For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6.3.9 — Watershed Permits for Gas Well Developments

Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton Development Code subch. 6, § 6.3.9

Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/2b080e89-fbf3-4919-9988-3d4e061dd467

6.3.9 - Watershed Permits for Gas Well Developments.

A. Applicability. 1. A Watershed Protection Permit shall be approved prior to approval of any Gas Well Development Site Plan, Gas Well Development Plat, or Gas Well Permit that includes land in any flood fringe area or ESA within the corporate limits or ETJ of the City, and for any proposed site that is within 1,200 feet of the flood pool elevation of Lake Ray Roberts or Lake Lewisville. Approval of a Watershed Protection Permit authorizes the processing of a complete application for a Gas Well Development Site Plan or Gas Well Development Plat, as the case may be, that includes land in a flood fringe area or ESA, or for a site that is within 1,200 feet of the flood pool elevation of Lake Ray Roberts or Lake Lewisville. No gas well development is allowed in the floodway, including the area of an ESA located in a floodway. 2. Inside the City limits, a Watershed Protection Permit for gas well development can be approved only if the City Council authorizes a Specific Use Permit. In making a recommendation for the SUP, the Director shall apply those standards set forth in Subsection 6.3.9D below. In the City's ETJ, a Watershed Protection Permit may be approved by the Director of Environmental Services, or designee pursuant to the procedures in Subsection 6.3.9C below. 3. A Watershed Protection Permit application may be submitted simultaneously with an application for a Specific Use Permit. B. Application Requirements and Processing. A Watershed Protection Permit shall be processed in accordance with the following: 1. An application for a Watershed Protection Permit shall contain the following information and such information as may be required by the Development Review Committee and the Environmental Services Department, which is reasonably necessary to review and determine whether the proposed development and required facilities meet the requirements of this Section 6.3: Gas Well Drilling and Production; Section 6.2: Gas Well Development; and as required by the Application Criteria Manual. In addition the information shall include the following: a. A Tree Inventory Plan shall show the location of ESAs on any proposed Drilling and Production Site. b. Show location of ESAs on proposed Drilling and Production Sites. 2. All applications for Watershed Protection Permits shall be filed with the Development Services Department, who shall immediately forward all applications to the DRC for review. Incomplete applications shall be returned to the applicant, in which case the City shall provide a written explanation of the deficiencies. The City shall retain a processing fee determined by the City Council. The City may return any application as incomplete if there is a dispute pending before the Railroad Commission regarding the determination of the Operator. No application shall be deemed accepted for filing until the application is complete. C. Procedures. 1. Each application for a Watershed Protection Permit for gas well development in the ETJ shall be approved or denied by the Director of Environmental Services or designee following DRC review. 2. Criteria for Approval for Watershed Protection Permit for Gas Well Development in the City limits. In reviewing the application for a Watershed Protection Permit, the Director shall apply those standards set forth in Subsection 6.3.9D below. The Director may attach such conditions to approval of a Watershed Protection Permit as are necessary to assure that the requirements of Subsection 6.3.9D below and any other applicable requirements contained in this Section 6.3: Gas Well Drilling and Production and Section 6.2: Gas Well Development, are met. 3. Criteria for Approval for Watershed Protection Permits for gas well developments within the ETJ. In deciding the application for a Watershed Protection Permit, the Director shall apply those standards set forth in paragraph 6.3.9D.1; paragraph 6.3.9D.2 for riparian buffers within floodplains; and paragraph 6.3.9D.5. The Director may attach such conditions to approval of a Watershed Protection Permit as are necessary to assure that the requirements of these components of Subsection 6.3.9D below and any other applicable requirements in this Section 6.3: Gas Well Drilling and Production and Section 6.2: Gas Well Development, are met. 4. Each Watershed Protection Permit shall: a. Identify each well subject to the Permit; b. Specify the date on which the Permit was issued; c. Incorporate by reference all applicable standards of approval; and d. Incorporate by reference all applicable conditions of approval. 5. The applicant may appeal the Director's denial or conditional approval of a Watershed Protection Permit in the ETJ on grounds pertaining to the standards in Subsection 6.3.9C.3 below to the City Council within 10 calendar days of the decision by the Director. The Council shall decide the petition based upon the criteria in Subsection 6.3.9C.3 below and any other applicable requirements contained in this Section 6.3: Gas Well Drilling and Production and Section 6.2: Gas Well Development. D. Watershed Protection Permit Standards. The standards in this Subchapter 6: Gas Wells, are adopted pursuant to the authority granted by TLGC, Section 551.002 and Chapter 211 and are intended to minimize adverse impacts on areas within the Flood Fringe or ESA, reduce flood damage, and lessen the potential for contaminating surface water or any water supply. 