Sec. 13-239. - Roadways and pavement.

(a) Street and pavement. Streets shall be graded to the full width of the right-of-way and shall be filled, excavated or constructed in accordance with the minimum requirements set forth in this article and as follows: (1) Street pavement: a. Transverse slope—2 percent b. W/gutter, longitudinal slope—0.2 (minimum) percent c. W/swales, longitudinal slope—0.4 (minimum) percent (2) Shoulder, transverse slope—2 to 6 percent; 8 percent for local streets (3) Inverted crown pavement: a. Transverse slope—1 percent b. Longitudinal slope—0.5 (minimum) percent (4) Earthen embankments—2:1 to 6:1 (horizontal: vertical) (b) Construction of street paving generally. Minimum pavement widths shall be in conformance with minimum standards as set forth in section 13-237. Pavement shall be constructed in accordance with standards and specifications of this article or where applicable, approved by the county and state. (c) Geotechnical report. A geotechnical investigation report, including but not limited to, test drilling, SPT (standard penetration test) and soil test data, shall be prepared by the developer. The report shall contain adequate information to support the design of streets, drainage facilities, utilities, buildings and other facilities. (d) Unsuitable materials to be removed. Vegetation, muck and any other deleterious or organic noncompactible or similarly unsuitable material within the right-of-way limits of all streets and alleys shall be removed and replaced with clean fill material free of stumps, large roots or other matter not suitable for inclusion in roadway fill as determined by the city engineer. (e) Construction of new pavement. As a minimum, all street pavements within the city shall consist of an eight-inch (compacted thickness) limerock base and a one and one-half-inch Type S-I or S-II asphalt concrete surface course. Pavement and base materials and thickness shall comply with Florida Department of Transportation standards. (1) The subbase shall comply with the stabilization requirements of the state department of transportation standard specifications. Subbase compaction density shall be, at the minimum, ninety-eight (98) percent of the maximum density as determined by AASHTO T 180. (2) Limerock base shall conform to state department of transportation standard specification section 911 and shall have a minimum percentage of carbonates (calcium and magnesium) of seventy (70) percent a liquid limit less than 35, and a plasticity index less than 6, and a limerock bearing ratio (LBR) of 100. Limerock materials from a rock pit, approved by the Florida Department of Transportation, shall be determined by the city engineer. (3) Compaction density requirements shall be as follows: The full depth of the base shall be compacted to a density of ninety-eight (98) percent of maximum density as determined by AASHTO T 180 (Modified Proctor). The minimum density acceptable at any location shall be ninety-six (96) percent and in determining the average, one hundred two (102) percent shall be the maximum used. (4) All pavement shoulders shall have a six-foot width stabilized to an LBR value of at least forty (40). The minimum depth of the stabilized shoulder shall be eight (8) inches. All shoulders shall be compacted to ninety-eight (98) percent of maximum density as determined by AASHTO T-99C. (5) All curb elements shall have a foundation or "pad" with a minimum LBR ratio of seventy (70) and shall be at least four (4) inches in thickness, extending six (6) inches (min.) beyond the edges of the concrete, compacted to ninety-eight (98) percent of the maximum density, per AASHTO (T-180), unless otherwise approved. (6) Bottom of swales, measured from top to turf, shall be at least four (4) inches below the edge of adjoining pavement. Swales shall be compacted to ninety-eight (98) percent of maximum density, per AASHTO T-99-C. (7) The top of asphalt or concrete driveway connection with adjoining pavement through the swale should be two (2) inches below the edge of the adjoining pavement at the center of the swale. (f) Listing. As the road construction proceeds and the developer indicates the area is compacted and ready for testing (carbonate, LBR, and density tests), the city engineer shall specify locations for testing and the number of tests to be conducted. One (1) density test shall be required for every lift of fill placed in continuously constructed areas over time or every two thousand four hundred (2,400) square feet of fill, whichever is less. The developer shall pay for carbonate, LBR and density tests required by the engineer. (g) Surface course. The surface course shall consist of a 1½-inch layer of Type S-I or S-III asphaltic concrete as specified in sections 310 and 331 of the Florida department of transportation's Standard Specifications for Road and Bridge Construction. A prime coat will be required as specified in section 300 of such specifications. A tack coat shall be used between paving courses, and a prime coat shall be used on the finished rock base. Depending on the nature and duration of the development, the city engineer, at his option, may require the placement of asphaltic concrete in the following sequence: the