For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.75.160 — Prescriptive measures for soft story

Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 15.75.160

Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/95f2ba6d-a4b7-4b35-8fd8-30f0182290d9

15.75.160 Prescriptive measures for soft story.

(a) Limitation. These prescriptive measures shall apply only to two-story buildings and only when deemed appropriate by the building official. These prescriptive measures rely on rotation of the second floor diaphragm to distribute the seismic load between the side and rear walls of the ground floor open area. In the absence of an existing floor diaphragm of wood structural panel or diagonal sheathing, a new wood structural panel diaphragm of minimum thickness of three-fourths inch (19 millimeters) and with 10d common nails at six inches (152 millimeters) on center shall be applied. (b) Additional Conditions. To qualify for these prescriptive measures, the following additional conditions need to be satisfied by the retrofitted structure: (1) Diaphragm aspect ratio L/W is less than 0.67, where W is the diaphragm dimension parallel to the soft, weak or open-front wall line and L is the distance in the orthogonal direction between that wall line and the rear wall of the ground floor open area. (2) Minimum length of side shear walls equals 20 feet (6,096 millimeters). (3) Minimum length of rear shear wall equals three-fourths of rear wall. (4) No plan or vertical irregularities other than a soft, weak or open-front wall line. (5) Roofing weight less than or equal to five pounds per square foot (240 N/m2). (6) Aspect ratio of the full second floor diaphragm meets the requirements of the Building Code for new construction. (c) Performance. The improved earthquake performance of the structure due to the proposed prescriptive measures varies and is greatly controlled by all of the following: proximity to the fault line, soil type, weight of roof and floor above, quality of existing walls, posts and columns and their connections to the floor diaphragm, and the quality of construction provided in order to comply with the prescriptive measures. The implementation of the proposed measures is not intended to improve the earthquake performance of the building above the first story. (d) Minimum Required Retrofit. (1) Anchor Bolt Size and Spacing. The anchor bolt size and spacing shall be a minimum of three-fourths inch (19 millimeters) in diameter at 32 inches (813 millimeters) on center. Where existing bolts are inadequate, new steel plates bolted to the side of the foundation and nailed to the sill may be used, such as an approved connector. (2) Connection to Floor Above. Shear wall top plates shall be connected to blocking or rim joist at upper floor with a minimum of 18-gage galvanized steel angle clips four and one-half inches (114 millimeters) long with 12 8d nails spaced no farther than 16 inches (406 millimeters) on center, or by equivalent shear transfer methods. (3) Shear Wall Sheathing. The shear wall sheathing shall be a minimum of fifteen-thirty-seconds inch (11.9 millimeters) five-ply structural I with 10d nails at four inches (102 millimeters) on center at edges and 12 inches (305 millimeters) on center at field; blocked all edges with three by four or larger. Where existing sill plates are less than three-by thick, place flat two-by on top of sill between studs, with flat 18-gage galvanized steel clips four and one-half inches (114 millimeters) long with 12 8d nails or three-eighths-inch diameter (9.5 millimeters) lags through blocking for shear transfer to sill plate. Stagger nailing from wall sheathing between existing sill and new blocking. Anchor new blocking to foundation as specified above. (4) Shear Wall Hold-Downs. Shear walls shall be provided with hold-down anchors at each end. Two hold-down anchors are required at intersecting corners. Hold-downs shall be approved connectors with a minimum five-eighths-inch diameter (15.9 millimeters) threaded rod or other approved anchor with a minimum allowable load of 4,000 pounds (17.8 kilonewtons). Anchor embedment in concrete shall not be less than five inches (127 millimeters). Tie-rod systems shall not be less than five-eighths-inch (15.9 millimeters) in diameter unless using high strength cable. Threaded rod or high strength cable elongation shall not exceed five-eighths-inch (15.9 millimeters) using design forces. (Ord. 10-2007 § 21, 5-1-07. 1990 Code § 7-10303.)

Ask a question about Fremont law

Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.