1. Location of Sites. Drilling and Production Sites shall be located outside floodplains and other ESAs whenever practicable to minimize adverse impacts on these areas, reduce flood damage, and lessen the potential for contaminating surface water or any water supply. 2. Riparian Buffers. For all ESAs constituting or containing riparian buffers prior to the approval of a Gas Well Development Site Plan: a. If a riparian buffer is designated as "fair" to "excellent" ESA, the designated protective stream buffer width as specified in Section 7.4, Environmentally Sensitive Areas of this DDC shall apply, and no encroachments shall be allowed. b. Within all areas except unstudied floodplains, if the stream is designated as a "poor" ESA, the designated width of the protective stream buffer shall be decreased by either 50 percent or to the limits of the floodway whichever is greater, but in no instance shall the protective stream buffer width be decreased below 25 feet measured each direction from the centerline of the existing channel. 3. Tree Mitigation. In the event of a conflict between this Subchapter 6: Gas Wells, and 7.7.4, Tree Preservation, this Subchapter 6: Gas Wells, shall control. Tree mitigation for gas wells located in an ESA shall be required and shall be calculated on a one to one replacement value for 100 percent of the diameter breast height ("dbh") of trees removed from the Drilling and Production Site. Tree mitigation shall be accomplished by planting replacement trees, within a floodplain, on-site or off-site with similar tree species or by payment into a Tree Mitigation Fund. Tree Mitigation Funds that are specific to ESAs will be kept separate from other Tree Mitigation Funds and will only be used to either acquire wooded floodplain or riparian property that remains in a naturalistic state in perpetuity, or to purchase conservation easements within riparian or floodplain areas. Funds may be used to purchase, plant, and maintain trees on public property, as long as the public property is within a riparian area or floodplain. 4. Tree Removal. Any request to remove tree(s) shall be accompanied by a letter from a certified geologist or engineer that indicates why the well site cannot be located to avoid the trees. If Operator has chosen to pay into the Tree Mitigation Fund, such funds shall be paid prior to approval of a Final Gas Well Development Site Plan or Gas Well Development Plat for the ESA. 5. Limitation on Well Heads. Only one well head may be placed in the Flood Fringe or other ESA under the following conditions: a. Storage tanks or separation facilities shall be constructed at least 18 inches above the established Base Flood elevation plus the surcharge depth for encroachment to the limits of the floodway having a one percent chance of being equaled or exceeded in any year. b. A hydrologic and hydraulic engineering study shall be performed by a Registered Professional Engineer. The study shall be submitted to the Engineering Department in a technical report for review by the City Engineer or his designated representative. The report shall demonstrate that the proposed facilities will have no adverse impacts on the carrying capacity of the adjacent waterway nor cause any increases to the elevations established for the floodplain. When the Special Flood Hazard Areas (SFHA) on the subject site is designated as "Zone A" on the FIRM Panel, or the SFHA is not identified on the FIRM Panel, the following approximate method may be used to evaluate the impacts from gas well development. A flow rate shall be calculated using procedures set forth in the City of Denton Drainage Criteria Manual. Using Manning's Equation with an estimate of the average slope of the stream, measurements of a single irregular cross-section geometry at the well site, and the one hundred-year discharge rate, the average velocity and normal depth may be calculated. Calculations shall be provided for the unaltered existing channel cross-section and for the proposed modified channel cross-section and submitted to the City for review and approval prior to construction within these areas. c. No more than 10 percent of the flood fringe, within the limits of the Gas Well Development Site Plan or Gas Well Development Plat, may be filled. 6. Additional Standards inside City Limits. For land inside the City limits, all conditions imposed by any applicable SUP, MPC District or a PD District for the land subject to the Watershed Protection Permit, as well as the standards in Subsection 6.3.9D and any other applicable requirements contained in this Section 6.3: Gas Well Drilling and Production and Section 6.2: Gas Well Development, shall apply. E. Post-Approval Procedures. 1. If evidence from water quality monitoring efforts indicates that contamination is occurring from gas wells, the Operator shall remove, cause to be removed, or otherwise remediate contamination, as required by the Gas Well Administrator including but not limited to Waste Minimization Practices established by the RRC. Cleanup operations shall begin immediately. A re-inspection fee shall be charged as established by the City Council and published in the Application Criteria Manual. 2. An associated Watershed Protection Permit shall expire with the expiration of the Gas Well Development Site Plan or Gas Well Development Plat and may not be extended prior to expiration.

Ask a question about Denton law

Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.