6.2.6 - Relief Measures.
A. Waiver Procedures for Drilling and Production Site Setback Reductions. 1. Property Owner Waivers for Drilling and Production Sites. An Operator may obtain a reduction in the Drilling and Production Site Setback requirements of Subsection 6.2.2 by procuring written, notarized waivers from 100 percent of the owners of Protected Uses and the owners of lots in Residential subdivisions that are within the required setback. a. Property owner waivers must be in a format approved by the City and shall include an aerial exhibit attached clearly depicting the boundaries of the proposed Drilling and Production Site where well development could occur and the closest dimension to each Protected Use and each lot in the Residential Subdivision for which the waiver is being requested. Signatures are required on both the form and exhibit. b. Written notarized waivers granted by all the property owners within the prescribed setback distance from a Drilling and Production Site must be filed, at the expense of the Operator, in the Denton County records. All waivers must identify the property address, block and lot number, subdivision name and plat volume and page number. Copies of filed property owner waivers must be submitted with the filing of a complete application for a Gas Well Development Site Plan. c. If the Operator fails to obtain written waivers from all property owners within the prescribed Drilling and Production Site Setback, the Operator may submit a request for a variance to the Board of Adjustment pursuant to Subsection 6.2.6B, or a request for an administrative variance, pursuant to Subsection 6.2.6C. 2. Effect of Surface Development on Drilling and Production Site Setback Waivers. After the effective date of this amendatory ordinance, when a property owner constructs a Protected Use or develops a Residential Subdivision within the Drilling and Production Site Setback for an Existing Site prescribed by Subsection 6.2.2C, such property owner shall be deemed to have granted the Operator a waiver in satisfaction of paragraph (1) requirements above for that property containing the Protected Use or constituting the Residential Subdivision. This waiver shall apply to all successor property owners. This does not relieve an Operator from obtaining waiver(s) from all other property owners located within the Drilling and Production Site Setback for the Existing Site. 3. The notice provisions of Subsection 6.3.7B apply to procedures under this subsection (A). B. Board of Adjustment Proceedings. 1. The Board of Adjustment shall hear and decide appeals of orders, decisions, or determinations made by the Gas Well Administrator relative to the application and interpretation of this Section 6.2: Gas Well Development, except for vested rights appeals and matters described in paragraph 6.3.8F: Permit Suspension or Revocation, furthermore, the Board of Adjustment shall hear and decide requests for variances to the provisions of this Section 6.2: Gas Well Development, under the relevant criteria set forth below. The Board may also grant special exceptions extending the expiration date of a Gas Well Development Site Plan or a Gas Well Permit for a period not to exceed one year. Any Operator, surface owner, or affected property owner who desires to appeal the decision of the Gas Well Administrator or Director, request a variance, or request a special exception may file the appeal or request to the Board of Adjustment pursuant to Subsection 2.8.1: Variance of the DDC. Appeal fees shall be required for every appeal, variance, or special exception request. For purposes of this Section, the Gas Well Administrator has designated authority from the Director of Planning to make final orders, decisions, or determinations. a. Standard of review for appeals. The members of the Board of Adjustment shall have and exercise the authority to hear and determine appeals where it is alleged there is error or abuse of discretion regarding the approval or denial of a Gas Well Development Site Plan or Gas Well Permit. The Board of Adjustment may reverse or affirm, in whole or in part, or modify the Gas Well Administrator's order, requirement, decision or determination from which an appeal is taken. b. General criteria for review of variances. In deciding requests for variances, the Board of Adjustment shall consider, where applicable, the following relevant criteria: i. Whether there are special circumstances existing on the property on which the application is made related to size, shape, area, topography, surrounding conditions and location that do not apply generally to other property in the vicinity; ii. Whether a variance is necessary to permit the applicant the same rights in the use of his property that are presently enjoyed by other similarly situated properties, but which rights are denied to the property on which the application is made; iii. Whether the granting of the variance on the specific property will adversely affect any other feature of the comprehensive master plan of the City; iv. Whether the variance, if granted, will be of no material detriment to the public welfare or injury to the use, enjoyment, or value of property in the vicinity; v. Whether the operations proposed are reasonable under the circumstances and conditions prevailing in the vicinity considering the particular location and the character of the improvements located there; and vi. Whether the operations proposed are consistent with the health, safety and welfare of the public when and if conducted in accordance with the Gas Well Development Site Plan or Gas Well Permit conditions to be imposed. 