For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 28-11 — Minimum control requirements

Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 28-11

Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/f86d1ee6-dfbe-47ee-a355-47d9f9d1032e

Sec. 28-11. - Minimum control requirements.

The minimum control requirements established in this section and the Design Manual are as follows: (a) Design criteria. The planning techniques, nonstructural practices, and design methods specified in the Design Manual shall be used to implement ESD to the MEP. Stormwater management plans shall be designed using ESD sizing criteria, recharge volume for sites not located in karst, water quality volume, and channel protection storage volume criteria according to the Design Manual. (b) MEP standard. The use of ESD planning techniques and treatment practices must be exhausted before any structural BMP is implemented. The MEP standard is met when channel stability is maintained, predevelopment groundwater recharge is replicated for sites not located in karst, nonpoint source pollution is minimized, and structural stormwater management practices are used only if absolutely necessary. (c) Additional management to control historical flooding. If the City Engineer determines that additional stormwater management is necessary because historical flooding problems exist, control of the two-year and ten-year frequency storm event is required according to the Design Manual and all subsequent revisions and downstream floodplain development and conveyance system design cannot be controlled. (d) Greater than minimum control may be required. The City Engineer may require more than the minimum control requirements specified in this article if hydrologic or topographic conditions warrant or if flooding, stream channel erosion, or water quality problems exist downstream from a proposed project. (e) Alternative minimum control requirements. Alternate minimum control requirements may be adopted subject to Administration approval. The Administration shall require a demonstration that alternative requirements will implement ESD to the MEP and control flood damages, accelerated stream erosion, water quality, and sedimentation. Comprehensive watershed studies may also be required. (f) Interjurisdictional flood hazard watersheds. The Carroll Creek (including its tributaries) watershed is designated as an interjurisdictional flood hazard watershed by COMAR 26.17.02.07. Development in the Carroll Creek watershed may not increase the downstream peak discharge for the 100-year frequency storm event. Additionally, development shall comply with flood management plans as approved by the Administration in accordance with the Flood Hazard Management Act of 1976 (Maryland Code, Environment Article, Title 5, Subtitle 8).

(Ord. No. G-24-04, § I, 5-2-24)

Ask a question about Frederick law

Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.