§ 15.75.060 — Investigation – Retrofit requirement
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 15.75.060
Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/3ff26f60-1b02-42d8-a804-c7cab965ce7b
15.75.060 Investigation – Retrofit requirement.
(a) Comprehensive Investigation and Retrofit. To comply with all the performance requirements of this chapter, the owner(s) of a building within the scope of this chapter shall cause to be made an investigation of the existing construction of the building and a structural analysis of the building by a civil or structural engineer or architect licensed by the state of California, including completion of the survey checklists set forth in Section 15.75.200. If the building does not meet the minimum earthquake performance standards specified in Section 15.75.140 or is noncompliant with an item on the survey checklist, the owner shall cause the building to be structurally altered to conform to those standards and correct any noncompliant items. Except as provided in Section 18.190.060 and as may otherwise be provided in this code, the investigation, analysis and retrofit requirements described in this subsection are voluntary. (b) Mandatory Retrofit for Apartment Houses. The owner(s) of an apartment house that has been determined by the building official to be within the scope of this chapter shall cause to be made an investigation of the existing construction of the building and a structural analysis of the building by a civil or structural engineer or architect licensed by the state of California to determine whether the building complies with the minimum performance standards of Section 15.75.140 for soft or open wall lines. If the building does not meet the performance standards for soft or open wall lines, the owner must cause the building to be structurally altered to conform to those performance standards within the following timeframe: | Rating Classification | Submittal of Engineered Plans and Issuance of Building Permit | Completion of Construction | Group I: Apartment house with more than 10 units or more than two stories | 24 months from date of notice | 48 months from date of notice | Group II: Apartment house with 10 or less units and fewer than three stories high | 36 months from date of notice | 60 months from date of notice (c) Extension of Retrofit Deadline. The owner of an apartment house may apply to the city for a financial hardship extension of the retrofit timeframes provided in subsection (b) of this section. The application shall be presented to the building official and contain a complete explanation of the reasons why compliance within the timeframes set forth in subsection (b) of this section would constitute a financial hardship and the length of extension requested. The building official may grant or condition an appropriate extension or deny the request. The building official’s decision may be appealed to the city council as provided in Sections 1.25.010 et seq. (d) Alternative to Mandatory Retrofit of Substandard Apartments. When the owner of an apartment house that does not meet the performance standards of Section 15.75.140 for soft or open wall lines intends to demolish the building, the demolition shall be completed within the timeframe set forth in subsection (b) of this section; provided, however, that the building official may grant an extension up to two years if all of the following conditions are met: (1) The owner applies for a voluntary demolition extension in writing with all necessary supporting documents before the expiration deadline for obtaining a retrofit permit; and (2) The owner posts a performance bond equal to the cost of demolition including any cost of relocating existing businesses; and (3) The owner provides written statements from all of the building tenants acknowledging receipt of the owner’s notice of intent to demolish the premises on a specific date and agreeing to vacate the building no later than 90 days before that date. (Ord. 10-2007 § 8, 5-1-07. 1990 Code § 7-10105.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.
