§ 21-243 — Schedule of charges
Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee City Code § 21-243
Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/e7f22502-a39d-4692-9389-17beecfe733e
Sec. 21-243. - Schedule of charges.
(a) Charges. At the customer's request, and subject to the customer's payment of the associated charge below, the city will provide any of the following services regarding conversion, relocation, or installation of electric facilities: _____ Requested Work | Scope of Work | Charge Convert Overhead Service Drop to Underground—Single-Phase | Install a 4/0 secondary riser on existing pole and a secondary residential style pedestal at base of pole so customer can convert their Overhead service drop to Underground. | $2,355.00 Convert Overhead Service Drop to Underground—Three-Phase | Install a secondary 500 mcm riser on existing pole and a secondary apartment style pedestal at base of pole so customer can convert their Overhead service drop to Underground. | $3,095.00 Overhead Pole Relocation—35' Wood Pole | Relocate 35' secondary or lighting pole. Includes setting new pole, relocating existing service wire (and light if light pole) to new pole, and removing old pole. | $2,120.00 Lighting Pole Relocation—Underground (18' or 30' Pole) | Relocate 18' or 30' fiberglass lighting pole approximately 20' in an established area. Includes removing old wire, trenching 20' and installing conduit, elbows, pedestal, string and re-sodding. Relocate existing pole and pull new wire. | $2,350.00 Single-Phase Temporary Overhead Service Installation | Install temporary overhead single-phase service. Includes setting transformer on existing pole, installing 35'-4 lift pole, and 150' of 1/0 triplex, and removing all upon customer request. | $3,295.00 Single-Phase Temporary Overhead Service Installation with Existing Transformer | Install a temporary overhead service where there is existing transformer. Includes installing a 35'-4 lift pole and 150' of 1/0 triplex and removing all upon customer request. | $2,655.00 65' Antenna Pole Installation | Supply and install 65' antenna pole. | $2,115.00 Padmount Transformer Grounding | Connect communications company ground wire to city ground inside of city padmount equipment. Charge is per connection. | $125 per ground Lift Pole Installation | Install 35' wood lift pole and attach existing service wire. | $1,715.00 Conductor Marking | Install up to 8 high visibility covers (line marking) on conductors. | $225.00 New Underground within City Limits | Installation of underground to new developments per section 3.3.1 of the Electric Service Manual. | $100.00 per lot Not subject to Adjustment outlined in 21-243(c) New Underground outside of City Limits | Installation of underground to new developments per section 3.3.1 of the Electric Service Manual. | •Lots with frontage of 80' or less: $60.00 per residential lot •Lots with frontage in excess of 80 feet: $60.00 per residential lot plus $0.75 per foot for the frontage in excess of 80 feet. •Multifamily - 0—199 units: $75.00 for first unit and $15.00 per unit for each additional unit. •Multifamily - 200 or more units: $75.00 for the first unit and $12.00 per unit for each additional unit. Not subject to Adjustment outlined in 21-243(c) Underground Conversion Fee—Branch Lines outside the City Limits | Conversion of existing overhead to underground service on branch lines outside of the City limits per Section 3.3.4 of the Electric Service Manual. | •Lots with 100'—frontage or less: $100.00 per lot •Lots with frontage in excess of 100'—$100.00 per lot plus $1.00 per foot in excess of 100 feet. Not subject to Adjustment outlined in 21-243(c) (b) Additional charges. If the customer requests that work be performed that is outside the scope of the services as described in this section, the customer will be required to pay an additional charge based upon the cost of such work. (c) Adjustment. Unless otherwise noted, the charges in this section 21-243 shall be subject to the annual adjustment set forth in section 21-241.
(Ord. No. 18-O-27, § 14, 9-26-2018; Ord. No. 20-O-27, § 3, 12-9-2020)
Ask a question about Tallahassee law
Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.
