Sec. 32-102. - Hydrology storm definitions.

(a) Initial and major design storm. For the purposes of this division, every urban area has two separate and distinct storm events. One is the initial or ordinary storm system corresponding to a ten percent chance (ten-year, 24-hour) storm in any given year. The other is the major, or extraordinary, storm which corresponds to a one percent chance (100-year, 24-hour) storm in any given year. Since the effects and routing of stormwaters for the major one percent chance, 24-hour storm may not be the same as for the initial ten percent chance, 24-hour storm, all storm run-off drainage plans submitted for review and approval shall indicate the effects of the initial and the major storm. (1) Initial ten percent chance, 24-hour storm system. The ten percent chance storm drainage system shall be so designed as to provide protection against regularly occurring damage, to reduce street maintenance costs, and to provide orderly urban drainage ways. (2) Major one percent chance, 24-hour storm system. The major storm drainage system shall be so designed as not to cause property damage or loss of life from the runoff expected in a major storm event. The anticipated effects of the one percent chance storm on the ten percent chance storm drainage system shall be clearly identified in the drainage report. (3) Historic flow. The historic flow shall be defined as the peak flow rate of stormwater that enters, crosses and/or exits a proposed development in its pre-developed and undisturbed condition for both the initial (ten percent chance) and major (one percent chance) storm events. It shall be the responsibility of the developers/owners engineer to show that peak flow and volume from a proposed development or construction project does not adversely affect or impact any upstream or downstream property, up to and including the next major drainage facility, drain and/or regional ponding area as determined by the public works director or his designee. The development must not increase the peak, volume or change the location of the historic flow unless specifically allowed by the public works director. (b) Design storm frequencies. The initial ten-year/ten percent chance and major 100-year/one percent design storms shall apply to all land uses including but not limited to residential, planned unit development (PUD), general commercial, parks, and open channels. (c) Runoff computation. Total storm runoff shall be computed in accordance with the criteria set forth in this division. Runoff computations for both the ten percent chance and one percent chance storm shall be submitted with the proposed storm drainage plan. The most recent official federal (ACOE, FEMA, FIS, USDA, USGS, etc.) data and references must be used when analyzing flow that crosses any site. (d) Major arroyo crossings Roadway crossing of major arroyos by arterials will be done through a shared cost allocation process between the city and major developers in affected areas. For purposes of this section, the term "major arroyo" shall mean any channel or waterway whose watershed exceeds 1.5 mi 2 (2.6 km 2 ) and larger or a flow of 1,000 cfs (28.31 m 3 /s) and larger in a one percent design storm whether such watershed is in its natural or unaltered state or has been altered by approved development, runoff diversions, or detention facilities. (1) Funding contributions: Funding may be provided by the city for participation if such arrangements have been made and approved by the city council as part of the city's current or proposed budget process. Funding for arroyo crossings will be considered by the city council during the master plan proposal phase as well as the master plan stage when a resultant imminent public benefit will be realized by creating a critical link in the major transportation system as defined by the city and the metropolitan planning organization. The amount of the city participation in construction of such arroyo crossings may be established up to 50 percent of the construction and inspection cost. Adjustments to this value may be warranted from time to time and may be deviated from upon recommendation and justification from the public works and approval by the city council. If development is proposed where traffic generated by such proposal is without measurable public benefit, as determined by the city, then the developer will be responsible for full arroyo crossing construction. In circumstances where the city determines there is no public benefit to build an arroyo crossing, developers may be required to build the complete arroyo crossing at the time of their development. A formal request, in the form of a proposal, is required during the master plan phase when city participation is requested. When more than one developer is involved it is the responsibility of the party requesting city participation to acquire support from all parties involved. (2) Funding alternatives: There are two alternate methods for achieving cost contribution by the city for such major arroyo crossings. In both scenarios, the developer will be responsible for paying for and providing the design of the improvements for review and consideration by the city. a. Pro-rata construction cost paid by developer to the city. b. Design and participation in a voluntary special assessment district (S.A.D.) in conformance with state law. (3) Design considerations: a. The developer will be responsible for providing the engineering, design, flood mapping revisions and associated costs (if needed). b. In consideration for city participation, the developer must coordinate the design elements with city public works staff to ensure cohesion to regional open space and multi-use paths and alignments.

(Ord. No. 949, § 3.1B, 9-8-87; Ord. No. 2187, 4-4-05)

Ask a question about Las Cruces law

Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.