22.805.020 - Minimum requirements for all projects
A. Minimum requirements for maintaining natural drainage patterns. For all projects, natural drainage patterns shall be maintained and discharges shall occur at the natural location to the maximum extent feasible and consistent with subsection 22.805.020.B. Drainage water discharged from the site shall not cause a significant adverse impact to receiving waters or down-gradient properties. Drainage water retained or infiltrated on the site shall not cause significant adverse impact to up-gradient or down-gradient properties.
B. Minimum requirements for discharge point. The discharge point for drainage water from each site shall be selected using criteria that shall include, but not be limited to, preservation of natural drainage patterns and whether the capacity of the drainage system is adequate for the flow rate and volume. For those projects meeting the drainage review threshold, the proposed discharge point shall be identified in the drainage control plan required by this subtitle, for review and approval or disapproval by the Director.
C. Minimum requirements for flood-prone areas. On sites within flood-prone areas, responsible parties are required to employ procedures to minimize the potential for flooding on the site and to minimize the potential for the project to increase the risk of floods on adjacent or nearby properties. Flood control measures shall include those set forth in other titles of the Seattle Municipal Code and rules promulgated thereunder, including, but not limited to, Chapter 23.60A (Seattle Shoreline Master Program Regulations), Chapter 25.06 (Floodplain Development), and Chapter 25.09 (Regulations for Environmentally Critical Areas).
D. Minimum requirements for construction stormwater pollution prevention plan. Temporary and permanent construction controls shall be used to accomplish the following minimum requirements. All projects are required to meet each of the elements below or document why an element is not applicable. Additional controls may be required by the Director when minimum controls are not sufficient to prevent erosion or transport of sediment or other pollutants from the site.
1. Mark clearing limits and environmentally critical areas. Within the boundaries of the project site and prior to beginning land disturbing activities, including clearing and grading, clearly mark all clearing limits, easements, setbacks, all environmentally critical areas and their buffers, and all trees and drainage courses that are to be preserved within the construction area.
2. Retain top layer. Within the boundaries of the project site, the duff layer, topsoil, and native vegetation, if there is any, shall be retained in an undisturbed state to the maximum extent feasible. If it is not feasible to retain the top layer in place, it should be stockpiled on-site, covered to prevent erosion, and replaced immediately upon completion of the land disturbing activities to the maximum extent feasible.
3. Establish construction access. Limit construction vehicle access, whenever possible, to one route. Stabilize access points and minimize tracking sediment onto public roads. Promptly remove any sediment tracked off site.
4. Protect downstream properties and receiving waters. Protect properties and receiving waters downstream from the development sites from erosion or flooding due to increases in the volume, velocity, duration, and peak flow rate of drainage water from the project site. If it is necessary to construct flow control facilities to meet this requirement, these facilities shall be functioning prior to implementation of other land disturbing activity. If permanent infiltration facilities are used to control flows during construction, these facilities shall be protected from siltation during the construction phase of the project.
5. Prevent erosion and sediment transport from the site. Pass all drainage water from disturbed areas through a sediment trap, sediment pond, or other appropriate sediment removal BMP before the water leaves the site or prior to discharge to an infiltration facility. Sediment controls intended to trap sediment on site shall be constructed as one of the first steps in grading and shall be functional before other land disturbing activities take place. BMPs intended to trap sedimentation shall be located in a manner to avoid interference with the movement of juvenile salmonids attempting to enter off-channel areas or drainages. Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal and maximize stormwater infiltration where feasible.
6. Prevent erosion and sediment transport from the site by vehicles. Whenever construction vehicle access routes intersect paved roads, the transport of sediment onto the paved road shall be minimized. If sediment is transported onto a paved road surface, the roads shall be cleaned thoroughly at the end of each day. Sediment shall be removed from paved roads by shoveling or sweeping and shall be transported to a controlled sediment disposal area. If sediment is tracked off site, roads shall be cleaned thoroughly at the end of each day, or at least twice daily during wet weather. Street washing is allowed only after sediment is removed, and street wash wastewater shall be prevented from entering the drainage system and receiving waters.
