§ 62-80 — Procedures and standards for system extensions inside the City limits
Code of Ordinances, City of Concord, North Carolina (Supp. 53 Update 2: codified through Ordinance No. 26-83, enacted August 13, 2026 (online updated September 15, 2026)) · Concord Code of Ordinances § 62-80
Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/8b33c605-f8e0-4b4b-bdd0-d75243db9784
Sec. 62-80. - Procedures and standards for system extensions inside the City limits.
(a) Introduction . The city shall provide water and sewer service to areas incorporated within the municipal limits of the city according to the provisions of this chapter. In an effort to plan for future extensions of the Concord Utilities, the city maintains a Capital Improvement Plan (C.I.P.). The city shall endeavor to provide the extensions and services proposed in the C.I.P. if funded through the city's capital improvements budget. Consideration shall be given to each project's conformance with the Water and Sewer Authority of Cabarrus County (WSACC) "Master Plan," the adopted land use and other plans of the city, and the city's adopted annexation plan. If an extension is authorized, then all city design standards in sections 62-98 and 62-99 shall be met and the permit application process in this section shall be followed. If an extension is authorized, and a reimbursement agreement is authorized, it shall meet the requirements of section 62-12. (b) Prior to application submittal. Plats, site plans, engineering plans and specifications shall be approved through the appropriate review process, as required by the city ordinances, including chapter 62 and the Unified Development Ordinance prior to an application package submittal for water distribution system or wastewater collection system extension or modification. (c) Application requirements. (1) All persons intending to construct, alter, modify, or expand any Concord Utilities as described in section 62-79 and this section shall make timely and proper application to the City's Director of Engineering and provide such information as may be required by the Director of Engineering. At a minimum, the applicant shall: a. Provide a plan that shows the acreage of the area to be served, identifies the type of development (residential, commercial etc.), estimates the maximum potential demands that the development may impose on the existing system, and determine the adequacy of the existing system to meet those demands; b. Provide a proposed schedule for the construction of the development and any proposed development phases; c. Document the intended use of the water and sewer system extension; d. Design and install the infrastructure in accordance with the C.I.P. and/or the city's standard specifications and design standards. If the proposed extension has not been identified in a C.I.P., the design engineer shall evaluate the infrastructure's ability to adequately serve surrounding sites in the area of consideration. This evaluation shall be reviewed and approved by the Director of Engineering or his designee; e. Contract and fund the complete range of design services required for all on-site and off-site utilities. The alignment and design of the utilities shall meet the intent of a project identified in the city's standard specifications and design standards. The design shall meet the design standards of this Ordinance and shall be submitted to the city for review and approval in accordance with this chapter. Designs and alignments that do not comply with the intent of the C.I.P. and/or the city's standard specifications and design standards may be rejected regardless of project's compliance with other portions of this chapter. f. Grant to the city, at no cost, all on-site utility rights-of-way and easements deemed necessary by engineering department and Concord Utilities staff. (d) Any application package determined incomplete by the Director of Engineering shall be returned to the applicant. Revised engineering plans and specifications shall constitute a re-submittal, shall be accompanied by a new fee, and shall require additional time for review. A complete application package that contains sufficient information to ascertain reasonable grounds to believe the application package and its contents meet all applicable standards of this chapter shall be acknowledged by a letter setting a date for a pre-construction conference. No discussion at the review conference shall preclude or otherwise bar the city from denying a permit, or issuing a permit that incorporates conditions, based upon changed circumstances or information not previously known by the Director of Engineering or the applicant. In either event, no single submittal of an application package will be held open for review longer than 90 days without the issuance of a letter requesting additional information or an "authorization to construct" permit being issued following a pre-construction conference. Application packages delayed by lack of action by any person or entity other than the city shall be deemed denied and shall require re-submittal. (e) It shall be unlawful to begin the construction of a building or project infrastructure until the Director of Engineering has issued an "authorization to construct" permit, and any additional required permits have been issued by either the city, WSACC and/or the State of North Carolina, as needed and required. (f) Funding of oversized utilities. The city shall take reasonable steps to ensure that adequate funding is available to accommodate any requested oversizing or upsizing needs, as provided in section 62-82 below, however the city cannot guarantee the funding of specific proposed projects. (g) Hearings. (1) Persons entitled to a hearing. The following persons are entitled to a hearing pursuant to this section, each of whom is hereafter referred to as "aggrieved person." a. Any person whose application for a permit under this article is denied; b. Any person whose permit is issued subject to conditions that the applicant finds unacceptable; c. Any person whose permit is revoked, modified, or suspended; and d. Any person against whom the city assesses a penalty pursuant to this article. (2) Procedures for requesting a hearing. The aggrieved person shall exercise such right to a hearing by making a written demand for a hearing in accordance with this subsection. Any person making a demand for a hearing shall deliver the demand to the Director of Engineering within 30 days of the following: a. The date of issuance of the contested permit; b. The date of the notice of the denial of permit issuance; c. The date of the notice of a revocation, modification, or suspension of an issued permit; or d. The date that a penalty was assessed. (3) Content of hearing request. The written demand for a hearing must identify separately and with particularity the following: a. The aggrieved person or persons; b. The specific permit provision or condition or other issues contested to be considered; c. The reason for the objection; and d. Any alternate provisions, conditions, or terms the aggrieved person proposes. (4) Hearing procedures. a. The hearing shall be