§ 32-103 — Runoff analysis methods
Municipal Code of the City of Las Cruces, New Mexico (Supp. No. 34: codified through Ordinance No. 3114, adopted June 1, 2026) · Las Cruces Development Code § 32-103
Corpus is an independent public-information project, not the official City of Las Cruces website. Stable reference: corpuslaw.us/code/6b6e8507-6cf0-4f3d-b594-7dde4396b436
Sec. 32-103. - Runoff analysis methods.
(a) Applicability. This section sets forth the minimum design, technical criteria and specifications for the analysis and design of drainage systems. All subdivision construction plans, planned unit developments, paving projects, or any other commercial or residential construction submitted for approval by the city shall include storm drainage analysis and appropriate system design before any phase of construction will be permitted. Such analysis and design shall meet the criteria outlined in this article and must be approved by the public works department before a permit is issued. (b) Development of less than three acres. (0.00 to 2.99 acres) (0.00 to 1.21 ha) Runoff analysis for developments of less than three acres can be based on general runoff coefficients for valley and/or mesa areas. The runoff coefficient is a value that is used to approximate the amount of runoff that a developer or home builder will need to retain on site to maintain existing drainage characteristics. Drainage plans based on the soil conservation service (SCS) method, in lieu of this simplified approach, will be acceptable. SCS submittals should include all supporting documentation, soils maps, CN tables, etc. Any site with a channelized flow crossing the site must use the SCS method. Developments within the 100-year flood plain must comply with Las Cruces Ordinance No. 1933. Specific requirements shall be as follows: (1) Identify area classification. a. Valley areas, land slope less than one percent. b. Mesa areas, land slope greater than or equal to one percent. (2) Runoff and flow coefficients. a. Valley areas runoff, 2.8 inches. (71.12 mm) b. Mesa areas runoff, 2.0 inches. (50.80 mm) c. Flow coefficient, 1.6 cfs/acre-in. (.004408 M 3 /(s*ha*mm)) A*Fc*Rc = Q = flow rate English | Impervious Area(acre)*Flow Coefficient (CFS/acre-in)*Runoff Coefficient (in) = Peak Flow Rate (CFS) Metric | Impervious Area(ha)*Flow Coefficient (M 3 /(s*ha*mm)*Runoff Coefficient (mm) = Peak Flow Rate (M 3 /sec) (3) Calculate impervious area of land to be developed. Impervious area includes the building, sidewalks, asphalt paving, etc. (Places where water cannot penetrate into the ground, including some desert landscaping.) Calculate area in square feet (square meters). (4) Find required storage volume by multiplying the impervious area (square feet) (or square meters) by the runoff coefficient (inches or millimeters) and a conversion factor one foot/12 inches (one meter/1,000 millimeters). A*CR*CF = SV = Storage Volume English | Area(FT 2 )*Runoff Coefficient (in)*Conversion factor (1ft/12in) = Required Storage Volume (FT 3 ) Metric | Area(m 2 )*Runoff Coefficient (mm)*Conversion Factor (1m/1,000mm) = Required Storage Volume (M 3 ) (5) Indicate on the construction plans how the required storage volume will be controlled on site. Include details on wall and berms that will control or direct runoff, asphalt and lot grade, and method of overflow of the storage area. (6) Acceptable types of drainage structures are as follows: a. Open ponding. Open retention ponds are recommended in areas that have good percolation of water into the soil. Open ponds offer the maximum amount of storage for a given land area. The minimum depth shall be 18 inches (0.46 m), and the pond shall be located a minimum of five feet from adjacent property lines and ten feet (3.05 m) from any structures. The design parameters are further defined in section 32-107. 1. French drain. French drains are acceptable in areas that have poor percolation rates, i.e., clay. A French drain shall be used only to provide increased percolation rates for runoff. French drains must have an open pond above rock level with a minimum clearance of 12 inches (0.30 m) between grate and top of rocks. A. Underground storage. Underground storage is recommended in areas with good percolation and limited space. Credit is given for the open volume only; no credit is given for rock voids. No credit will be given for "rock ponds." Some acceptable products include, but are not limited to, perforated CMP, perforated HDPE, Rainstore©, infiltrator systems, etc. Designs must include a method to maintain the structures effectiveness. (c) Development equal to or greater than three acres. For development equal to or greater than three acres (1.214 ha), the following shall apply: (1) Runoff analysis for developments equal to or greater than 3.0 acres (1.214 ha) shall be based on the soil conservation service (SCS) method which is outlined in a publication entitled "Peak Rates of Discharge for Small Watersheds, Chapter 2 (revised 2/85 for New Mexico), Engineering Field Manual for Conservation Practices." This manual is specifically for the application of the SCS procedure in New Mexico. Rainfall data for analysis can be obtained from the city public works department. The city requires the use of a modified S.C.S. Type II Storm with a minimum of 75 percent of rainfall occurring in a one-hour period. The following limitations apply to the SCS method: a. Minimum initial time, five minutes. (Not Tc) b. Time of concentration (Tc) is equal to the sum of initial time and gutter/pipe flow time. However, engineers must calculate the time of concentration. Time of concentration used shall be calculated value or six minutes, whichever