7. Stabilize soils. Prevent on-site erosion by stabilizing all exposed and unworked soils, including stock piles and earthen structures such as dams, dikes, and diversions. From October 1 to April 30, no soils shall remain exposed and unworked for more than two days. From May 1 to September 30, no soils shall remain exposed for more than seven days. Soils shall be stabilized at the end of the shift before a holiday or weekend if needed based on the weather forecast. Soil stockpiles shall be stabilized from erosion, protected with sediment trapping measures, and be located away from storm drain inlets, waterways, and drainage channels. Before the completion of the project, permanently stabilize all exposed soils that have been disturbed during construction.
8. Protect slopes. Erosion from slopes shall be minimized. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Off-site stormwater run-on or groundwater shall be diverted away from slopes and undisturbed areas with interceptor dikes, pipes, and/or swales. Pipe slope drains or protected channels shall be constructed at the top of slopes to collect drainage and prevent erosion. Excavated material shall be placed on the uphill side of trenches, consistent with safety and space considerations. Check dams shall be placed at regular intervals within constructed channels that are cut down a slope.
9. Protect storm drains. Prevent sediment from entering all storm drains, including ditches that receive drainage water from the project. Storm drain inlets protection devices shall be cleaned or removed and replaced as recommended by the product manufacturer, or more frequently if required to prevent failure of the device or flooding. Storm drain inlets made operable during construction shall be protected so that drainage water does not enter the drainage system without first being filtered or treated to remove sediments. Storm drain inlet protection devices shall be removed at the conclusion of the project. When manufactured storm drain inlet protection devices are not feasible, inlets and catch basins must be cleaned as necessary to prevent sediment from entering the drainage control system.
10. Stabilize channels and outlets. All temporary on-site drainage systems shall be designed, constructed, and stabilized to prevent erosion. Stabilization shall be provided at the outlets of all drainage systems that is adequate to prevent erosion of outlets, adjacent stream banks, slopes, and downstream reaches.
11. Control pollutants. Measures shall be taken to control potential pollutants and shall include, but not be limited to, the following measures:
a. All pollutants, including sediment, waste materials, and demolition debris, that occur on site shall be handled and disposed of in a manner that does not cause contamination of drainage water and pursuant to all applicable disposal laws.
b. Containment, cover, and protection from vandalism shall be provided for all chemicals, liquid products, petroleum products, and other materials that have the potential to pose a threat to human health or the environment.
c. On-site fueling tanks shall include secondary containment.
d. Maintenance, fueling, and repair of heavy equipment and vehicles involving oil changes, hydraulic system drain down, solvent and de-greasing cleaning operations, fuel tank drain down and removal, and other activities which may result in discharge or spillage of pollutants to the ground or into drainage water runoff shall be conducted using spill prevention and control measures.
e. Contaminated soils shall be removed and surfaces shall be cleaned immediately following any discharge or spill incident.
f. Wheel wash or tire bath wastewater shall be discharged to a separate on-site treatment system that prevents discharge to surface water, or to the sanitary sewer or combined sewer system with approval of the Director of SPU. Temporary discharges or connections to the public sanitary and combined sewers shall be made in accordance with Chapter 21.16 (Side Sewer Code).
g. Application of fertilizers and pesticides shall be conducted in a manner and at application rates that will not result in loss of chemical to drainage water. Manufacturers' label requirements for application rates and procedures shall be followed.
h. BMPs shall be used to prevent or treat contamination of drainage water by pH-modifying sources. These sources include, but are not limited to, recycled concrete stockpiles, bulk cement, cement kiln dust, fly ash, new concrete washing and curing waters, waste streams generated from concrete grinding and sawing, exposed aggregate processes, and concrete pumping and mixer washout waters. Construction site operators may be required to adjust the pH of drainage water if necessary to prevent a violation of water quality standards.
i. Construction site operators must obtain written approval from Ecology prior to using chemical treatment other than carbon dioxide (CO 2 ) dry ice, or food grade vinegar, to adjust pH.
j. Uncontaminated water from water-only based shaft drilling for construction of building, road, and bridge foundations may be infiltrated provided the wastewater is managed in a way that prevents discharge to surface waters. Prior to infiltration, water from water-only based shaft drilling that comes into contact with curing concrete must be neutralized until pH is in the range of 6.5 to 8.5 (su).
k. Train all employees on proper BMPs for preventing illicit discharges, including spills.
