shall have a maximum grade of ten (10) percent unless waived by the Building Official. J107.7 Subgrade. All areas over which paving is to be placed shall be prepared in accordance with Sections J107.2, J107.3 and J107.4. Before the placing of pavement or before the construction of any structures, the geotechnical engineer shall approve or certify as to the conformance of the fill. J107.8 Pavement. J107.8.1 Asphalt Concrete Payment. Asphalt Concrete Pavement shall be designed to be of sufficient thickness to safeguard against damage due to soil and load conditions. Pavement sections may be designed by a geotechnical engineer or civil engineer in compliance with the California RValue Method and approved by the Building Official. However, asphalt concrete shall not be less than two (2) inches in thickness. Minimum asphalt concrete pavement designed shall conform to the following: two (2) inches of asphalt concrete on four (4) inches of untreated rock base on sandy soils, and two (2) inches of asphalt concrete on six (6) inches of untreated rock base on expansive soils. Pavement shall have a minimum grade of one (1) percent unless waived by the Building Official. J107.8.2 Portland Cement Concrete. Portland Cement Concrete paving shall consist of not less than three and one-half (3½) inches in thickness for sandy soils or 3½ inches in thickness over four (4) inches of select material base for expansive soils. Concrete shall have a minimum grade of 0.4 percent unless waived by the Building Official. J107.8.3 Minimum Material Standards. Base material, asphaltic concrete, and Portland Cement Concrete shall be of a type approved by the Building Official. The Building Official may require base compaction to a minimum of ninety-five (95) percent of maximum density as determined by ASTM D 1557. Field density shall be determined in accordance with ASTM D 1556, ASTM D 2167, ASTM D 2937 or ASTM D 2922 and ASTM D 3017.

Ask a question about Torrance law

Corpus searches the Torrance sections it holds and shows the ones that match, with their citations. Free, no sign-in.