§ 21-233 — Energy cost recovery clause

Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee City Code § 21-233

Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/41710dbc-f2b0-4ce6-ab8e-b0d370437171

Sec. 21-233. - Energy cost recovery clause.

(a) Application. This energy cost recovery clause is applicable to and becomes a part of all the city's retail rate schedules. (b) Billing. The monthly bill computed under the appropriate retail rate schedule will be increased by an amount equal to the product of the monthly kwh measured or used times the energy cost recovery factor (F), determined as follows: F = (Fm/Sm) × (1 / (1 - L)) Where: (1) F = Energy cost recovery factor in dollars per kwh rounded to the nearest 0.01 cent. (2) Fm = Total applicable energy cost for the billing period. Total applicable energy cost for the billing period is: a. The estimated cost of fossil fuel consumed in the city's generating units; plus b. The estimated net cost of purchases for scheduled maintenance and the net energy cost of energy purchases, exclusive of capacity or demand charges when such energy is purchased on an economic dispatch basis to substitute for the city's own higher cost of energy; plus c. The estimated identifiable energy costs associated with energy purchased for reasons other than those identified in subsection (b)(2)b. of this section; plus d. An amount to correct for the over-recovery or under-recovery of total energy costs; such amount will be determined as the difference between energy costs billed, using estimated energy costs, and actual energy costs incurred during the prior recovery period; minus e. The estimated energy costs related to intersystem sales, including the fuel costs related to the economy energy sales and other energy sold on an economic dispatch basis. (3) Sm = Estimated net energy in kwh in the billing period equal to the sum of (i) net generation, (ii) purchases, (iii) interchange in, less (d) intersystem sales referred to in subsection (b)(2)e. of this section. (4) L = System loss factor, to be determined by the city. For residential customers receiving service pursuant to section 21-234 of this Code, the energy cost recovery factors calculated as set forth above shall be multiplied by a factor of 1.24, with respect to on-peak usage, and 0.87, with respect to off-peak usage, before being applied to the monthly kwh used. In each case, the applicable factor shall be rounded to the nearest 0.01 cents. (c) Special provisions. The energy cost recovery factor shall be determined on a projected six-month period and shall be fixed for each projected six-month period if, in the sole opinion of the city, the projected energy cost recovery factor represents a reasonable estimate of projected costs. The energy cost recovery factor may be modified if significant circumstances arise which warrant such change.

(Code 1984, § 25-36; Ord. No. 82-O-2062, § 8(34-16), 1-11-1983; Ord. No. 84-O-2279AA, § 8, 5-22-1984; Ord. No. 86-O-2589AA, § 9, 5-28-1986; Ord. No. 90-O-0078AA, § 11, 9-12-1990; Ord. No. 94-O-0028, § 9, 7-6-1994; Ord. No. 01-O-62, § 12, 1-23-2002; Ord. No. 12-O-16, § 1, 3-28-2012)