12. Control dewatering. When dewatering devices discharge on site, to a public drainage system, or to the public combined sewer, dewatering devices shall discharge into a sediment trap, sediment pond, gently sloping vegetated area of sufficient length to remove sediment contamination, or other sediment removal BMP. Foundation, vault, and trench dewatering waters must be discharged into a controlled drainage system prior to discharge to a sediment trap or sediment pond. Clean, non-turbid dewatering water, such as unpolluted well-point groundwater, that is discharged to systems tributary to surface waters must not cause erosion or flooding. Highly turbid or contaminated dewatering water shall be handled separately from drainage water. For all projects with an excavation depth of 12 feet or more below the existing grade, all projects with an excavation depth of less than 12 feet located in an area expected to have shallow groundwater depths, and all projects with 5,000 square feet or more of new plus replaced hard surface or one acre or more of land disturbing activity, a dewatering analysis must be performed to determine dewatering flows and to verify that there is sufficient capacity in the downstream system (e.g., public drainage system or public combined sewer) for review and approval or disapproval by the Director.
13. Maintain BMPs. All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as needed to assure continued performance of their intended function. All temporary erosion and sediment controls shall be removed within five days after final site stabilization is achieved or after the temporary controls are no longer needed, whichever is later. Trapped sediment shall be removed or stabilized on site. Disturbed soil areas resulting from removal shall be permanently stabilized.
14. Inspect BMPs. BMPs shall be periodically inspected. For projects with 5,000 square feet or more of new plus replaced hard surface or 7,000 square feet or more of land disturbing activity, site inspections shall be conducted by a Certified Erosion and Sediment Control Lead who shall be identified prior to construction and shall be present on-site or on-call at all times.
15. Execute construction stormwater control plan. Construction site operators shall maintain, update, and implement their construction stormwater control plan. Construction site operators shall modify their construction stormwater control plan to maintain compliance whenever there is a change in design, construction, operation, or maintenance at the site that has, or could have, a significant effect on the discharge of pollutants to waters of the state.
16. Minimize open trenches. In the construction of underground utility lines, where feasible, no more than 150 feet of trench shall be opened at one time, unless soil is replaced within the same working day, and where consistent with safety and space considerations, excavated material shall be placed on the uphill side of trenches. Trench dewatering devices shall discharge into a sediment trap or sediment pond.
17. Phase the project. Development projects shall be phased to the maximum extent feasible in order to minimize the amount of land disturbing activity occurring at the same time and shall take into account seasonal work limitations.
18. Install flow control and water quality facilities. Development projects required to comply with Section 22.805.080 (Minimum requirements for flow control) or Section 22.805.090 (Minimum requirements for treatment) shall install permanent flow control and water quality facilities to prevent erosion or transport of sediment or other pollutants from the site during construction.
19. Protect stormwater BMPs
a. Protect all stormwater BMPs from sedimentation through installation and maintenance of erosion and sediment control BMPs. Restore the BMPs to their fully functioning condition if they accumulate sediment during construction. Restoring the stormwater BMP must include removal of sediment and any sediment-laden stormwater BMP soils, and replacing the removed soils with soils meeting the design specification.
b. Prevent compacting infiltration BMPs by excluding construction equipment and foot traffic. Protect completed lawn and landscaped areas from compaction due to construction equipment.
c. Control erosion and avoid introducing sediment from surrounding land uses onto permeable pavements. Do not allow muddy construction equipment on the base material or pavement. Do not allow sediment-laden runoff onto permeable pavements or base materials.
d. Permeable pavements fouled with sediments or no longer passing an initial infiltration test must be cleaned until infiltrating per design or replaced.
e. Keep all heavy equipment off existing soils under infiltration BMPs, especially those that have been excavated to final grade, to retain the infiltration rate of the soils.