is greater. All calculations must be included in the drainage report. c. Overland flow portions of time of concentration are to be calculated for a maximum reach length of 500 feet (152.4 m). d. Curve numbers (CNs) shall be from USDA SCS, TR 55, 1986 or newer tables. CNs for residential or commercial/industrial uses shall be calculated using actual hydrologic conditions. CNs must be rounded to the nearest whole number. (2) Specific requirements. The following criteria shall be utilized in the analysis of the drainage system: a. Runoff analysis shall be based upon the proposed land use, and shall take into consideration all contributing runoff from areas outside of the study area. The analysis of storm runoff from undeveloped and existing developed areas lying outside of the study area shall be based upon present land use and topographic features. b. The probable future flow pattern in undeveloped areas shall be based on existing natural topographic features (existing slopes, drainage ways, etc.). c. Average land slope in both developed and undeveloped areas may be used in computing runoff. However, drainage patterns and slopes that have already been established shall be used in areas where available. d. Flows and velocities which may occur at a design point when the upstream area has been fully developed shall be considered. Drainage ways, including the ten percent chance and one percent chance systems shall be designed such that the increased flows and velocities, due to development, meet the guidelines for the ten percent chance and one percent chance design storms. e. Streets can be used as drainage ways for the ten percent chance storm runoff. The primary use of streets shall be for the conveyance of traffic. f. On-site retention or detention is required for all sites. Detention ponds must detain the one percent chance rainfall allowing the predeveloped flow or less to flow off the development. An approved routing system must be used to route the hydrograph through the detention pond(s). Detention pond storage volumes shall be calculated for the ten percent chance and 100-year (one percent chance) storm by flood routing using a hydrographic method (HEC-1, HEC-HMS, SCS Hydro, TRSS, or generally recognized method) or by the FAA method. The changing of a natural drainage way location will not be approved unless such change is shown to be without unreasonable hazard and liability, substantiated by thorough analysis and investigation of all affected down stream facilities. This includes impacts to buildings, public and private infrastructure, habitats and, open space. The use of detention facilities may not be acceptable where outfall is into another storage facility. When the peak flow and total volume into the storage facilities is greater than the pre-development peak flow and total volume, a detailed hydrologic analysis of both facilities must be provided to the city for review. These facilities may be sensitive to increased volumes of runoff as opposed to increase rates of flow. Such facilities require approval of the public works director. g. The planning and design of drainage systems shall be such that problems are not transferred from one location to another. Outfall points shall be designed in such a manner that will not cause increased flooding and/or erosion downstream. Irrigation canals shall not be used as outfall points unless such is shown to be without hazard substantiated by thorough hydrologic and hydraulic analysis. Approval for use of irrigation canals for drainage shall be obtained in writing from the controlling agency and shall be submitted to the city as part of the drainage study. h. Floodplain information shall be required along with a conditional letter of map revision (CLOMR) and a letter of map revision (LOMR) for one percent chance for storm flows of greater than 250 cfs (2.83 M3/S), developments of five acres and larger, developments with 50 or more lots, and/or developments with any changes to the existing flow path in FEMA flood hazard zones AE, A, AH, AO, and D upon the submittal of any on preliminary and/or final drainage drawings for review. Information shall include peak discharges for the ten percent, two percent, one percent and 0.2 percent chance storms for the floodplain inundation area and anticipated depth of floodwaters one foot and deeper. Standard step backwater models shall be used for flood depth determination. The Hydrologic Engineering Centers HEC-2 analysis method may be required. Improvements and subdivisions will not accepted by the city until the FEMA flood study has been approved by FEMA. A CLOMR will be submitted for review by the city and submitted to FEMA prior to plan and/or final plat approval. A LOMR will be submitted for review by the city and submitted to FEMA before acceptance by the city and before the issuance of any certificate of occupancy. Costs incurred for the preparation of materials and fees paid to FEMA will be borne by the developer. i. Dedicated drainage easements or rights-of-way are required for drainage ways, and these shall be designated on all drainage drawings and subdivision plats. Drainage rights-of-way dedicated to the city shall have a minimum clear bottom width of 15 feet (4.57 m) of clear unobstructed space with a design that facilitates cleaning using available equipment. j. Approval will not be made for any construction which will encroach on any drainage easement or impair surface or subsurface drainage.
(Ord. No. 949, § 3.1C, 9-8-87; Ord. No. 1224, § 1, 3-18-91; Ord. No. 1929, §§ I, II, 8-5-02; Ord. No. 2187, 4-4-05)
Ask a question about Las Cruces law
Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.