Sec. 28-9. - Waivers/watershed management plans.

(a) Waiver requests. Except as otherwise provided in this article, written applications for quantitative control waivers shall be submitted that contain sufficient descriptions, drawings, and any other information that is necessary to demonstrate that ESD has been implemented to the MEP. A separate written application shall be submitted in accordance with the provisions of this section if there are subsequent additions, extensions, or modifications to a development receiving a waiver. (b) Grant of waivers. A waiver may be granted only if: (1) The applicant has demonstrated that ESD has been implemented to the MEP; (2) The cumulative effects of waivers previously granted have been considered; and (3) The development will not adversely impact stream quality. (c) Quantitative control waivers. Except as otherwise provided in this article, the City Engineer may grant stormwater management quantitative control waivers only to: (1) Those projects within areas where watershed management plans have been developed consistent with subsection (f) of this section; or (2) It has been demonstrated that ESD has been implemented to the MEP; and (A) The City Engineer determines that circumstances exist that prevent the reasonable implementation of quantity control practices; (B) The project has direct discharges to tidally influenced receiving waters; or (C) The project is an infill development located in a priority funding area where the economic feasibility of the project is tied to the planned density, and where implementation of the 2009 regulatory requirements would result in a loss of the planned development density, provided that: (i) Public water and sewer and stormwater conveyance exist; (ii) The quantitative waiver is applied to the project for the impervious cover that previously existed on the site only; (iii) ESD to the MEP is used to meet the full water quality treatment requirements for the entire development; and (iv) ESD to the MEP is used to provide full quantity control for all new impervious surfaces. (d) Qualitative control waivers. Except as otherwise provided in this article, the City Engineer may grant stormwater management qualitative control waivers only to: (1) Infill development projects where ESD has been implemented to the MEP and it has been demonstrated that other BMPs are not feasible; (2) Redevelopment projects if the requirements of Sec. 28-10 of this article are satisfied; or (3) Sites where the City Engineer has determined that circumstances exist that prevent the reasonable implementation of ESD to the MEP. (e) Phased development projects. Stormwater management quantitative and qualitative control waivers may be granted for phased development projects if a system designed to meet the 2000 regulatory requirements and this article for multiple phases has been constructed by May 4, 2010. If the 2009 regulatory requirements cannot be met for future phases constructed after May 4, 2010, all reasonable efforts to incorporate ESD in future phases must be demonstrated. (f) Watershed management plans. If the City has established an overall watershed management plan for a specific watershed, then the City may develop quantitative waiver and redevelopment provisions that differ from Sections 28-9 and 28-10 of this article. A watershed management plan developed for the purpose of implementing different stormwater management policies for waivers and redevelopment shall: (1) Include detailed hydrologic and hydraulic analyses to determine hydrograph timing; (2) Evaluate both quantity and quality management and opportunities for ESD implementation; (3) Include a cumulative impact assessment of current and proposed watershed development; (4) Identify existing flooding and receiving stream channel conditions; (5) Be conducted at a reasonable scale; (6) Specify where on-site or off-site quantitative and qualitative stormwater management practices are to be implemented; (7) Be consistent with the General Performance Standards for Stormwater Management in Maryland as set forth in the Design Manual; and (8) Be approved by the Administration.

(Ord. No. G-24-04, § I, 5-2-24)