first three-fourths-inch layer shall be installed in conjunction with the initial site development; the final three-fourths-inch layer with appropriate striping and markings shall be installed after eighty (80) percent of the building is completed. Wearing surface courses shall not be placed on public streets until all underground utilities are installed and accepted, and a finished rock survey has been submitted to the engineering division and accepted. (h) Acceptance of pavement by city. New pavement will not be accepted by the city until all of the requirements stated in this division are met. In addition, all damage to new and existing pavement caused by the developer, such as damage due to construction traffic, shall be repaired by the developer. The public improvement bond shall be retained by the city until this condition, along with conditions for release stated in this article are met. (i) Restoration of existing pavement. Restoration of existing street pavement shall be in accordance with the city's utility and engineering standards manual and the following standards: (1) A permit from the city engineer shall be required to open or cut any pavement, street or median or alter or cut any swale, exclusive of plantings, or any curb adjacent to any street or thoroughfare. (2) For fees, see Division 4 of Article I of this chapter. (3) The city engineer shall have jurisdiction and shall inspect any restoration two (2) times during the course of restoration. One (1) such inspection shall be made prior to the placement of any Portland cement concrete or asphalt concrete and the second inspection shall be a final inspection at the completion of the restoration. (4) Restoration of existing street pavement shall be in accordance with the methods designated in the city's utility and engineering standards manual. All other areas and/or cuts such as median, curb or swale, shall be restored to original condition. (5) Any restoration as provided for in this division shall be completed within forty-eight (48) hours from the cutting of the pavement, street, curb, median or swale or within such time as approved in writing by the city engineer. Any settlement occurring within a wearing period of ninety (90) days following restoration, which causes depression of the restored surface, shall be repaired by the developer as determined necessary by the city engineer. (6) During the course of cutting and restoring any thoroughfare or street which consists of more than one (1) lane in either direction, not more than one (1) lane in either direction may be rendered impassable by traffic at any given time. Where practical, steel plates shall be used to facilitate through traffic during the period of construction. In all cases the time during which work will be permitted shall be governed by the city engineer. (7) Any person who applies for a permit described in this article, shall at the time of such application, post a performance bond in an amount equal to the estimated cost of the work to be done, including required replacement, plus an additional twenty-five (25) percent thereof. The amount of the bond shall be determined by the city engineer. The bond shall be in cash or shall be executed by a surety company acceptable by the city and shall be conditioned upon the faithful performance of all the requirements of this section. The bond shall be retained by the city until the ninety-day wearing period has passed and necessary repairs have been completed and approved by the city engineer. If there is a failure to perform as required under this section, the bond shall be immediately forfeited to the city for the purpose of fulfilling the requirements of this section together with all necessary and reasonable costs. The city engineer may, however, dispense with the requirement of the posting of a bond where the work to be done is performed by or under the contract for a company or corporation having a franchise within the city. Such action shall be within the discretion of the city engineer. (j) Temporary facilities, unrelated to any ongoing construction in the right-of-way, and intended to provide an essential service for a period of time not to exceed five (5) years, may be constructed in the right-of-way, contingent upon engineering division approval of project plans and specifications, and issuance of an engineering construction permit. There will be no relaxation of safety requirements, but lighter duty construction will be allowed, where public interest will not be adversely affected. A performance bond shall be required to assure replacement of the temporary roadway with the ultimate roadway section after the fifth year or as conditions may deem necessary. (k) In cases where temporary facilities must be constructed to provide or maintain an essential feature around portions of a public right-of-way for public safety or convenience during construction, such temporary facility construction plans must be resubmitted be clearly drawn in sufficient detail on standard size drafting sheets, and submitted to the engineering division for review and approval prior to implementation.

(Ord. No. 115-86, § 211.04, 7-10-86; Ord. No. 159-87, § 211.04, 6-11-87; Ord. No. 2001-023, § 3, 6-28-01)