E. Protect wetlands. All projects discharging into a wetland or its buffer, either directly or indirectly through a drainage system, shall prevent impacts to wetlands that would result in a net loss of functions or values.
F. Protect Streams and creeks. All projects, including projects discharging directly to a stream or creek, or to a drainage system that discharges to a stream or creek, shall maintain the water quality in any affected stream or creek by selecting, designing, installing, and maintaining temporary and permanent controls.
G. Protect shorelines. All projects discharging directly or indirectly through a drainage system into the shoreline district as defined in Chapter 23.60A (Seattle Shoreline Master Program Regulations) shall prevent impacts to water quality and stormwater quantity that would result in a net loss of shoreline ecological functions as defined in WAC 173-26-020(13).
H. Ensure sufficient capacity. All projects with 5,000 square feet or more of new plus replaced hard surface or one acre of land disturbing activity, all projects with an excavation depth of 12 feet or more below the existing grade, all projects with an excavation depth of less than 12 feet located in an area expected to have shallow groundwater depths, and all projects that alter the drainage pattern from 5,000 square feet or more of an existing, new, or replaced hard surface or 3/4 of an acre or more of a pervious surface from a site to a downstream system not previously connected via discrete conveyance shall ensure that sufficient capacity exists in the drainage system and public combined sewer to carry existing and anticipated loads, including any flows from dewatering activities. Capacity analysis shall extend to at least 1/4-mile from the discharge point of the site. Sites at which there is insufficient capacity may be required to install a flow control facility or improve the drainage system or public combined sewer to accommodate flow from the site. Unless approved otherwise by the Director as necessary to meet the purposes of this subtitle:
1. Capacity analysis for discharges to the drainage system shall be based on peak flows with a 4 percent annual probability (25-year recurrence interval); and
2. Capacity analysis for discharges to the public combined sewer shall be based on peak flows with a 20 percent annual probability (5-year recurrence interval).
I. Install source control BMPs. Source control BMPs shall be installed for discharges, properties, and by businesses and public entities for specific pollution-generating activities as specified in Chapter 22.803 and in the joint SPU/SDCI Directors' Rule titled "Seattle Stormwater Manual" at "Volume 4—Source Control," to the extent necessary to prevent prohibited discharges as described in Section 22.802.020 and to prevent contaminants from coming in contact with drainage water. This requirement applies to the pollution-generating activities that are stationary or occur in one primary location and to the portion of the site being developed. Examples of installed source controls include, but are not limited to, the following:
1. A roof, awning, or cover erected over the pollution-generating activity area;
2. Ground surface treatment in the pollution-generating activity area to prevent interaction with, or breakdown of, materials used in conjunction with the pollution-generating activity;
3. Containment of drainage from the pollution-generating activity to a closed sump or tank. Contents of such a sump or tank must be pumped or hauled by a waste handler, or treated prior to discharge to a public drainage system;
4. Construct a berm or dike to enclose or contain the pollution-generating activities;
5. Direct drainage from containment area of pollution-generating activity to a closed sump or tank for settling and appropriate disposal, or treat prior to discharging to a public drainage system;
6. Pave, treat, or cover the containment area of pollution-generating activities with materials that will not interact with or break down in the presence of other materials used in conjunction with the pollution-generating activity; and
7. Prevent precipitation from flowing or being blown onto containment areas of pollution-generating activities.
J. Do not obstruct watercourses. Watercourses shall not be obstructed.
K. Comply with Side Sewer Code
1. All privately owned and operated drainage control facilities or systems, whether or not they discharge to a public drainage system or public combined sewer, shall be considered side sewers and subject to Chapter 21.16 (Side Sewer Code), SPU Director's Rules promulgated under Title 21, and the design and installation specifications and permit requirements of SPU for side sewer and drainage systems.
