For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 28-12 — Stormwater management techniques and practices

Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 28-12

Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/21738d1e-1e9f-4012-b7e7-25eac7b58406

Sec. 28-12. - Stormwater management techniques and practices.

(a) ESD techniques and practices. The ESD planning techniques and practices and structural BMPs established in this section and the Design Manual shall be used to develop a stormwater management plan. An applicant shall demonstrate that ESD has been implemented to the MEP before the use of a structural BMP is considered in developing the stormwater management plan. (b) Infiltration. Infiltration is not permitted on sites where it has been demonstrated through geotechnical investigations consistent with Appendix D.2. (Geotechnical Methods for Karst Feasibility Testing) of the 2000 Maryland Stormwater Design Manual that infiltration practices may increase the risk of sinkhole activity on or adjacent to the site. In such instances, ESD to the MEP shall be provided through the use of non-infiltration practices and the remainder of stormwater management requirements shall be provided via lined structural facilities. (c) ESD planning techniques. The following planning techniques shall be applied according to the Design Manual to satisfy the applicable minimum control requirements established in this article, and shall not conflict with existing State law or local ordinances, regulations, or policies: (1) Preserving and protecting natural resources; (2) Conserving natural drainage patterns; (3) Minimizing impervious area; (4) Reducing runoff volume; (5) Using ESD practices to maintain one hundred (100) percent of the annual predevelopment groundwater recharge volume for sites not located in karst; (6) Using green roofs, permeable pavement, reinforced turf, and other alternative surfaces; (7) Limiting soil disturbance, mass grading, and compaction; (8) Clustering development; and (9) Any practices approved by the Administration. (d) ESD treatment practices. The following ESD treatment practices shall be designed according to the Design Manual to satisfy the applicable minimum control requirements established in this article, and shall not conflict with existing State law or local ordinances, regulations, or policies: (1) Disconnection of rooftop runoff; (2) Disconnection of non-rooftop runoff; (3) Sheetflow to conservation areas; (4) Rainwater harvesting; (5) Submerged gravel wetlands for sites not located in karst; (6) Landscape infiltration for sites not located in karst; (7) Infiltration berms for sites not located in karst; (8) Dry wells for sites not located in karst; (9) Micro-bioretention; (10) Rain gardens; (11) Swales; (12) Enhanced filters; and (13) Any practices approved by the Administration. (e) Structural BMPs. (1) Structural BMPs shall be designed in accordance with the Design Manual to satisfy the applicable general requirements established in this article: (A) Stormwater management wetlands; (B) Stormwater management infiltration for sites not located in karst; (C) Stormwater management filtering systems; and (D) Stormwater management open channel systems. (2) The performance criteria specified in the Design Manual with regard to general feasibility, conveyance, pretreatment, treatment and geometry, environment and landscaping, and maintenance shall be considered when selecting structural stormwater management practices. Structural stormwater management practices shall be selected to accommodate the unique hydrologic or geologic features of the City. (f) Recorded practices. ESD planning techniques and treatment practices and structural stormwater management measures used to satisfy the minimum requirements of this article must be recorded in the Land Records of Frederick County and remain unaltered by subsequent property owners. Prior approval from the City Engineer shall be obtained before any stormwater management practice is altered. (g) Alternative ESD planning techniques and practices and structural BMPs. Alternative ESD planning techniques and treatment practices and structural stormwater measures may be used for new development runoff control if they meet the performance criteria established in the Design Manual and all subsequent revisions and are approved by the Administration. Practices used for redevelopment projects shall be approved by the City Engineer. (h) Stormwater flow analysis. For the purposes of modifying the minimum control requirements or design criteria, an applicant shall submit to the City Engineer an analysis of the impacts of stormwater flows downstream in the watershed. The analysis shall include hydrologic and hydraulic calculations necessary to determine the impact of hydrograph timing modifications of the proposed development upon a dam, highway, structure, or natural point of restricted streamflow. The point of investigation is to be established with the concurrence of the City Engineer downstream of the first downstream tributary whose drainage area equals or exceeds the contributing area to the project or stormwater management facility.

(Ord. No. G-24-04, § I, 5-2-24)

Ask a question about Frederick law

Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.