§ 28-14 — Stormwater management plans

Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 28-14

Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/23fd6c75-6d7c-42d3-aadb-baba41e03512

Sec. 28-14. - Stormwater management plans.

(a) Review and approval. Prior to any subdivision or development activity, an applicant shall submit stormwater management plans to the City Engineer for review and approval. Plan review shall be a three-step process, including: (1) A stormwater management concept plan; (2) A stormwater management development plan; and (3) A final stormwater management plan, including a final erosion and sediment control plan. (b) Coordinated comments. The City Engineer shall perform a comprehensive review of the stormwater management plans for each phase of site design. Coordinated comments will be provided for each plan phase that reflect input from all appropriate agencies and departments, including but not limited to the Soil Conservation District (SCD) and the City's Department of Public Works. The applicant must address all comments from the agencies and departments and obtain approval at each phase of project design before subsequent submissions. (c) Contents and submission. (1) Concept Plan. Prior to or concurrent with submitting an application to the Planning Division for approval of a sketch plan, site plan, preliminary subdivision plat, or master plan (whichever may occur first), an applicant shall submit a concept plan that provides sufficient information for an initial assessment of the proposed project and whether stormwater management can be provided in accordance with this article and the Design Manual. Plans submitted for concept approval shall include: (A) A map at a scale specified by the City Engineer showing site location, existing natural features, rock outcroppings, sinkholes and depressions, water and other sensitive resources, topography, and natural drainage patterns; (B) The anticipated location of all proposed impervious areas, buildings, roadways, parking, sidewalks, utilities, and other site improvements; (C) The location of the proposed limit of disturbance, erodible soils, steep slopes, and areas to be protected during construction; (D) Preliminary estimates of stormwater management requirements, the selection and location of ESD practices to be used, and the location of all points of discharge from the site; (E) A narrative that supports the concept design and describes how ESD will be implemented to the MEP; and (F) Any other information required by the City Engineer. (2) Development Plan. (A) After the City Engineer approves the concept plan, the applicant shall submit a development plan consistent with the approved concept plan and all conditions of approval; and any written waiver or variance request. The development plan must be approved prior to scheduling a Planning Commission hearing on an application for a site plan, preliminary subdivision plat, final plat, or master plan. A development plan shall include: (i) All details developed during the concept plan review phase; (ii) Final site layout, exact impervious area locations and acreages, proposed topography, delineated drainage areas at all points of discharge from the site, sufficient offsite information to substantiate drainage areas and safe conveyance computations, and stormwater volume computations for ESD practices and quantity control structures; (iii) A proposed erosion and sediment control plan that contains the construction sequence, any phasing necessary to limit earth disturbances and impacts to natural resources and an overlay plan showing the types and locations of ESD and erosion and sediment control practices to be used; (iv) A narrative that supports the site development design describes how ESD will be used to meet the minimum control requirements, and justifies any proposed structural stormwater management measure; (v) Geotechnical investigations and recommendations including soil maps; borings, site specific recommendations, and any additional information necessary for the site development stormwater management design. Geotechnical testing must be sufficient to ensure any proposed infiltration practices are feasible. Sites that have demonstrated through geotechnical investigations consistent with Appendix D.2. (Geotechnical Methods for Karst Feasibility Testing) of the Design Manual to be located in karst shall not propose ESD practices that include infiltration. Geotechnical reports shall be signed and sealed by a Maryland Licensed professional engineer; and (vi) Any other information required by the approving agency. (B) A development plan shall be submitted in a format as directed by the City Engineer and shall include a report with the narrative and all supporting computations. The plans and report shall be signed and sealed by a Maryland licensed professional engineer with the following statement: "Professional Engineer's Certification - This Site Development Stormwater Management Plan and Report has been designed in accordance with COMAR 26.17.02 and the Stormwater Management Ordinance of The City of Frederick, and in my professional opinion, meets or exceeds the intent and requirements of ESD to the MEP." (3) Final Stormwater Management Plan. (A) After a development plan has been approved, an applicant shall submit a final erosion and sediment control plan (in accordance with COMAR 26.17.01) and a final stormwater management plan that is consistent with the approved development plan and all conditions of approval. A final stormwater management plan shall be submitted as a part of the improvement plans for the applicable subdivision or development and must be approved before the City Engineer issues a grading permit for the project. A final stormwater management plan shall be submitted in the form of construction drawings and shall include: (i) A vicinity map; (ii) Existing and proposed topography (including survey source and date) including