Sec. 28-10. - Redevelopment.
(a) Plans and Requirements. Unless otherwise specified by watershed management plans developed in accordance with this article, stormwater management plans are required for all redevelopment. Stormwater management measures must be consistent with the Design Manual. (b) Impervious area reduction. All redevelopment designs shall: (1) Reduce existing impervious area within the LOD by at least 50% percent according to the Design Manual; (2) Implement ESD to the MEP to provide water quality treatment for at least 50% of the existing impervious area within the LOD; or (3) Use a combination of paragraphs (1) and (2) of this subsection for at least 50% of the existing site impervious area. (c) Alternative stormwater management measures. Alternative stormwater management measures may be used to meet the requirements in subsection (b) of this section if the applicant satisfactorily demonstrates to the City Engineer that impervious area reduction has been maximized and ESD has been implemented to the MEP. Alternative stormwater management measures include, but are not limited to: (1) An on-site structural BMP; (2) An off-site structural BMP to provide water quality treatment for an area equal to or greater than 50% of the existing impervious area; or (3) A combination of impervious area reduction, ESD implementation, and an on-site or off-site structural BMP for an area equal to or greater than 50% of the existing site impervious area within the LOD. (d) Alternatives for providing water quality treatment. (1) The City may develop separate policies for providing water quality treatment for redevelopment projects if the requirements of subsections (b) and (c) of this section cannot be met. Any separate redevelopment policy shall be reviewed and approved by the Administration and may include, but not be limited to: (A) A combination of ESD and an on-site or off-site structural BMP; (B) Retrofitting including existing BMP upgrades, filtering practices, and off-site ESD implementation; (C) Participation in a stream restoration project; (D) Pollution trading with another entity; (E) Payment of a fee-in-lieu; or (F) A partial waiver of the treatment requirements if ESD is not practicable. (2) The determination of what alternatives will be available may be made by the City Engineer at the appropriate point in the development review process. The City Engineer shall consider the prioritization of alternatives in subsection (d) of this section after it has been determined that it is not practicable to meet the 2009 regulatory requirements using ESD. fn deciding what alternatives may be required, the City Engineer may consider factors including, but not limited to: (A) Whether the project is in an area targeted for development incentives such as a priority funding area, a designated transit oriented development area, or a designated base realignment and closure revitalization and incentive zone; (B) Whether the project is necessary to accommodate growth consistent with the City's comprehensive plan; or (C) Whether bonding and financing have already been secured based on an approved development plan. (e) Net Increase in Impervious Area. Stormwater management shall be addressed according to the new development requirements in the Design Manual for any net increase in impervious area.
(Ord. No. G-24-04, § I, 5-2-24)
Ask a question about Frederick law
Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.