§ 6.2.2 — Required Authorization for Gas Well Development in City Limits
Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton Development Code subch. 6, § 6.2.2
Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/6c204a80-9316-4192-bf1e-f39625141c0f
6.2.2 - Required Authorization for Gas Well Development in City Limits.
A. Zoning District Classifications for Gas Well Development. 1. Gas well development is classified as an industrial land use in all zoning districts. 2. Gas well development is permitted as set forth in Table 5.2-A: Table of Allowed Uses of the DDC, subject to the use-specific standards in Section 5.3: Use-Specific Standards, of the DDC and the standards in Section 6.3: Gas Well Drilling and Production. Gas well development also is permitted if authorized by a Master Planned Community ("MPC") or Planned Development ("PD") District. 3. In order to foster compatible land use within zoning districts, Gas Well Development within the corporate limits of the City will be subject to reasonable setbacks from Protected Uses and Residential Subdivisions, which vary according to the types of uses authorized in each district. Because many gas wells are already in close proximity to existing Protected Uses or Residential Subdivisions, setbacks standards within districts will vary according to whether the proposed Gas Well Development takes place on an Existing Site or a new site. 4. A Drilling and Production Site Setback is the distance that the site must be separated by an Operator from an existing Protected Use or Residential Subdivision. A Reverse Setback is the distance that a Protected Use or Residential Subdivision must be separated by a surface owner from an approved Drilling and Production Site. A Minimum Setback is the minimum distance of separation between a Drilling and Production Site and a Protected Use or Residential Subdivision after a waiver or variance is granted to reduce the setback requirement. A Minimum Reverse Setback is the minimum distance a Protected Use or residential lot must be separated by a surface owner from an approved Drilling and Production Site or from a gas well within such site after administrative relief or a variance is granted to reduce the reverse setback requirement. B. Setbacks by Zoning District Classification. New Gas Well Drilling and Production Sites. Setbacks from Protected Uses and Residential Subdivisions for new Drilling and Production Sites, Reverse Setbacks and Minimum Setbacks shall be as follows. In order to reduce Drilling and Production Site Setbacks, the procedures outlined in Subsection 6.2.3, General Permit Requirements for New and Existing Gas Well Sites, shall be followed. 1. For new Drilling and Production Sites authorized in the RR, R1, R2, R3, R4, R6, R7, MN, MD, MR, SC, HC, GO, and PF districts, except in MPC or PD Districts: a. Drilling and Production Site Setbacks: 1,000 feet. b. Minimum Setbacks: 500 feet. c. Reverse Setbacks: 500 feet. d. Minimum Reverse Setback: 250 feet. 2. For new Drilling and Production Sites authorized in the LI and HI zoning districts: a. Drilling and Production Site Setbacks: 250 feet. b. Minimum Setbacks: 250 feet. c. Reverse Setbacks: 500 feet. d. Minimum Reverse Setback: 250 feet. Where a proposed Drilling and Production Site in the LI or HI zoning district is contiguous to the boundary of a district subject to the setbacks in Subsection B(1) above, the Drilling and Production Site Setback shall be 500 feet from Protected Uses or Residential Subdivisions within the adjacent district, the Reverse Setback shall be 500 feet, and the Minimum Setback and Minimum Reverse Setback shall be 250 feet. 3. For new Drilling and Production Sites in PD Districts and MPC Districts, Drilling and Production Site Setbacks and Reverse Setbacks shall be as provided in the PD District or MPC District regulations or as provided in subsequent site-specific applications approved prior to August 4, 2015. The Drilling and Production Site Setbacks and Reverse Setbacks in Subsection B(1) above shall apply to any setback not specified in the MPC or PD District regulations or in subsequent site-specific applications approved prior to August 4, 2015. C. Setbacks for Existing Gas Well Sites. 1. For Existing Drilling and Production Sites in the LI or HI zoning district: a. Drilling and Production Site Setbacks: 250 feet. b. Minimum Setbacks: 250 feet. c. Reverse Setbacks: 500 feet. d. Minimum Reverse Setback: 250 feet. 2. For Existing Drilling and Production Sites in all other districts, except in MPC or PD Districts: a. Drilling and Production Site Setbacks: 500 feet. b. Minimum Setbacks: 250 feet. c. Reverse Setbacks: 500 feet. d. Minimum Reverse Setback: 250 feet. 3. For Existing Drilling and Production Sites in MPC or PD Districts, setbacks shall be as provided in the MPC or PD District regulations, or as provided in subsequent site-specific applications approved prior to August 4, 2015. The Drilling and Production Site Setbacks and Reverse Setbacks in Subsection C(2) above shall apply to any setback not specified in the MPC or PD District regulations, or in subsequent site-specific applications approved prior to August 4, 2015. In order to reduce Drilling and Production Site Setbacks, the procedures outlined in Subsection 6.2.3, General Permit Requirements for New and Existing Gas Well Sites shall be followed. D. Measurement of Setbacks. 1. A Drilling and Production Site Setback shall be measured from the actual or proposed boundaries of the Drilling and Production Site in a straight line, without regard to intervening structures or objects, to the closest exterior point of any structure occupied or utilized by a Protected Use or any residential lot boundary line on an approved Residential Subdivision plat when not currently occupied by a Protected Use. 2. The Reverse Setback shall be measured from the closest exterior point of the proposed structure to be occupied or utilized by a Protected Use or residential lot, in a straight line, without regard to intervening structures or objects, to the closest boundary designated for the approved Gas Well Development Site Plan, or, if no Gas Well Development Site Plan has been approved for the site, from the closest boundary of the Existing Drilling and Production Site. For a proposed Residential Subdivision plat, the Reverse Setback shall be measured from any undeveloped residential lot boundary to the closest boundary designated for the approved Gas Well Development Site Plan, or, if no Gas Well Development Site Plan has been approved for the site, from the closest boundary of the Existing Drilling and Production Site. 3. For the purposes of setback measurements at public parks, measurements shall be taken from any improvement such as a building, playground equipment, pool, splash pad, regulation area of a permanent ball field or court, or pavilion. This definition does not include flatwork such as parking lots, sidewalks, or trails. 4. The Reverse Setback for all other proposed Habitable Structures shall be the distance prescribed by the Fire Code. No permanent Habitable Structure, however, shall be located within the boundaries of a Drilling and Production Site. E. Compliance with Fire Code Setbacks. In the event of any conflict between the setback provisions established by this Section 6.2: Gas Well Development, and any setback provisions established by the Fire Code, as now adopted or hereafter amended by the City of Denton, whichever provision provides for the larger setback shall control. F. Protected Use Setbacks. After the effective date of this amendatory ordinance, a property owner who constructs a Protected Use must maintain a distance of 300 feet between the closest exterior point of the proposed structure to be occupied by the Protected Use and any equipment on a Drilling and Production Site that produces or stores flammable or combustible liquid or gas, to assure efficient emergency response operations. After such date, an Operator who locates any equipment that produces or stores flammable or combustible liquid or gas on a Drilling and Production Site must maintain a distance of 300 feet between such equipment and the closest exterior point of a structure occupied by a Protected Use.
(Ord. No. DCA19-009c, § 2(Exh. B), 11-19-19; Ord. No. DCA19-0009e, § 2(Exh. B), 1-28-2020)
Ask a question about Denton law
Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
