For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13-274 — Testing

Code of Ordinances of the City of Coconut Creek, Florida (Codified through Ordinance No. 2026-016, enacted June 25, 2026. (Supp. No. 6)) · Coconut Creek Code of Ordinances § 13-274

Corpus is an independent public-information project, not the official City of Coconut Creek website. Stable reference: corpuslaw.us/code/8bbc2e42-c60f-4568-baca-6a0f7382212b

Sec. 13-274. - Testing.

The developer shall pay for all required tests. All tests including but not limited to hydrostatic pressure tests, bacteriological tests, mandrel tests, lamping, television inspection, compaction and density tests, limerock quality tests, concrete compression tests, pump station start ups, etc., shall be conducted with the city inspector as a witness. The developer shall notify the designated city inspector forty-eight (48) hours in advance of performance of the test. For material such as asphaltic concrete, pipe valves and other equipments, the manufacturer's certification on the material specification may be accepted subject to verification by the city engineer of test methods used.

(Ord. No. 115-86, § 211.2003, 7-10-86; Ord. No. 159-87, § 211.2003, 6-11-87)

Ask a question about Coconut Creek law

Corpus searches the Coconut Creek sections it holds and shows the ones that match, with their citations. Free, no sign-in.