6.2.3 - General Permit Requirements for New and Existing Gas Well Sites.

A. Permit Procedure Tracks. 1. Gas Well Development Site Plan Required for Authorization of Multiple Wells. a. Other than for pending permit applications excepted from these regulations under Subsection 6.2.3E: Legal Non-Conformity; Exceptions, no Gas Well Permit shall be issued until a Drilling and Production Site has been established through approval of a Gas Well Development Site Plan for the well site. For an Existing Drilling and Production Site for which no Gas Well Development Site Plan has been approved, an Operator must obtain approval for a Gas Well Development Site Plan under these regulations before any additional wells may be permitted on the site, except as provided in Subsection 6.2.4A.1.b. b. In order to satisfy the setback requirements of Subsection 6.2.2, Required Authorization for Gas Well Development in City Limits, an Operator must use the procedures for approval of a Gas Well Development Site Plan set forth in subsections A(2), A(3), or A(4) of this Section. c. Once a Gas Well Development Site Plan has been approved, Drilling and Production Site Setback requirements will not apply to individual Gas Well Permit applications authorized by the approved Gas Well Development Site Plan. No variance or waiver from the setback for the Drilling and Production Site shall be required for subsequent wells. d. A new Gas Well Permit must be obtained for each well authorized by an approved Gas Well Development Site Plan. e. Once a Gas Well Development Site Plan has been approved for an Existing Drilling and Production Site shown on a gas well development plat, such plat shall have no further force and effect with respect to that Drilling and Production Site. 2. Procedures for Drilling and Production Sites that Meet Setback Requirements. For a New or Existing Drilling and Production Site that meets the setback requirements in Subsection 6.2.2, Required Authorization for Gas Well Development in City Limits, an Operator may apply for a Gas Well Development Site Plan pursuant to Subsection 6.2.4: Gas Well Development Site Plans. 3. Procedures for Drilling and Production Sites That Do Not Meet Setback Requirements. For a New or Existing Drilling and Production Site that does not meet the setback requirements in Subsection 6.2.2, Required Authorization for Gas Well Development in City Limits, the Operator may seek a waiver from 100 percent of the owners of Protected Uses and the owners of lots in Residential Subdivisions within the Drilling and Production Site Setback pursuant to Subsection 6.2.6A. In the alternative, the Operator may apply for a variance from the setback requirement from the Board of Adjustment pursuant to Subsection 6.2.6B. In the alternative, for qualified Drilling and Production Sites, the Operator may obtain a reduction in the site setback using incentive procedures in Subsection 6.2.6C. The Minimum Setback requirements under Subsection 6.2.2, Required Authorization for Gas Well Development in City Limits, shall apply. The notice provisions of Subsection 6.3.7A apply to proceedings under this subsection. Once a setback has been reduced through waivers or variance procedures, the Operator may apply for a Gas Well Development Site Plan pursuant to Subsection 6.2.4. 4. Special Procedures for Setbacks in PD and MPC Districts. a. The Operator and the surface owner of land in a PD or MPC District may present a unified plan that assures the compatibility of surface development and Gas Well Development of the property, taking into consideration setbacks from Protected Uses and Residential Subdivisions, traffic circulation and access, fire safety and emergency response, noise and light mitigation and other factors necessary to achieve compatibility of land uses. The plan may establish different Drilling and Production Site and Reverse Setbacks that vary from those prescribed in Subsection 6.2.2, Required Authorization for Gas Well Development in City Limits. The plan if approved by the City Council shall be incorporated into the zoning district regulations. b. Where the Drilling and Production Site and Reverse Setbacks for Existing Sites within a PD or MPC district are less than the minimums set forth in Subsection 6.2.2, Required Authorization for Gas Well Development in City Limits, no amendments to the zoning district regulations for surface development or gas well development shall be approved by the City Council unless the setbacks are conformed to the requirements of this Section or a compatibility plan is presented and approved pursuant to paragraph (4)(a) above. 5. Procedures for Protected Uses or Residential Lots that Do Not Meet Reverse Setback Requirements. For a new Protected Use or residential lot that does not meet the setback requirements in Subsection 6.2.2, Required Authorization for Gas Well Development in City Limits, the property owner may apply for administrative relief using the alternative design standards in Subsection 6.2.6C.2a, if applicable, or for a variance from the Reverse Setback requirement from the Board of Adjustment pursuant to Subsection 6.2.6B. B. Sequence of Gas Well Permits. The Operator must comply with all rules and regulations of the Fire Code and all other law, rules and regulations applicable to gas well operations, including, but not limited to, the following provisions. No Drilling or Production Activities may commence within the City limits until the following authorizations have been obtained, in the following sequence: 1. Approval of a Gas Well Development Site Plan pursuant to Subsection 6.2.4, for new sites. Upon approval of a Gas Well Development Site Plan, the Operator may commence construction of a Drilling and Production Site. No disturbance of the land is allowed until a Gas Well Development Site Plan is obtained. 2. The Operator shall obtain a Gas Well Permit for each new gas well on such site pursuant to the application requirements and standards of Subsection 6.2.5. 3. Approval of a Temporary Above-Ground Storage Tank Permit from the Denton Fire Department. 4. Approval of Gas Well Operational Permit from the Denton Fire Department. 5. When all approvals contained in paragraphs (1) through (4) above have been obtained, applicant may commence Initial Drilling Activities. 6. Approval of a Flammable and Combustible Liquids Construction Permit from the Denton Fire Department. 