Sec. 13-236.1. - General provisions.
Subdivision design improvement items shall be governed by the following provisions: (1) Conflict manholes. All conflict manholes must have approval of the appropriate state, county and city reviewing agencies before being permitted by the engineering division, and must conform to the requirements of section 13-236 of this division. This shall also apply to field changes. (2) Detection aid. After nonmetallic utilities or conduit have been installed, but before backfill has progressed beyond the top of these facilities, approved electro-magnetic location devices or metallic tape shall be placed with the conduit or utility. (3) Utility crossings. Each underground utility crossing of paved city roads shall be made by the "jack and bore" method, unless an alternate method is approved by the city engineering division. Proposed open cuts shall be shown on the drawings submitted for approval. When a pipe is driven through the earth under pavement, jetting, or the use of air or water forced into direct contact with the earth shall be prohibited. Pipe driving shall leave no voids in the underlying earth. This requirement does not prohibit the use of air hammers for driving. (4) Extraction of pipe from bore. The extraction of pipe or conduit from beneath any roadway, generally, is prohibited. In extreme situations, where pipe must be removed, the roadway must be trenched and later restored in accordance with the city's utility and engineering standards manual. (5) Removal of pavement, drives, sidewalks, curbs and gutters. Edges of permanent type pavement shall be pre-cut straight, clean and square beyond any damaged base area including well point locations. Utility cuts in existing pavement shall be restored as indicated in the city's utility and engineering standards manual. When the removal of sidewalks, curbs or gutters is necessary for construction, they shall be removed in full sections or a minimum of five (5) feet in length, and all broken edges cut smooth by use of a suitable power saw or other appropriate means. (6) Abandoned facilities. All exposed facilities and such underground facilities as may be designated by the engineering division that are abandoned within the public right-of-way, shall be removed by the owner of the facility unless other provisions are approved by the engineering division. Any abandoned facility allowed to remain in the right-of-way shall continue to be the responsibility of the owner or operator by whom last used. Such owner or operator shall be liable for all costs arising from the presence of the abandoned facility in the right-of-way. This section does not apply to facilities required to remain in place by the engineering division. (7) Restoration of right-of-way. The entire work area utilized for the performance of any permitted work shall be restored by the permittee to the condition that existed before work began except as required by the nature of the permitted work. Paved sections shall conform in type, shape, elevation and texture with adjacent paved areas and shall be of at least equal quality. Design mixes for flexible pavement shall be subject to approval by the engineering section. All damaged or undermined areas of existing pavement, not previously removed, shall be removed and restored in the specified manner. Where pavement is removed for installation, maintenance or removal of any underground facility, restoration shall be in accordance with the city's utility and engineering standards manual. Equipment shall not travel over loose rock fragments or other hard material lying on sections of pavement which are not to be removed. (8) Disposition of excavated materials. Broken pavement and other debris, shall be removed from the site as soon as practical, unless otherwise directed by the engineering division. Excavated materials shall not be stockpiled in the right-of-way during construction without specific approval of the engineering division. All excess materials shall be removed from the work site and disposed of legally by the permittee at his own expense. (9) Bracing and shoring. Sheeting, bracing, etc., shall be used as required to support the sides of the excavation and to prevent any movements which can in any way alter the grade of or injure the facility being installed, diminish the width of excavation or otherwise injure or delay the work or endanger personnel, adjacent pavements or other structures. Safety procedures shall be followed and adequate protection shall be furnished to all personnel as required by OSHA. All sheeting or bracing which is not left in place is to be removed in a manner that will not endanger the work, personnel or adjacent structures. (10) Traffic and utility controls. Excavation for pipe, structures or cable laying operations shall be conducted in a manner that will cause the least interruption to traffic. To the extent possible, fire hydrants, valve boxes, fire and police call boxes and other utility controls shall be left unobstructed and accessible during the construction period. When such obstruction is unavoidable, it must be the minimum amount necessary