For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6.3.1 — Definitions

Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton Development Code subch. 6, § 6.3.1

Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/b67573e4-344d-400f-acc4-c2d70413d957

6.3.1 - Definitions.

For the purpose of this Subchapter 6: Gas Wells, certain words and terms shall be defined and interpreted as follows. Interpretations of meaning shall be made by the Director of Planning and Development based on the provisions of Subsection 2.8.6, Interpretations. Appeals of staff interpretations of this Subchapter shall be heard as a Board of Adjustment proceeding in accordance with Subsection 2.8.1: Variance. As-Built Gas Well Development Site Plan: A Gas Well Development Site Plan depicting the boundaries of the subject Drilling and Production Site as constructed. Completion Operations: The term used to describe the events and equipment necessary to bring a wellbore into production once drilling operations have been concluded, including, but not limited to, well stimulation activities, the assembly of downhole tubular, or installing equipment in the well to allow a safe and controlled flow of petroleum or hydro carbons from the well. This definition describes all events performed and equipment used for completion of a well, whether performed the first time on a well or as subsequent treatments to an existing well. Compressor: A device that raises the pressure of natural gas. Contaminant: Any substance capable of contaminating a non-related homogeneous material, fluid, gas or environment. Cure Period: The amount of time granted to remedy a violation of this Chapter. Daytime: The hours between 7:00 a.m. and 7:00 p.m. CST on any given day. Drilling: Term used to typically describe the means by which the earth is bored to create a pathway to formations containing hydrocarbons to allow for their production to the surface. It can employ various types of mobilized drilling equipment to create a wellbore while incorporating drilling fluids to cool the bit, to condition the hole, to remove drilled cuttings and to maintain an overbalanced pressure gradient against the formation that may contain inherently pressurized well fluids. Drilling Activities: Those activities commonly performed at a Drilling and Production Site necessary or incidental to getting hydrocarbons to market; including but not limited to a well redrill or any hydraulic refracturing, initial drilling and completion operations, but not including Production Activities. Drilling and Production Site: The area dedicated to all authorized above ground gas well drilling and production activities related to an oil and gas operation on an improved area and containing all wells, structures, dehydrators, parking areas, security cameras, lighting, tanks, tank battery (or any other tank grouping area), drilling rigs, separators, lift compressors, perimeter walls, utilities, and all other features or objects used during and after gas well drilling or production activities, as depicted on a Gas Well Development Plat or Gas Well Development Site Plan, but excluding pits, gathering and transmission lines and compressor stations. Drilling and Production Site includes the terms gas well park, gas well pad site, pad site, and drilling and production area. Drilling and Production Site Setback: The distance that the site must be separated by an Operator from an existing Protected Use or from a Residential Subdivision. Existing Drilling and Production Site or Existing Site: A Drilling and Production Site that was specifically depicted and approved on a Gas Well Development Site Plan, or a gas well development plat, prior to August 18, 2015, and on which one or more gas wells exist. Where the boundaries of such site have not been defined by metes and bounds or lot/block description on an approved gas well development plat, this term describes the improved surface area incorporating all facilities and appurtenances currently contained on the developed Drilling and Production Site. An Existing Site also includes a Drilling and Production Site designated in a MPC or PD District, and approved via a site-specific authorization, whether or not one or more wells exist on the site, provided that the site-specific authorization includes a metes and bounds description or a metes and bounds description is provided within three months of this amendatory ordinance. Existing Gas Well Development Site Plan: A Gas Well Development Site Plan that was approved by the City after August 4, 2010 that established setback boundaries and identified a specific number of wells to be constructed on the subject Drilling and Production Site. Exploration: Geologic or geophysical activities, including, but not limited to surveying and seismic exploration, related to the search for oil, gas, or other sub-surface hydrocarbons. Floodplain: See Subchapter 9: Definitions, for definition. Flood Fringe: See Subchapter 9: Definitions, for definition. Floodway: See Subchapter 9: Definitions, for definition. Flowback: The process of allowing fluids to flow from a well following a treatment, either in preparation for a subsequent phase of treatment or in preparation for cleanup and returning the well to production. The flowback period occurs as a stage within Completion Operations. Freshwater Well: A private water well used by a Protected Use. Gas: A naturally-occurring gaseous substance, including substances primarily composed of methane and other light, gaseous hydrocarbons. Gas Processing Plant: A facility, separate and distinct from a Drilling and Production Site, engaged in the extraction of natural gas liquids from field natural gas, or the fractionation of mixed natural gas liquids to natural gas products, or a combination of both. Gas Well: A hole or bore drilled to any horizon, formation, or strata for the purpose of producing or storing natural gas, or other liquid hydrocarbons. Gas Well Administrator: The administrative official designated by the City of Denton that is responsible for evaluating the impacts of exploration, development, and production of oil and/or gas wells. Responsibilities include environmentally sensitive areas review, erosion control inspection, monitoring, and evaluating compliance with federal, state, and local regulations. Gas Well Development: Any drilling activity or production activity performed on an approved Drilling and Production Site. Gas Well Development Site Plan: The initial approval authorizing wells to be drilled at one Drilling and Production Site that sets the boundaries used for setback measurements and contains all the information required by this Subchapter 6: Gas Wells. Gas Well Drilling and Production Activities: (A/K/A drilling and production activity(ies), drilling and production.) As used in this Chapter, gas well