2. Standard of Review for Setback Variances. a. In deciding requests for variances from Drilling and Production Site Setbacks, the Board of Adjustment shall consider, where applicable and in addition to the general criteria stated in paragraph (1.b) above, the following relevant criteria: i. Whether there is reasonable access for City fire personnel and firefighting equipment, including the ability to safely evacuate potentially affected residents. ii. The extent to which the Operator and the surface owner(s) are in agreement on a plan for development of the property, have provided for adequate access and traffic circulation, and taken measures to promote compatibility of gas well development and other surface development of the property. iii. For a request by an Operator to reduce Drilling and Production Site Setbacks, whether the impact upon adjacent property and the general public from gas well development under the requested setback will be substantially increased, considering: a. The reasonable use of the mineral estate by the mineral estate owner(s) to explore, develop, and produce the minerals; b. The availability of alternative drilling sites; and c. The number of owners of Protected Uses or lots in a Residential Subdivision who are willing to waive the Drilling and Production Site Setback as requested or in modified form. b. In deciding the request for a variance from setback requirements, the Board may approve the request, as granted, modify the request or deny the request. In granting a variance for reduction of a Drilling and Production Site Setback, the Board may impose such conditions as are necessary to mitigate the impacts of the reduced setbacks and to preserve the public health and safety, including but not limited to, the enhanced mitigation standards contained in Subsection 6.3.2G. c. In deciding requests by a property owner or developer of a Protected Use or residential lot for a variance from Reverse Setbacks that do not meet the requirements for administrative alternative site design approval as described in Subsection 6.2.6C, the Board of Adjustment shall consider, where applicable and in addition to, the general criteria stated in Section 6.2.6B.1.b, the following relevant criteria: i. The reasonable use of the surface of the subject property by the property owner or developer; ii. The availability of alternative site designs or subdivision layouts; and iii. Compatibility with any existing Gas Well Development Site Plan or Gas Well Plat. d. In no event shall the Board of Adjustment reduce the Minimum Setbacks set forth in Subsection 6.2.2. 3. The Board of Adjustment shall determine whether to grant an extension of the expiration for a Gas Well Development Site Plan or Gas Well Permit based upon whether there are circumstances reasonably beyond the control of the Operator, including any delay on the part of the City in issuing subsequent permits, that justify an extension of the Site Plan or Permits, in order that the Operator may enjoy the same rights in the use of the property that are presently enjoyed by other similarly situated properties, but which rights are denied to the property for which the Site Plan or Permits have expired or are suspended. 4. Any action under this subsection B shall require a three-fourths majority vote of the entire Board of Adjustment. 5. Any Operator or other person aggrieved by any decision of the Board of Adjustment may present to a court of record a petition, duly verified, stating that such decision is illegal, in whole or in part, and specifying the grounds of the alleged illegality. Such petition shall be presented within 10 days after the date on which the decision of the Board of Adjustment was rendered and not thereafter, and judicial review of the petition shall be pursuant to TLGC, § 211.011, as amended. C. Administrative Relief Procedures. 1. Drilling and Production Site Setbacks. An Operator may request administrative relief to the Drilling and Production Site Setback requirements of Subsection 6.2.2 for a New or Existing Site from the Gas Well Administrator under the following circumstances: a. The Operator has at least one Existing Site on the property under mineral lease for the property or for contiguous leased property; b. Such Existing Site(s) is located closer to Protected Uses or Residential Subdivisions than is the proposed Drilling and Production Site to such uses; and c. The Operator agrees in a written instrument capable of recording to limit gas well development on such Existing Site(s) to existing Gas Well Drilling and Production Activities. For each Existing Site so restricted, the Gas Well Administrator may reduce the Drilling and Production Site Setback by an amount calculated as follows: 50 percent of the difference between the Drilling and Production Site Setback and the Minimum Setback. As a condition of granting the administrative variance, the Gas Well Administrator shall require that the Operator's written agreement be recorded in the Denton County records at the Operator's expense. 2. Reverse Gas Well Setbacks. The Director may grant administrative relief from the Reverse Setback requirements of Section 6.2.2 upon application of the owner of a Protected Use or residential lot where (i) the property owner has utilized all applicable options for alternative site designs and DDC flexibility provisions to maximize buildable area and (ii) fifty percent (50%) or more of the subject property is encumbered by the Reverse Gas Well Setback. In applying alternative site designs to a subject property under this section: i. For a residential subdivision, the standards for Cluster Developments in Subsection 8.3.4 may be applied without having to meet the minimum parcel size of 5 acres as stated in 8.3.4B.2 and without requiring approval of a Planned Development (PD) in accordance with 8.3.4C.1. Plats for cluster subdivisions shall require approval by the Planning and Zoning Commission in accordance with the applicable procedures in Subchapter 2. ii. For all other Protected Uses, the applicable maximum building height and maximum building coverage may be increased by 20%, and the minimum unit size and minimum required number of parking spaces may be reduced by 20%. D. Vested Rights Appeals. Any person who claims that he has obtained a vested right pursuant to TLGC, Chapter 245, or other applicable vesting law under prior gas well development regulations from the requirements of Section 6.2: Gas Well Development and Section 6.3: Gas Well Drilling and Production, as they pertain to gas well development, may request a determination pursuant to Subsection 2.5.6: Vested Rights. For proposed gas wells to be located inside the City limits, the petitioner shall include a statement of the reasons why the regulations contained in Section 6.3: Gas Well Drilling and Production or Section 6.2: Gas Well Development, as they pertain to Gas Well Development are not exempt pursuant to TLGC section 245.004.
(Ord. No. DCA19-0009c, § 2(Exh. B), 11-19-2010; Ord. No. DCA19-0009e, § 2(Exh. B), 1-28-2020)
Ask a question about Denton law
Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.