For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21-240 — Commercial and industrial load control rider rate schedule

Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee City Code § 21-240

Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/b2ed7913-a91f-442d-8315-a1f74d88a356

Sec. 21-240. - Commercial and industrial load control rider rate schedule.

(a) Availability. This schedule is available throughout the entire territory served by the city. The total load reduction subscription limit for this rider is 13 MW. No application will be accepted that would cause this subscription limit to be exceeded. (b) Application. This rider is available to a customer who is eligible for service under the city's general service demand or general service large demand rate schedule, and who agrees to allow the city to curtail a portion of the customer's electric load through the remote activation of onsite load curtailment equipment in order to provide a specified level of load reduction on the city's system. The city will equip customer with a building and metering interface device that enables direct load management and control of customer onsite load curtailment equipment and provides power metering, data collection, real-time data communication, and Internet-based reporting and analytics. (c) Monthly rate. The rates and all other terms and conditions of the city's general service demand or general service large demand rate schedule (whichever is otherwise applicable) shall be applicable under this rider, subject to a capacity credit. (d) Capacity credit. The city will apply a capacity credit of $3.23 per kW per month of load reduction provided by the customer as defined in the customer agreement. The above credit will be deducted from the monthly electric bill as computed in accordance with the provisions of the monthly rate section of the customer's applicable rate schedule before application of any discounts or adjustments. Upon mutual agreement between the city and the customer, the reduction may be provided as a separate payment to the customer in lieu of a bill credit. (e) Special provisions. (1) Customers must provide a minimum load reduction of 50 kW at a single electric delivery point. The city may waive the required minimum load reduction if, in the city's sole judgment, a lower minimum load reduction can be justified on a cost basis. (2) The customer must enter into an agreement with the city for commercial and industrial load control rider service ("customer agreement") setting forth the specific terms and conditions applicable to service under this rider. The terms and conditions of the customer agreement may be established and modified by, and the customer agreement may be executed by, the city manager or designee. (3) As an integral requirement of service under this rider, the customer must agree to relinquish to the city direct remote control of the customer's specified onsite load curtailment equipment during the periods specified in the customer agreement.

(Ord. No. 14-O-28, § 1, 7-9-2014; Ord. No. 18-O-27, § 12, 9-26-2018)

Ask a question about Tallahassee law

Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.