§ 81.2.55 — Completion of work. [Administrative]
Municipal Code, City of Torrance, California · Torrance Municipal Code § 81.2.55
Corpus is an independent public-information project, not the official City of Torrance website. Stable reference: corpuslaw.us/code/54d9bfa8-373d-4062-9f57-57185d484638
§ 81.2.55: Completion of work. [Administrative]
Section J112 is added to read in its entirety, as follows: J112 Completion of Work. J112.1 Final Reports. Upon completion of the rough grading work and at the final completion of the work, the following reports and drawings and supplements thereto shall be required unless waived by the Building Official: 1. | If substantial changes, as determined by the Building Official, have taken place from the approved grading plan, an as-graded grading plan or paving plan prepared by the individual of record, including original ground surface elevations, as-graded ground surface elevations, lot drainage patterns and locations, and elevation of all surface and subsurface drainage facilities. In addition, the Building Official shall state that to the best of his knowledge the work was done in accordance with the final approved grading plan or paving plan. 2. | A report prepared by the geotechnical engineer retained to provide such services in accordance with Section J104.2, including locations and elevations of field density tests, summaries of field and laboratory test, a statement that all subdrains were inspected prior to backfill, other substantiating data and comments on any changes made during grading and their effect on the recommendations made in the approved geotechnical engineering investigation report. The geotechnical engineer shall provide a professional opinion of the suitability of the fill material and their placement, and the ability of the natural materials to support the compacted fill without excessive settlement of the fill or potential damage to structures erected thereon; geotechnical engineers shall submit a statement that, to the best of their knowledge, the work within their area of responsibilities is in accordance with the approved geotechnical engineering report and applicable provisions of this chapter. 3. | A report prepared by the engineering geologist retained to provide such services in accordance with Section J104.2, including a final description of the geology of the site and any new information disclosed during the grading and the effect of same on recommendations incorporated in the approved grading plan. The report shall include the geologist’s certification that inspections were performed on all cut and fill slopes prior to placement of fill material. Engineering geologists shall submit a statement that, to the best of their knowledge, the work within their area of responsibility is in accordance with the approved engineering geologist’s report and applicable provisions of this chapter. 4. | The grading contractor shall submit in a form prescribed by the Building Official a statement of conformance to said as-built plan and the specifications. 5. | A landscape planting report prepared by the landscape architect, including a final planting list and layout of the planting of the hillside area. The Building Official shall provide approved the adequacy of the planting for the intended use. 6. | Final grading certification from geotechnical engineer, civil engineer, and licensed surveyor indicating that project(s) were completed per the approved plans shall be provided to the Building Official upon the completion. J112.2 Notification of Completion. The permittee or his agent shall notify the Building Official when the grading operation is ready for the final inspection. Final approval shall not be given until all work, including installation of all drainage facilities and their protective devices and all erosion control measures, have been completed in accordance with the final approved grading plan and the required reports have been submitted.
Ask a question about Torrance law
Corpus searches the Torrance sections it holds and shows the ones that match, with their citations. Free, no sign-in.