7. Approval of a Flammable and Combustible Liquids Operational Permit from the Denton Fire Department. 8. When all approvals contained in paragraphs (1) through (7) above have been obtained, applicant may commence Completion Operations and Production Activities. 9. Approval of an Open Flame Operational Permit from the Denton Fire Department for flaring activities during any stage of operation. 10. New Drilling or Production Activities on an existing Drilling and Production Site that is subject to an approved Watershed Permit, or on sites which required a Watershed Permit under prior regulations, but for which site no Watershed Permit was issued, are subject to the requirements of Subsection 6.3.9D. 11. The applications for any authorization for gas well drilling and production listed in this Subsection B must be submitted and approved in the numerical order listed. No subsequent application shall be determined to be complete and hereby is deemed to be incomplete until all required prior applications have been approved, and no completeness determination shall be made until such prior applications have been approved. C. Expiration of Permits, Plans. Applications for gas well drilling and production shall expire under the following circumstances: 1. A Specific Use Permit which was approved under prior gas well regulations expires according to its terms, or pursuant to DDC, paragraph 2.5.2C.6: Step 6: Post-Decision Actions and Limitations. 2. A Watershed Protection Permit, if applicable, expires with the expiration of a Gas Well Development Site Plan. 3. A Gas Well Development Site Plan for a new Drilling and Production Site expires unless a complete application for a Gas Well Permit has been filed within one year of the date of approval of the Site Plan, or no drilling and production activities have occurred on the Drilling and Production Site for a period of three years. A Gas Well Development Site Plan for an Existing Site does not expire, unless no drilling and production activities have occurred on the site for a period of two years after all wells on the site have been plugged and abandoned. 4. A Gas Well Permit expires if Initial Drilling Activities have not commenced within one year of the date of approval of the Gas Well Permit. 5. Following expiration of an approved application for gas well drilling and production, a new application must be submitted. D. Requirements are in Addition to Other Permits. The authorizations required by this Subchapter are in addition to, and not in lieu of, any permits that may be required by any other provision of the Denton City Code, DDC or any other government agency. E. Legal Non-Conformity; Exceptions. 1. Non-Conformities. The provisions of Section 1.5, Nonconformities, are applicable to gas well drilling and production activities, except as provided hereinafter. a. For purposes of Section 1.5, Nonconformities, the drilling of a new gas well and associated Production Activities do not constitute an existing lawful use. b. The amendment of Table 5.2-A: Table of Allowed Uses and use-specific standards in Section 5.3: Use-Specific Standards, to provide for gas well Drilling and Production Activities shall not render non-conforming any Workover Operations, Drilling Activities or Production Activities for an existing well conducted on an Existing Drilling and Production Site, if such activities were authorized under a gas well permit that was approved by the Gas Well Administrator pursuant to gas well regulations in effect prior to the effective date of this amendatory ordinance. c. The adoption of this amendatory ordinance or the application of such regulations to an Existing Drilling and Production Site shall not render non-conforming any Workover Operations, Drilling Activities or Production Activities for an existing well on such site, if such activities were authorized under a gas well permit that was approved by the Gas Well Administrator prior to the effective date of this amendatory ordinance. 2. General Exceptions. The standards or procedures implemented by this amendatory ordinance shall not affect the processing and approval or disapproval of an application for a gas well permit that was pending for decision on the effective date of this amendatory ordinance, or any subsequent permit applications for the same gas well, or for a gas well for which a gas well permit was approved prior to the effective date of this amendatory ordinance, except to the extent necessary to give effect to Subsection 6.2.3E. For purposes of Subsection 6.2.3E.2, an amended Gas Well Development Site Plan application is not a subsequent permit application. a. Authorizations or applications excepted under Subsection 6.2.3E.2. are subject to all gas well drilling and production standards in effect immediately prior to the effective date of this amendatory ordinance. b. To the extent that any exception provided under Subsection 6.2.3E.2 is dependent on an application pending on the effective date of an amendatory ordinance, such application must have been approved subsequently in order for the exception to apply. c. City shall, prior to annexation, provide notice of the City's intent to annex to each Operator affected by the annexation. Every Operator of a Drilling and Production Site that has been annexed into the City shall register the Drilling and Production Site not later than three days after the effective date of the annexation by contacting the Gas Well Administrator to ensure that gas well development plats and gas well locations are on file with the City. If they are not, the Operator shall provide the City with a copy of a gas well development plat and gas well location information. F. General Application Standard. In additional to any other remedies available at law or in equity, the City may initiate proceedings to revoke any site plan, permit, variance or special exception approved pursuant to this Section 6.2: Gas Well Development, upon discovery that the applicant supplied false, fraudulent or misleading information that was material to approval of the application under the standards applicable to the permit, variance or special exception. All site plan or permit applications or requests for relief to the Board of Adjustment or requests for waivers shall be verified.

(Ord. No. DCA19-0009c, § 2(Exh. B), 11-19-2019; Ord. No. DCA19-0009e, § 2(Exh. B), 1-28-2020)