Sec. 32-104. - Specific analysis requirements.
(a) Requirements for storm drainage reports and construction plans. All drainage reports shall be prepared by a professional engineer, registered in the state, and shall comply with the minimum requirements and specifications set forth in this section. Review schedules will be as outlined in the subdivision and building codes. However, reports involving large developments and complex structures will require more review time. The engineer should be aware that whenever unusual or serious drainage problems are anticipated in conjunction with a proposed development, additional analysis and information beyond the minimum requirements outlined in this section may be required by the public works director or his designee of the city. The following specifications and criteria shall be used: (1) Master drainage study. a. A master drainage study shall be required prior to approval for any annexation, planned unit development, or subdivision preliminary plat. The purpose of the master drainage study is to identify major drainage ways, ponding areas, locations of culverts, bridges, open channels and drainage basins which are contributory to the proposed study area. In addition, the ability of downstream drainage facilities to pass the developed runoff from the proposed development must be analyzed in the master drainage study. The master drainage study shall contain a general outline of the proposed drainage routing plans for the development. The report shall include but not be limited to the following information and calculations: 1. Calculations for peak flow from all upstream off-site tributary drainage areas. 2. Calculations for peak flow within the proposed development for all drainage basins larger than 20 acres (8.09 ha). 3. Preliminary analysis of the one percent and ten percent chance storm floodplain and major drainage ways. 4. Closed subbasin analysis including identification of water into or out of subbasin. 5. Discussion and analysis of downstream drainage facilities. 6. Discussion of drainage problems and solutions which are anticipated within the proposed development. 7. The report shall be printed and bound on 8½-inch by 11-inch paper. 8. All drainage studies/reports must include a table of pertinent values in the body of the report. The values shall include, at a minimum, flow depth for all flow paths, peak velocity, Tc, freeboard for channels (not including streets), flow (Q), CN numbers, and volumes of runoff for basins. Drainage studies shall include maps showing both flow and volume into and out of basin(s) and proposed development. 9. Flows may need to be routed to a historic point of convergence for both the pre and post condition. b. Drawings for the master drainage study shall include but not be limited to the following: 1. Any and all floodplains and floodways must be identified. A copy of the applicable FEMA floodplain map is required indicating limits of current study. 2. Existing topography, two-foot (0.5m) contour interval minimum. 3. Location and size of existing and proposed open channels, storm drains, detention/retention areas, SCS soils map, and all other drainage structures. 4. Identification of all drainage basins in the development. 5. Location of all streets larger than residential classification. 6. Identification of all drainage basins tributary to the proposed development. 7. Basin maps may be scaled as small as 1″ = 600′ (1:7200). Orthophoto maps at a scale of one inch equals 200 feet are preferred. Basin maps shall have each basin name, area (acres), ten percent and one percent peak flows (CFS) into and out of the basin (shown at the location of concentration) and, clearly indicated flow paths. Maps of a scale 1″ = 2,000′ may be used for undeveloped, offsite basins greater than one square mile. 8. All maps shall be a minimum of 24″ × 36″ and shall be professionally incorporated within the report. Pre-printed maps, such as USGS maps, are acceptable if otherwise allowable. Maps of a smaller size may be accepted at the reviewer's discretion. c. Inlet and storm drain size calculations are not required with the master drainage study; therefore, the number of sub basins analyzed in the report shall be held to the smallest practical number. d. Recommended outline. The following is a sample outline for a typical master drainage report. Each of these headings should be addressed in the report body with supporting information and calculations in the appendices. Information provided at this stage of the review process is reviewed for only the phase submitted for and only for the requirements above. Post development items are considered conceptual during this review phase. 1. Introduction and purpose 2. Methodology 3. Scope of investigation 4. Meteorological and geological A. Climate B. Rainfall C. Soil investigation (i) Hydrologic soil classification (ii) Runoff curve number (iii) Soil description 5. Basins A. Basin parameters 6. Hydrology A. Pre-development (i) Direct runoff (ii) Runoff volume computation (iii) Peak flow computations B. Post-development (i) Direct runoff (ii) Runoff volume computation (iii) Peak flow computations C. Comparison and ponding of pre- and post-development 7. Hydraulics A. Natural and manmade channels B. Streets C. Culverts and storm drains 8. Conclusion section A. Discussion of final drainage items B. Detailed description of hydraulic and hydrologic interaction 9. Appendices A. All required maps and drawings B. All calculations C. Input and output from any modeling and routing software. (2) Final drainage study. The final drainage study shall be a detailed study and analysis of the drainage in the proposed development for both predevelopment and post-development conditions. Developments include but are not limited to subdivisions, commercial developments, or planned unit developments. It shall include detailed calculations for all runoff within the proposed development, and detailed calculations for all runoff exterior to the site, with detailed calculations supporting the design of all drainage structures within the development. Final drainage studies shall use the approved methods as in section 32-103(c)(2). Construction plans for all drainage structures, grading plans and street grades, where applicable, shall also be considered part of the final drainage study. Drawings and calculations comprising the