§ 28-18 — Inspection
Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 28-18
Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/8075b4f0-b713-4c68-af2d-9ed8cdcdfd2d
Sec. 28-18. - Inspection.
(a) Inspection schedule and reports. (1) No grading or other site work may be started until after a pre-construction meeting between the City Engineer, a City projects inspector, and the applicant. The applicant shall contact the Engineering Division to request this meeting. (2) Regular inspections shall be made and documented for each ESD planning technique and practice at the stages of construction specified in the Design Manual by the City, its authorized representative, or certified by a Maryland licensed professional engineer. At a minimum, all ESD and other nonstructural systems shall be inspected upon completion of final grading, the establishment of permanent stabilization, and before issuance of use and occupancy approval. (3) Written reports shall be prepared for every inspection and must include: (A) The date and location of the inspection; (B) The inspector's name and observations of the site; (C) Whether construction was in compliance with the approved stormwater management plan; (D) Any observed variations from the approved construction specifications; and (E) Any violations that exist. (4) No work may proceed on a subsequent phase of development until the City Engineer inspects and approves the work completed on the previous phase. The City Engineer will provide copies of the inspection reports to the applicant. (5) Once construction is complete, "as-built" plan certification shall be prepared by a Maryland licensed professional engineer or Maryland licensed professional land surveyor to ensure that ESD planning techniques, treatment systems, and structural stormwater management measures and conveyance systems comply with the specifications contained in the approved plans. "As-built" certification shall include a set of drawings comparing the approved stormwater management plan with what was constructed. The City Engineer may require additional information or certifications. (6) The owner or applicant and on-site personnel shall be notified in writing when violations are observed. Written notification shall describe the nature of the violation and the required corrective action. (b) Inspection requirements during construction. Regular inspections shall be made and documented at the following stages of construction: (1) For ponds: (A) Upon completion of excavation to sub-foundation and when required, installation of structural supports or reinforcement for structures, including but not limited to: (i) Core trenches for structural embankments; (ii) Inlet and outlet structures, anti-seep collars or diaphragms, and watertight connectors on pipes; and (iii) Trenches for enclosed storm drainage facilities; (B) During placement of structural fill, concrete, and installation of piping and catch basins; (C) During backfill of foundations and trenches; (D) During embankment construction; and (E) Upon completion of final grading and establishment of permanent stabilization. (2) For wetlands: (A) At the stages specified for pond construction in subsection (b)(1)(A) of this section; (B) During and after wetland reservoir area planting; and (C) During the second growing season to verify a vegetation survival rate of at least 50%. (3) For infiltration trenches: (A) During excavation to subgrade; (B) During placement and backfill of under drain systems and observation wells; (C) During placement of geotextiles and all filter media; (D) During construction of appurtenant conveyance systems such as diversion structures, pre-filters and filters, inlets, outlets, and flow distribution structures; and (E) Upon completion of final grading and establishment of permanent stabilization. (4) For infiltration basins: (A) At the stages specified for pond construction in this section; and (B) During placement and backfill of under drain systems. (5) For filtering systems: (A) During excavation to subgrade; (B) During placement and backfill of under drain systems; (C) During placement of geotextiles and all filter media; (D) During construction of appurtenant conveyance systems such as flow diversion structures, pre-filters and filters, inlets, outlets, orifices, and flow distribution structures; and (E) Upon completion of final grading and establishment of permanent stabilization. (6) For open channel systems: (A) During excavation to subgrade; (B) During placement and backfill of under drain systems for dry swales; (C) During installation of diaphragms, check dams or weirs; and (D) Upon completion of final grading and establishment of permanent stabilization.
(Ord. No. G-24-04, § I, 5-2-24)
Ask a question about Frederick law
Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.