§ 5-721 — National Electrical Code—Section 701.12 amended

Code of Ordinances of the City of Lawrence, Kansas (Codified through Ordinance No. 10209, enacted April 14, 2026 (Supp. No. 4)) · Lawrence Code of Ordinances § 5-721

Corpus is an independent public-information project, not the official City of Lawrence website. Stable reference: corpuslaw.us/code/33110df5-034c-4528-9534-121de2f0a25c

Sec. 5-721. - National Electrical Code—Section 701.12 amended.

Section 701.12 of the NPFA 70, National Electrical Code, 2017 edition, is hereby amended to read as follows: 701.12 General requirements. Current supply shall be such that, in the event of failure of the normal supply to, or within, the building or group of buildings concerned, legally required standby power will be available within the time required for the application but not to exceed 60 seconds. The supply system for legally required standby purposes, in addition to the normal services to the building, shall be permitted to comprise one or more of the types of systems described in 701.12(A) through (F), unit equipment in accordance with 701.12(G) shall satisfy the applicable requirements of this article. In selecting a legally required standby source of power, consideration shall be given to the type of service to be rendered, whether of short-time duration or long duration. Consideration shall be given to the location or design, or both, of all equipment to minimize the hazards that might cause complete failure due to floods, fires, icing, and vandalism. Informational note: For further information, see ANSI/IEEE 493-2007, Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems. (A) Storage battery. Storage batteries shall be of suitable rating and capacity to supply and maintain the total load for a minimum period of 1½ hours without the voltage applied to the load falling below 87½ percent of normal. Automotive-type batteries shall not be used. An automatic battery charging means shall be provided. (B) Generator set. (1) Prime mover-driven. For a generator set driven by a prime mover acceptable to the authority having jurisdiction and sized in accordance with section 701.6, means shall be provided for automatically starting the prime mover upon failure of the normal service and for automatic transfer and operation of all required electrical circuits. A time-delay feature permitting a 15-minute setting shall be provided to avoid transfer in case of short-time re-establishment of the normal source. (2) Internal combustion engines as prime mover. Where internal combustion engines are used as the prime mover, an on-site fuel supply shall be provided with an on premises fuel supply sufficient for not less than two hours' full-demand operation of the system. Where power is needed for the operation of the fuel transfer pumps to deliver fuel to a generator set day tank, the pumps shall be connected to the legally required standby power system. (3) Dual supplies. Prime movers shall not be solely dependent on a public utility gas system for their fuel supply or municipal water supply for their cooling systems. Means shall be provided for automatically transferring one fuel supply to another where dual fuel supplies are used. Exception: Where acceptable to the authority having jurisdiction, the use of other than on-site fuels shall be permitted where there is a low probability of a simultaneous failure of both the off-site fuel delivery system and power from the outside electrical utility company. (4) Battery power. Where a storage battery is used for control or signal power or as the means of starting the prime mover, it shall be suitable for the purpose and shall be equipped with an automatic charging means independent of the generator set. (5) Outdoor generator sets. Where an outdoor housed generator set is equipped with a readily accessible disconnecting means in accordance with 445.18, and the disconnecting means is located within sight of the building or structure supplied, an additional disconnecting means shall not be required where ungrounded conductors serve or pass through the building or structure. (C) Uninterruptible power supplies. Uninterruptible power supplied used to provide power for legally required standby systems shall comply with the applicable provisions of section 701.11(A) and (B). (D) Separate service. Where approved, a separate service shall be permitted as a legally required source of standby power. This service shall be in accordance with the applicable provisions of article 230, with separate service drop or lateral or a separate set of overhead or underground service conductors sufficiently remote electrically and physically from any other service to minimize the possibility of simultaneous interruption of supply from an occurrence in another service. (E) Fuel cell system. Fuel cell systems used as a source of power for legally required standby systems shall be of suitable rating and capacity to supply and maintain the total load for not less than two hours of full-demand operation. Installation of a fuel cell system shall meet the requirements of parts II through VIII of article 692. Where a single fuel cell system serves as the normal supply for the building or group of buildings concerned, it shall not serve as the sole source of power for the legally required standby system. (F) Unit equipment. Individual unit equipment for legally required standby illumination shall consist of the following: (1) A rechargeable battery. (2) A battery charging means. (3) Provisions for one or more lamps mounted on the equipment and shall be permitted to have terminals for remote lamps. (4) A relaying device arranged to energize the lamps automatically upon failure of the supply to the unit equipment. The batteries shall be of suitable rating and capacity to supply and maintain the total lamp load associated with the unit for not less than (1) or (b): (a) For a period of 1½ hours, without the voltage falling below 87½ percent of normal voltage. (b) The unit equipment shall supply and maintain not less than 60 percent of the initial emergency illumination for a period of at least 1½ hours. Unit equipment shall be permanently fixed in place (i.e., not portable) and shall have all wiring to each unit installed in accordance with the requirements of any of the wiring methods in chapter 3. Flexible cord-and-plug connection shall be permitted, provided that the cord does not exceed 900 mm (3 feet) in length. The branch-circuit feeding the unit equipment shall be the same branch-circuit as that serving the normal lighting in the area and connected ahead of any local switches. Legally required standby luminaries (illumination fixtures) that obtain power from a unit equipment and are not part of the unit equipment shall be wired to the unit equipment by one of the wiring methods of chapter 3. Exception. In a separate and uninterrupted area supplied by a minimum of three normal lighting circuits, a separate branch-circuit for unit equipment shall be permitted if it originates from the same panelboard as that of the normal lighting circuits and is provided with a lock-on feature.

(Code 2018, § 5-421)