to accomplish the construction. The contractor shall give sufficient notice, preferably forty-eight (48) hours in advance to the affected parties to allow other provisions to be made. (11) Backfilling embankments. Backfill material shall be placed in layers not to exceed eight (8) inches in thickness, with each layer carefully compacted to ninety-eight (98) percent of maximum density, per AASHTO (T-99-C). Density tests shall be taken in each lane and shoulders at intervals of five hundred (500) feet or not less than or one thousand two hundred (1,200) square feet as approved by the engineering division. (12) Backfilling pits and trenches. After a structure, cable, conduit or pipe is acceptably installed, tested and approved, backfilling shall be done with approved material. In dry trenches, except those covered in Item 13, below, backfill material shall be placed evenly and carefully around and over the pipe in twelve (12) inch maximum layers, each layer being thoroughly compacted, until one (1) foot of cover exists above the crown of the pipe. The remaining trench portion up to the pavement base shall be backfilled in layers not exceeding eight (8) inches with each layer being compacted to one hundred (100) percent and tested at intervals of one hundred (100) feet maximum before placing succeeding layers. Swale areas shall be compacted to ninety-eight (98) percent of maximum, and testing shall be at the city engineering inspector's discretion. All materials shall be able to pass through a six-inch ring. Laboratory testing for the optimum moisture and maximum soil density shall conform to the specifications of AASHTO T-99-C (Standard Proctor). Restoration of the roadway shall be in accordance with the city's utility and engineering standards manual as applicable. At the contractor's option, with the approval of the engineer of record, and with the city project engineer's approval, after the compacted backfill has reached the centerline of the newly installed pipe or conduit, the remaining trench backfill may be placed to one (1) foot above the ground water level without interim compaction, provided that the water is allowed to rise in the trench to its natural level and then be pumped down to the pipe invert, at least twice. The balance of the trench backfill must then be placed and compacted as described for dry trenches. (13) Backfilling narrow trenches. Narrow trenches, not greater than six (6) inches in width, containing not more than two (2) three-inch cables or one (1) four-inch pipe or conduit may be backfilled with clean sand to a point two (2) inches above the cable or conduit. The remainder of the trench shall be filled to a point two (2) or three (3) inches below the finished roadway surface with a one to ten (1:10) mixture of Portland cement and sand, placed with and allowed to set overnight. The top three (3) inches of the trench may be filled with sand when the concrete is wet. The sand shall be removed on the following day and the permanent asphalt patch placed and rolled in. (14) Disposal of water from excavation. Adequate provisions shall be made for the satisfactory disposal of water resulting from de-watering or pumping operations or from encounters with water in any manner. The method of handling or disposing of such water shall be in accordance with applicable regulations of all agencies having jurisdiction including, but not limited to, the City of Coconut Creek, the State Health Department, the State Department of Environmental Regulation and the Broward County Water Resources Management Division and Broward County Department of Natural Resource Protection. (15) Maintenance of traffic. When a plan is required for maintenance of traffic (MOT) the contractor shall adhere to such plan as approved, in strict accordance with the provisions of the Manual of Uniform Traffic Control Devices, through the construction period. Temporary measures shall be taken, if necessary, to provide a minimum of one (1) lane of traffic in each direction on each affected road at all times, unless specific permission is obtained from the engineering division to deviate from this requirement. Contractor must also provide for vehicular access to each home and place of business or assembly abutting the affected right-of-way. The right-of-way must be maintained by the contractor in safe and drivable condition until the permitted work is complete and the right-of-way is restored and accepted for maintenance by the engineering division. The latter provision shall be in effect under all weather conditions, twenty-four (24) hours per day, every day, from the commencement of work until final acceptance by the engineering division, except in time of emergency. (16) Job site safety. All permitted work must be done in strict accordance with the provisions of the Occupational Safety and Health Administration (OSHA) Regulations, and all other applicable codes.
(Ord. No. 122-94, § 5, 5-26-94; Ord. No. 2001-023, § 3, 6-28-01)
Ask a question about Coconut Creek law
Corpus searches the Coconut Creek sections it holds and shows the ones that match, with their citations. Free, no sign-in.