§ 21-231 — Lighting service electric rate schedule

Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee City Code § 21-231

Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/6e034748-5d22-4005-92fc-c77842d039ff

Sec. 21-231. - Lighting service electric rate schedule.

(a) Charges and collection. The city shall charge and collect for private outdoor lighting and public street lighting electric energy on the basis of availability, application, character of service, monthly rate, installation and facilities charge, tax adjustment, and energy cost recovery. (b) Availability. The private outdoor lighting electric rate schedule is available throughout the entire territory served by the city. (c) Application. The private outdoor lighting electric rate schedule is available for year-round outdoor lighting of public streets, yards, driveways, walkways and other areas. Lights to be served hereunder shall be at locations which are easily and economically accessible to city equipment and personnel for construction and maintenance. (d) Character of service. Service includes lamp renewals, energy from approximately dusk each day until approximately dawn the following day, and maintenance of the facilities. The city will replace all burned-out lamps and will maintain its facilities during regular daytime working hours as soon as practicable following notification by the customer that such work is necessary. The city shall be permitted to enter the customer's premises at all reasonable times for the purpose of inspecting, maintaining, installing, and removing any or all of its equipment and facilities. Standby or resale service is not permitted under this rate schedule. (e) Interruption of service. The city will make reasonable provisions to ensure satisfactory and continuous service, but does not guarantee a continuous supply of electrical energy and shall not be liable for damage occasioned by interruptions of service or failure to commence delivery caused by an act of God, or the public enemy, or for any cause reasonably beyond its control, including but not limited to the failure or breakdown of generating or transmitting facilities, floods, fire, strikes, or action or order of any agency having jurisdiction in the premises, or for interruptions which are necessary for inspection, repair, or changes in the generating equipment or transmission and distribution system of the city. The customer shall notify the city immediately of any defects, trouble or accident which may in any way affect the delivery of power by the city to the customer. _____ (f) Monthly rate. Average Wattage and Initial Lumen and Light Fixture Type | Average Monthly kWh Usage* | Monthly Rate 175 watt—8,500 lumen standard light fixture | 66 kWh | $3.73 175 watt—8,500 lumen decorative light fixture | 66 kWh | $7.05 400 watt—23,000 lumen standard light fixture | 152 kWh | $4.44 700 watt—40,000 lumen standard light fixture | 266 kWh | $6.00 100 watt—8,800 lumen standard light fixture | 49 kWh | $4.08 100 watt—8,800 lumen decorative light fixture | 49 kWh | $7.38 150 watt—13,000 lumen standard light fixture | 74 kWh | $4.60 250 watt—25,000 lumen standard light fixture | 130 kWh | $12.68 400 watt—40,000 lumen standard light fixture | 208 kWh | $15.87 * Amounts shown include energy losses associated with ancillary equipment. The average monthly consumption is based on a 30-day bill period, and both the consumption and applicable monthly rate will vary depending on the number of days in the bill period. ** Closed service schedule, available to only existing customers at existing locations as of October 1, 1982. (g) Limitation of service. Overhead conductors will not be installed in any area designated as an underground distribution area or in any area, premises or location served from an underground source. No new mercury vapor lighting installations will be made. The portions of this schedule noted (**) shall be available only at existing locations prior to October 1, 1982. On and after October 1, 1982, if fixtures accommodating such lighting are removed from service for any reason, such schedule shall no longer be available at such location. (h) Adjustment. The amount computed at the monthly rate in this section shall be adjusted by an amount calculated in accordance with the formula specified in the city's energy cost recovery clause, which is incorporated by reference as a part of this rate schedule. (i) Tax adjustment. The amount computed at the monthly rate in this section, as adjusted by the application of the monthly energy cost recovery clause, shall be subject to taxes, assessments, and surcharges imposed or assessed by any governmental authority on the basis of meters or customers or the price of or revenues from electric energy or service sold or volume of energy generated or purchased for sale or the volume of energy sold. (j) Installation and facilities charge. At the option of the city, fixtures will be mounted on existing distribution poles and served from existing overhead wire. When requested by the customer, and at the option of the city, additional spans of wire or additional wood or ornamental poles or underground conductors may be installed by the city upon agreement by the customer to use the facilities for a minimum of five years and pay each month the charges specified in this section. The customer will make a lump sum payment for the cost of poles and installation or the installation of additional poles in the city's distribution lines or the cost of any other facilities required, as determined by the city, for the installation of lights to be served hereunder. At the customer's request, the city will upgrade to a higher level of illumination without an installation charge when the changes are consistent with good engineering practices. In all cases where luminaires are replaced the customer will sign a new service agreement. Billing on the rate for the new luminaire or lamp size will begin at the next regular billing date. A luminaire may be relocated at the customer's request upon payment by the customer of the costs of removal and reinstallation. The city will not be required to install equipment at any location where the service may be objectionable to others. If it is found after the installation that the light is objectionable, the city may at its option terminate the service. When the city relocates or removes its facilities to comply with governmental requirements or for any other reason, either the city or the customer shall have the right, upon written notice, to discontinue service hereunder without obligation or liability. (k) Charges for nonstandard equipment, facilities and services. If nonstandard services, equipment or facilities are requested by the customer, and the city agrees to provide the requested services, equipment or facilities, the customer shall reimburse the city for the cost of the requested equipment, facilities or services. (l) Special provision. In addition to other applicable fees or charges for lighting service, the city shall charge and collect from each residential customer within the street lighting districts located in zone A, as specified and described in that certain agreement between the city and Talquin Electric Cooperative, Inc., dated October 11, 1989 (as thereafter modified or amended), an outdoor street lighting fee in the amount of $1.50 per month. Amounts so collected shall be paid by the city to Talquin Electric Cooperative, Inc., in accordance with the agreement.

(Code 1957, § 34-14; Code 1984, § 25-34; Ord. No. 78-O-1614, §§ 6, 8, 3-28-1978; Ord. No. 80-O-1775, §§ 6, 8, 6-10-1980; Ord. No. 82-O-2062, § 6, 1-11-1983; Ord. No. 84-O-2279AA, § 6, 5-22-1984; Ord. No. 86-O-2589AA, § 7, 5-28-1986; Ord. No. 87-O-0016AA, § 6, 4-8-1987; Ord. No. 90-O-0078AA, § 9, 9-12-1990; Ord. No. 92-O-0017AA, § 9, 7-7-1992; Ord. No. 93-O-0019AA, § 6, 7-13-1993; Ord. No. 94-O-0028, § 7, 7-6-1994; Ord. No. 95-O-0041, § 6, 11-21-1995; Ord. No. 96-O-0035, § 6, 12-18-1996; Ord. No. 99-O-0035, § 1, 10-27-1999; Ord. No. 01-O-10AA, § 6, 3-21-2001; Ord. No. 01-O-62, § 10, 1-23-2002; Ord. No. 02-O-103, § 5, 9-25-2002; Ord. No. 06-O-23AA, § 6, 3-29-2006; Ord. No. 13-O-07, § 6, 3-27-2013; Ord. No. 14-O-42, § 6, 10-22-2014; Ord. No. 18-O-27, § 6, 9-26-2018)

Ask a question about Tallahassee law

Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.