drilling and production activities encompasses all three of the following: Initial Drilling Activities, Completion Operations and Production Activities. Gas Well Permit: A written license that is granted by the City of Denton pursuant to Subsection 6.2.5: Gas Well Permits. A Gas Well Permit is required for each separate well. The term "gas well permit" in lower case letters refers to a permit approved by the City of Denton under gas well regulations in effect prior to the effective date of this amendatory ordinance, as the context may indicate, which authorized drilling and production activities on a gas well existing on such effective date. Habitable Structure: Structures suitable for human habitation or occupation for which a Certificate of Occupancy or Final Inspection Certificate is required, including but not limited to, public buildings and enclosed buildings used for commercial or industrial purposes. A habitable structure shall not include accessory buildings, barns, garages and sheds. Hazardous Materials Management Plan: The hazardous materials management plan and hazardous materials inventory statements required by the Fire Code. Hydraulic Fracturing: A well stimulant treatment that involves the process of directing pressurized fluids containing any combination of water, propellant, and any added chemicals to penetrate tight formations, such as shale or coal formations, that subsequently require high rate, extended flowback to expel fracture fluids and solids during completions. Hydraulic Fracturing occurs as a stage within Completion Operations. Initial Drilling Activities: The portion of the Drilling Activities that includes the means by which a portion of the earth is originally bored in order to create a pathway to formations containing hydrocarbons to allow for their production to the surface. Lightning Protection System: An integrated system designed to ground metal equipment on a rig, well pad or at a tank battery location for protection against electrical shock, fire or explosion due to lightning. Liner: In pit construction, a liner is an impervious material, either synthetic or natural, that is used to line the interior of a pit to prevent pit fluids from leaking or leaching into the environment. Minimum Reverse Setback: The minimum distance a Protected Use or residential lot must be separated by a surface owner from an approved Drilling and Production Site or from a gas well within such site after administrative relief or a variance is granted to reduce the reverse setback requirement. Minimum Setback: The minimum distance a Drilling and Production Site must be separated by an Operator from a Protected Use or from a Residential Subdivision after a waiver or variance is granted to reduce the setback requirement. New Drilling and Production Site or New Site: A proposed Drilling and Production Site that is other than an Existing Site. Operator: The person(s) in charge and in control of drilling, maintaining, operating, pumping, or controlling any well or pipeline including without limitation, a unit Operator. Plugging and Abandonment: Includes the plugging of the well, abandoned, orphaned or otherwise, in accordance with RRC Statewide Rule 3.14 or its successor regulation and restoration of the Drilling and Production Site as required by the RRC. Production Activities (A/K/A Production): The phase that occurs after Exploration, Initial Drilling Activities and Completion Operations and during which time hydrocarbons are stored or drained from an underground reservoir involving operations performed on a Drilling and Production Site, excluding those operations and facilities as defined and regulated by the Pipeline Safety Act of 1994, 49 U.S.C. §§ 60101—60137. Protected Use: Any dwelling, church, public park, public library, hospital, pre-kindergarten, kindergarten or elementary, middle or high school, public pool, public transit center, senior center, public recreation center, hotel or motel. Railroad Commission (RRC): The Railroad Commission of Texas. Redrill: Any work to an existing well bore or an existing surface hole location after Initial Drilling Activities that requires a new permit from the Texas Railroad Commission. This definition includes, but is not limited to, drilling into a new horizon or drilling multiple directionals from the same surface hole location or using the same vertical wellbore. Residential Subdivision: A subdivision designated for residential use for two or more dwellings. Reverse Setback: The distance that a Protected Use or residential lot must be separated by a surface owner from an approved Drilling and Production Site or from a gas well within such site. Site Access Road: The route depicted and approved on the Gas Well Development Site Plan or Gas Well Development Plat that identifies the ingress and egress point used to access the Drilling and Production Site from an existing City, County, or State maintained roadway. Site Preparation: To ready a Drilling and Protection Site for Initial Drilling Activities by installing erosion and sediment control practices, performing clearing and grading activities of the Drilling and Production Site or Site Access Road. Site-specific Authorization: The prior approval by ordinance of the City Council, of one or more specifically located and defined gas well site locations, subject to further site design, development, regulatory and permitting requirements, as set forth in this DDC or as specified within the site approval ordinance (or both), as applicable. Spud: The start of the well drilling process by removing rock, dirt, or other sedimentary material with the drill bit. Tank: Any storage vessel that contains an accumulation of crude oil, condensate, intermediate hydrocarbon liquids, or produced water; is constructed primarily of non-earthen materials (such as wood, concrete, metal, fiberglass, steel or plastic) which provide structural support; is not skid-mounted or permanently attached to something that is mobile; and is intended to be located at the Drilling and Production Site for more than 90 consecutive days. Well Stimulation: A treatment performed to restore or enhance the productivity of a well by opening new channels in the rock for the oil and gas to flow through; including, but not limited to fracturing, hydraulic or otherwise, injection of acid, or the use of charges to break up the rock. Workover Operation: Work performed on a well after its initial completion to secure production where there has been none, to restore production that has ceased, or to enhance or increase production within the zone originally completed or to repair the well. Workover operations do not include redrills or completion activities.

(Ord. No. DCA19-0009e, § 2(Exh. B), 1-28-2020)

Ask a question about Denton law

Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.