conducted by the Director of Engineering and shall be subject to such rules as have been approved by the City Council or the Director of Engineering as hereinafter set forth. b. If the demand for a hearing is not made in accordance with the provisions of this section, the Director of Engineering shall reject the demand and any right to a hearing shall be terminated. c. If any person demanding a hearing shall fail to comply with an order of the Director of Engineering or with any rules issued by the Director of Engineering or approved by the City Council concerning the conduct of the hearing, the Director of Engineering may reject the demand and any right to a hearing shall be terminated. d. Within 90 days of the receipt of the written hearing request, the Director of Engineering shall conduct a hearing and issue a final order or decision. The Director of Engineering shall transmit a copy of the final order or decision to the aggrieved person by registered or certified mail. e. The Director of Engineering is authorized to take any action which is reasonably necessary or convenient in considering a demand for a hearing and in resolving the issues raised therein so long as such action is not contrary to the provisions of this article, or other applicable law. f. The Director of Engineering may appoint a hearing officer to conduct any hearing authorized by this section. A hearing officer shall have the same authority to conduct a hearing and reach a decision as is provided to the Director of Engineering, provided that the decision of the hearing officer shall not be final, but shall be a recommended decision for consideration by the Director of Engineering. g. The Director of Engineering may approve such decision without change, reject the decision that is supported by evidence presented at the hearing, or issue a different or revised decision that is supported by evidence presented at the hearing. h. The decision of the Director of Engineering shall be final. i. A final order may provide that the action that is the basis for the demand for a hearing is approved without change or may modify such action in any manner that is supported by the evidence presented at the hearing. j. The Director of Engineering may, but is not required to, provide for any part of the hearing to be recorded by any reasonable means including, but not limited to, audio and/or video recording, stenographer, or court reporter. A transcript of any hearing, part thereof, which is recorded need not be prepared unless requested. The original of a requested transcript shall be filed with the engineering department. Each person shall bear the cost of the transcript which such person requests, including any copy thereof. k. The decision of the Director of Engineering shall be reviewable only by seeking a writ of mandamus from the superior court within 30 days of the entry of the final order set forth herein. (h) Standards for Concord Utilities extensions. The standards are divided into three categories. The categories are the standards for extensions to new developments, extensions to existing developments, and extensions to non-contiguous or satellite annexations. In any case, the city shall not participate in the cost of the water distribution mains or sewer collection mains located within the subdivision or private development property, unless upsizing is required by the city in accordance with section 62-82. (1) Standards for in-city extensions to new subdivisions and other new developments in contiguous portions of the city. a. Subject to the provisions of this article, the city shall allow extensions to and within new developments upon the request of the developer or property owner. The responsibility for and cost of such extensions to the new development may be borne by the city. The responsibility for and cost of such extension within new developments shall be borne by the requesting party, unless upsizing is required by the city in accordance with section 62-82. b. Subject to section 62-79, this section and this article, the city shall allow extensions to new developments within the city upon the request of the owner or owner's agent, and the responsibility for and cost of such extensions shall be borne by the requesting party. 1. If the city requires lines to a subdivision or other new development that are larger than those necessary to serve the project, the city shall reimburse the owner or developer for any additional material and installation costs incurred as a result of installing such oversized lines. 2. Where a proposed development of property located within the city necessitates a replacement, upgrade, or expansion in size or capacity of water and/or sewer mains and appurtenant facilities that are already available to serve the property (as opposed to an extension of a line to make service available), and the replacement, upgrade, or expansion for the proposed development cannot be constructed in the time requested by the owner or developer under the city's scheduled and budgeted C.I.P. or capital improvements budget, the city may enter into a contract with the owner or developer of such property pursuant to which the owner or developer shall pay some or all of the cost of the necessary improvements. (2) Standards for in-city extensions to new subdivisions and other new developments in non-contiguous portions of the city. The city shall allow extensions to and within new developments and/or subdivisions located in annexed property which is non-contiguous to the corporate limits upon request of the property owner or developer; and the entire cost of extending water and/or sewer line(s) shall be borne by the developer/property owner requesting such extension. The city shall pay the proportional share of installing oversized lines that may be required by the city to meet system-wide needs. (3) Standards for in-city extensions to previously developed property in contiguous portions of the city. a. The responsibility for extending water and sewer service to developed property within the city shall be borne by the city, unless the property was removed from the city's service plan at the property owner's request at the time that the property was annexed. The city shall endeavor to extend Concord Utilities to an area adjacent to an edge of the property that minimizes the customer's on-site plumbing needs; however, an extension to a specific edge of the property may not be economically or topographically feasible. The alignment of the extension shall be determined at the sole discretion of the city. b. Extensions shall generally be made only upon request of the owner of the property or properties to be served. However, the city may make extensions on its own initiative whenever the lack of service poses a threat to public health and/or safety, if service is required by N.C. General Statute and/or N.C. DEQ, or for other good and sufficient reasons.
(Ord. No. 04-17, § 1, 3-11-2004; Ord. No. 05-13, § 1, 3-10-2005; Ord. No. 05-113, § 1, 12-8-2005; Ord. No. 07-11, § 5, 2-8-2007; Ord. No. 21-19, § 1, 3-11-2021)
Ask a question about Concord law
Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.