2. Side sewer permits and inspections shall be required for constructing, capping, altering, or repairing privately owned and operated drainage systems as provided for in Chapter 21.16. When the work is ready for inspection, the permittee shall notify the Director of SPU. If the work is not constructed according to the plans approved under this Subtitle VIII, Chapter 21.16, the SPU Director's Rules promulgated under Title 21, and SPU design and installation specifications, then the Director may issue a stop work order under Chapter 22.808 and require modifications as provided for in this Subtitle VIII and Chapter 21.16.
L. Extension of the public drainage system for projects not constructed in the public right-of-way. For projects not constructed in the public right-of-way, extension of the piped public drainage system across the full extent of the parcel boundary in the abutting public place shall be required for any of the following:
1. All projects where the Director has determined an extension is required considering, but not limited to, the following attributes of the project:
a. Poses a hazard to public health, safety, or welfare;
b. Endangers any property;
c. Adversely affects the safety and operation of public right-of-way, utilities, or other property owned or maintained by the City;
d. Adversely affects the functions and values of an environmentally critical area or buffer;
e. Adversely affects an area with known erosion or flooding problems; or
f. Adversely affects receiving waters, any properties, or right-of-way.
2. All projects with 5,000 square feet or more of new plus replaced hard surface, unless:
a. The piped public drainage system is already accessible within an abutting public place to each existing, proposed, or adjusted parcel; or
b. The project is otherwise not required to extend by rules promulgated by the Director.
M. Extension of the public drainage system for projects constructed in the public right-of-way. For projects constructed in the public right-of-way, extension of the piped public drainage system across the full extent of the site shall be required for any of the following:
1. All projects where the Director has determined an extension is required considering, but not limited to, the following attributes of the project:
a. Poses a hazard to public health, safety, or welfare;
b. Endangers any property;
c. Adversely affects the safety and operation of City right-of-way, utilities, or other property owned or maintained by the City;
d. Adversely affects the functions and values of an environmentally critical area or buffer;
e. Adversely affects an area with known erosion or flooding problems; or
f. Adversely affects receiving waters, any properties, or right-of-way.
2. The project's total new plus replaced hard surface is 50 percent or more of the existing hard surfaces within the project limits. The project limits are defined by the length of the project and the width of the right-of-way. If a project encompasses more than one intersection, the project limits are further defined by one intersection to the other and blocks may vary in length, unless:
a. The piped public drainage system is already accessible within the site across the full extent of the site; or
b. The project is otherwise not required to extend by rules promulgated by the Director.
N. Public drainage system requirements. Public drainage systems shall be constructed in accordance with the City's Standard Plans and Specifications, SPU's Design Standards and Guidelines, and as specified in rules promulgated by the Director of SPU.
O. Minimum requirements for treatment. All projects that connect flows from 5,000 square feet or more of an existing, new, or replaced pollution-generating hard surface from the site not previously connected via discrete conveyance to a drainage system that discharges to a receiving water or a receiving water, and all projects that convert an existing hard surface of 5,000 square feet or more to a pollution-generating hard surface (e.g., an existing slab not previously subject to vehicular use) and direct flows from the site not previously connected via discrete conveyance to a drainage system that discharges to a receiving water or a receiving water, shall comply with the minimum requirements for treatment contained in Section 22.805.090 to treat flows from those pollution-generating hard surfaces. When stormwater flows from other areas, including non-pollution generating surfaces (e.g., roofs), dewatering activities, and off-site areas, cannot be separated or bypassed, treatment BMPs shall be designed for the entire area draining to the treatment facility.
(Ord. 127444, § 5, 2026; Ord. 126336, § 4, 2021; Ord. 124919, § 96, 2015; Ord. 124872, § 35, 2015; Ord. 124105, § 7, 2013; Ord. 123105, § 3, 2009.)