final drainage study shall include but not be limited to the following information: a. Clearly labeled existing and proposed contours for proposed development. (Contour interval based on USGS datum, two-foot (0.61 m) contour interval minimum.) b. Location and elevations of city or USGS benchmarks. All elevations shall be based on USGS datum. c. Property lines. d. Streets, right-of-way limits, names and grades. e. Existing drainage facilities and structures, including existing irrigation ditches, roadside ditches, drainage ways, gutter flow directions, and culverts. All pertinent information such as size, slope, and location of existing drainage ways shall be included to facilitate review and approval of drainage plans. f. Overall drainage area boundaries and drainage sub area boundaries. g. Proposed type of curb and gutter (vertical, combination, rollover, or flat) and gutter flow directions including crosspans (intersections). h. Proposed storm drains, open drainage ways and right-of-way requirements, including proposed inlets, manholes, culverts, erosion control and energy dissipation devices, and any other required appurtenances necessary for drainage control. i. Proposed inflow and outfall points for runoff from the study area. j. Routing and combining all flows at various critical points for the initial ten percent chance (ten-year) and major (one percent chance, 100-year) storm runoff. Note: When a stormwater pollution prevention plan (SWPPP) or erosion control plan is required, this evaluation is required for a 50 percent chance, two-year storm during construction. k. Minimum finished floor elevation and ground site elevations at all critical building locations for protection from major storm runoff. l. Predevelopment and post-development basin maps, with a scale of one inch equals 100 feet, (1:100) of the proposed development, which shall show the following information: 1. Location and size of all drainage structures. 2. General flow patterns and flow paths within the development also to include offsite basins affecting the development. 3. Finished floor and ground site elevations of all buildings and adjacent sites and structures. 4. One percent chance flood level in all streets in which the curb is overtopped during the one percent chance storm. 5. All drainage basins within, and affecting, the development shown in a table listing basin names, basin area (acre), ten percent and one percent peak flows into and out of each basin shown at the flow path location. Note: The number of basins should be limited to the smallest practical number. m. All floodplains and floodways within the proposed development. A copy of the current FEMA floodplain map is required, showing project limits. n. All drawings shall be on 24-inch by 36-inch (0.610x0.914m) sheets. Maps of a smaller size may be accepted at the reviewer's discretion. o. SCS soils map showing project location. p. Final drainage study shall incorporate master drainage study. q. Recommended outline. The following is a sample outline for a typical final drainage report. Each of these headings should be addressed in the report body with supporting information and calculations in the appendices. Information provided at this stage of the review process is reviewed for only the phase submitted for and only for the requirements above. 1. Introduction and purpose 2. Methodology 3. Scope of investigation 4. Meteorological and geological A. Climate B. Rainfall C. Investigation (i) Hydrologic soil classification (ii) Runoff curve number (iii) Soil description 5. Basins A. Basin parameters 6. Hydrology A. Pre-development (i) Direct runoff (ii) Runoff volume computation (iii) Peak flow computations B. Post-development (i) Direct runoff (ii) Runoff volume computation (iii) Peak flow computations C. Comparison and ponding of pre- and post-development 7. Hydraulics A. Natural and manmade channels B. Streets C. Culverts and storm drains 8. Conclusion section A. Discussion of final drainage items B. Detailed description of hydraulic and hydrologic interaction. 9. Appendices A. All required maps and drawings B. All calculations C. Input and output from any modeling and routing software. (3) Plan details. The following details shall be indicated on the drainage plans: a. Title block (lower right-hand corner preferred). b. Scale. c. Date and revisions. d. Name of professional engineer and firm. e. Professional engineer's seal. f. Drawing number (sheet n/n). g. Legend. h. Approval blocks for various city departments. (4) Construction plans. Construction plans shall show the following information: a. Plan. 1. North arrow. 2. Property lines, adjacent property's, ownership thereof and subdivision information. 3. Street names and easements with width dimensions and location. 4. Existing utility lines, location and depth, or height, as follows: A. Water. B. Gas. C. Telephone. D. Storm drains. E. Irrigation canals. F. Sanitary sewers. G. Other utilities. b. Profile. 1. Vertical and horizontal grids with scales. 2. Ground surface grade (dashed) and proposed grade (solid). 3. Existing utility lines where crossed. 4. Benchmarks (USGS datum). c. Proposed construction. 1. Pipes and culverts. A. Plan showing stationing. B. Profile. C. Size, length between manholes, and pipe composition. D. Grades of pipe. E. Inlet and outlet details of all manholes and inlets, and connections to existing drainage systems. F. Manhole details including station numbers and invert and top elevations. G. Typical bedding details for pipe for all bedding situations encountered on project. 