any interim grading and proposed drainage areas, including areas necessary to determine downstream analysis for proposed stormwater management facilities; (iii) Any proposed improvements including location of buildings or other structures, impervious surfaces, storm drainage facilities, and all grading; (iv) The location of existing and proposed structures and utilities; (v) All existing and proposed easements and rights-of-way, including recording references where applicable; (vi) The delineation, if applicable, of the 100-year floodplain, floodway, and any on-site wetlands; (vii) Structural and construction details including representative cross sections for all components of the proposed drainage system or systems, and stormwater management facilities; (viii) All necessary construction specifications; (ix) A sequence of construction; (x) Data for total site area, disturbed area, existing impervious area, new impervious area, total impervious area, impervious area to be treated under redevelopment requirements, and impervious area to be treated under new development requirements; (xi) A table showing the ESD and unified sizing criteria volumes required in the Design Manual; (xii) A table of materials to be used for stormwater management facility planting; (xiii) All soil boring logs and locations; (xiv) An inspection and maintenance schedule; (xv) All proposed sediment and erosion control measures including necessary details; (xvi) Certification by the applicant that all stormwater management and erosion and sediment control construction will be done according to this plan; (xvii) An as-built certification signature block to be executed after project completion; (xviii) A construction inspection checklist; and (xix) Any other information required by the City Engineer. (B) The final stormwater management plan shall also include a report that includes: (i) Geotechnical investigations and recommendations including soil maps, borings, site specific recommendations, and any additional information necessary for the final stormwater management design; (ii) Drainage area maps depicting predevelopment and post development runoff flow path segmentation and land use. The maps shall adequately show adjacent and downstream properties to the extent of any affected runoff or adverse affects; (iii) Hydrologic computations of the applicable ESD and unified sizing criteria according to the Design Manual for all points of discharge from the site; (iv) Hydraulic and structural computations for all ESD practices and structural stormwater management measures to be used; (v) A narrative that supports the final stormwater management design; (vi) Sediment and erosion control computations including, but not limited to, sediment trap and sediment basin sizing, interim sediment control drainage and area maps; and (vii) Any other information required by the City Engineer. (C) Geotechnical testing must be sufficient to ensure that any proposed infiltration practices are feasible. Sites that have demonstrated through geotechnical investigations consistent with Appendix D.2. (Geotechnical Methods for Karst Feasibility Testing) of the Design Manual to be located in karst shall not propose ESD practices that include infiltration. (D) Geotechnical reports shall be signed and sealed by a Maryland licensed professional engineer. A final stormwater management and erosion and sediment control plan and report shall include the following certification signed and sealed by a Maryland licensed professional engineer with the following statement: "Professional Engineer's Certification - This Final Stormwater Management and Sediment and Erosion Control Plan and Report has been designed in accordance with COMAR 26.17.01 and 26.17.02 and the Stormwater Management Ordinance of The City of Frederick, and in my professional opinion, meets or exceeds the intent and requirements of ESD to the MEP" (E) If a stormwater management plan involves an increase of runoff from the site to a specific study point or collectively, the applicant must obtain from adjacent property owners any easements or other necessary property interests concerning flowage of water. Approval of a stormwater management plan does not create or affect any right to change runoff patterns or volume onto adjacent property without that property owner's permission. (d) Preparation of the stormwater management plan. (1) The design of stormwater management plans shall be prepared by a Maryland licensed professional engineer. Any changes in design will require approval by the City Engineer and, where applicable, the SCD. (2) Landscaping within a BMP or pond shall be designed and specified by a Maryland licensed landscape architect. The City Engineer may waive this requirement if the design is in accordance with the standards and design practices of the MDE Design Manual, Appendix A. (3) If a stormwater BMP requires either a dam safety permit from the Administration or small pond approval from the SCD, the design shall be prepared by a Maryland licensed professional engineer. (4) Certified as-built surveys are required for all structural and nonstructural stormwater management practices. As-builts must be signed and sealed by a Maryland licensed professional surveyor for any elevations and for field run topography, and by a Maryland licensed professional engineer for all other aspects of the as-built, including but not limited to: proper installation of all materials, rebar, concrete, filter fabric, stone, sand, filter media, underdrains, and pervious concrete. (5) When a facility has been designed to meet Soil Conservation Service, Maryland Standards and Specifications, Pond Code 378-1 certification, as-built certification of construction methods and materials (378-1 specs) must be provided and sealed by a Maryland licensed professional engineer.

(Ord. No. G-24-04, § I, 5-2-24)

Ask a question about Frederick law

Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.