§ 21-230 — Traffic control device electric rate schedule
Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee City Code § 21-230
Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/5ea4a7b1-8738-488a-ab16-72329c5e4f58
Sec. 21-230. - Traffic control device electric rate schedule.
(a) Availability. The traffic control device electric rate schedule is available throughout the entire territory served by the city. (b) Application. The traffic control device electric rate schedule shall be applicable for electric service for governmental traffic control devices and signal lighting where the signal system is connected with the city's existing distribution lines. (c) Character of service. The traffic control device electric rate schedule shall be single phase, 60-hertz, approximately 120 volts or higher at the city's option. Standby or resale is not permitted under this rate schedule. (d) Monthly rate. (1) Customer charge: $10.57 (2) Nonfuel energy charge: $0.05070 per kWh (e) Adjustment. The amount computed at the monthly rate in this section shall be adjusted by an amount calculated in accordance with the formula specified in the city's energy cost recovery clause which is incorporated by reference as a part of this rate schedule. (f) Minimum charge. The monthly minimum charge shall be the customer charge. (g) Tax adjustment. The amount computed at the monthly rate in this section as adjusted by the application of the monthly energy cost recovery clause shall be subject to taxes, assessments and surcharges imposed or assessed by any governmental authority on the basis of meters or customers or the price of or revenues from electric energy or service sold or volume of energy generated or purchased for sale or the volume of energy sold. (h) Limitation of service. The city, while exercising reasonable diligence at all times to furnish service hereunder, does not guarantee continuous lighting and will not be liable for damages from any interruption, deficiency, or failure of service and reserves the right to interrupt service at any time for necessary repairs to lines or equipment and for system protection. The customer will make a lump sum payment for the cost of poles and installation, changes in the height of existing poles, or the installation of additional poles in the city's distribution lines, or the cost of any other facilities required for the provision of service under this rate schedule. (i) Interruption of service. The city will make reasonable provisions to ensure satisfactory and continuous service, but does not guarantee a continuous supply of electrical energy and shall not be liable for damage occasioned by interruptions of service or failure to commence delivery caused by an act of God, or the public enemy, or for any cause reasonably beyond its control, including but not limited to the failure or breakdown of generating or transmitting facilities, floods, fire, strikes, or action or order of any agency having jurisdiction in the premises, or for interruptions which are necessary for inspection, repair, or changes in the generating equipment or transmission and distribution system of the city. The customer shall notify the city immediately of any defects, trouble or accident which may in any way affect the delivery of power by the city to the customer.
(Code 1957, § 34-13; Code 1984, § 25-33; Ord. No. 78-O-1614, §§ 5, 8, 3-28-1978; Ord. No. 80-O-1775, §§ 5, 8, 6-10-1980; Ord. No. 82-O-2062, § 5, 1-11-1983; Ord. No. 84-O-2279AA, § 5, 5-22-1984; Ord. No. 86-O-2589AA, § 6, 5-28-1986; Ord. No. 87-O-0016AA, § 5, 4-8-1987; Ord. No. 90-O-0078AA, § 8, 9-12-1990; Ord. No. 92-O-0017AA, § 8, 7-7-1992; Ord. No. 93-O-0019AA, § 5, 7-13-1993; Ord. No. 94-O-0028, § 6, 7-6-1994; Ord. No. 95-O-0041, § 5, 11-21-1995; Ord. No. 96-O-0035, § 5, 12-18-1996; Ord. No. 01-O-10AA, § 5, 3-21-2001; Ord. No. 01-O-62, § 9, 1-23-2002; Ord. No. 06-O-23AA, § 5, 3-29-2006; Ord. No. 13-O-07, § 5, 3-27-2013; Ord. No. 14-O-42, § 5, 10-22-2014; Ord. No. 18-O-27, § 5, 9-26-2018)
Ask a question about Tallahassee law
Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.