2. Open channels. A. Plan showing stationing. B. Profile indicating grade of invert of channel, top of lining if any and adjacent ground grade. C. Typical cross sections. D. Construction notes. E. Lining details. F. Riprap and bedding details, gradation requirements for same. G. Structure details of all inflow, outflow and drop structures. Including sub grade and foundation design details. (5) Technical specifications. Technical specifications shall be included on any drainage project that is permitted for construction within the city. Specifications shall meet the minimum guidelines for construction as outlined in the city standard specifications for roadway construction. Additional specifications for construction shall be included to the point that there exists a clear understanding of the nature and quality of work to be performed on the project. The city may request additional technical specifications for projects that will become city property or will be involved in the storm drainage maintenance program. (b) Construction approval. Record drawings of improvements shall be provided for all subdivision or public right-of-way construction projects. The design engineer and the city must review and approve any changes to the original design of a project. Record drawings will be made by the design engineer from information provided by job-site contractors or field surveys. Upon obtaining the record drawings, final inspection, Letter of Map Revision (when applicable), and approval by the public works director or his/her designee, the project can be issued a letter of acceptance or the improvement can be accepted by the city in the case of a subdivision or planned development. (c) Sediment transport. Moving water has the ability to transport sediment. The amount of sediment per unit of water that can be transported is related to flow depth, velocity, temperature, vertical and horizontal channel alignment, the amount of sediment available, the size and density of sediment available and many other minor but sometimes important parameters. A channel's stability can be defined in terms of its ability to function properly during flood events without serious aggradation or degradation and that its continued operations can be relied upon without extraordinary maintenance and repairs. While channel stability problems are largely associated with earth and flexible material linings, concrete lined supercritical channels are not immune. Any time a downstream channel reach has a lower sediment capacity than an upstream portion, there is a potential for sediment accumulation. Recommended design aids for sediment transport in the Southwest Region is a report written by Simons, Li and Associates for the City of Aurora, Colorado entitled Drainage and Flood Control, Design Guidelines and Criteria, Channels and Hydraulic Structures on Sandy Soil dated June 1981. Another resource is the Sediment and Erosion Design Guide prepared for AMAFCA by RCE of Fort Collins, Co March 1994. These reports are used by many Southwest cities and is recommended for use in the city for analysis of drainage. (d) Construction site discharge. The Environmental Protection Agency (EPA) has determined that construction can cause up to ten times the sediment and pollutants to leave a site during a rain event. As a part of the Clean Water Act, the EPA mandates that all construction which clears at least one acre of ground, (or is part of a larger development, like a subdivision) comply with the construction general permit). The EPA also mandates that the city keep pollutants including sand and debris out of streets and storm drains. All construction sites and subdivisions one acres (0.405 ha) and greater in size under development in the city shall provide a site erosion control plan when subject to the EPA construction general permit. The erosion control plan shall include temporary ponding, site stabilization, silt fences, berms etc. as necessary to control site erosion and eliminate sediment transport to downstream lands or right-of-way or offsite (i.e. adjacent streets). Ponding volumes for SWPPP preparation shall be based on a minimum of a two-year storm event and associated runoff. The disturbed area of the construction site shall be taken into account when determining the methods to control site erosion. Structures or measures to improve stormwater quality to city drainage systems in accordance with the city's stormwater management plan must be shown on both residential and commercial subdivisions plans. The National Pollutant Discharge Elimination Manual Stormwater Management Guidelines for Construction and Industrial Activities provides the appropriate methodology for use in the state and is recommended for use in developing the erosion control plan and stormwater pollution prevention plan (SWPPP), however any best management practices (BMP) may be submitted for review. The city reserves the right to review the SWPPP for any development. A SWPPP must be acceptable to the regulatory agency prior to any land disturbance activity or permit issuance. See City of Las Cruces Municipal Code Ordinance 2146, Section 34-133, "Stormwater discharge from construction activities" for specific design requirements. (e) Undeveloped system outlets. Site developments and subdivisions one acre (2.02 ha) and greater in size that discharge storm runoff to an undeveloped or "natural" drainage system shall be designed to minimize the impact of developed "clean" runoff on the downstream system. The development plans shall include an analysis of the proposed site discharge and the method(s) to limit the downstream erosion to the minimum practical extent. In general, flow rates must be limited to a non-erosive level, see table 32-105.5.C. It shall be the responsibility of the owner to maintain all proposed erosion and sediment control devices in proper functioning order. If and when a downstream system is developed to a point that downstream erosion is not a concern, the development may abate the measures to limit storm run-off to less than the historical discharge rate. (f) Undeveloped system inlets. In a location where an inlet will allow a natural flow to enter the development, permanent BMP's must be in place to remove silt and floatable material from entering the developed area while safely allowing historic flow. Such inlets must facilitate ease of maintenance. (g) Erosion control plan review. The erosion control plan for construction sites and for undeveloped system outlets may be prepared by the developer, if the project is less than five acres (0.00) - 4.99 ac) (2.01 ha) in size, is not a designated flood plain, and does not have a major arroyo crossing the site. All other sites shall be prepared by a registered professional engineer, licensed in the state. All erosion control plans will be reviewed by the city public works department. Failure to implement effective best management practices outlined in the erosion control plan or the SWPPP may result in a stop work notice on construction sites.
(Ord. No. 949, § 3.1D, 9-8-87; Ord. No. 1929, §§ I, II, 8-5-02; Ord. No. 2187, 4-4-05)
Ask a question about Las Cruces law
Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.