Sec. 62-99. - Required design calculations.

The engineer shall provide the following evaluations, justifications, and calculations to the City's Engineering Department in addition to any other calculations deemed necessary to meet the requirements of all federal, state, and local requirements and to ensure that the design conforms to good engineering practice. (1) Water. The proposed extension shall be able to produce the required fire flows, including but not limited to any necessary pumping or storage throughout the proposed extension without negatively impacting the existing system. Documentation of this ability shall be submitted to the Director of Engineering for approval. The use of multiple connections to achieve the required fire flows, in lieu of upsizing the pipe, shall not be permitted. (2) Wastewater. a. The design capacity and available capacity of each of the City's sanitary sewer lines and pump stations downstream of the proposed connection point shall be evaluated. This evaluation shall include a map of the City's wastewater collection system from the proposed project location to the point where the City's system connects to WSACC's wastewater collection system. Using good engineering judgment, the design engineer shall estimate existing and potential (build out) flows using the acreage of the drainage area served and zoning information (type of allowable development) in conjunction with the daily design flows provided in the North Carolina Administrative Code. b. The diameters of downstream sanitary sewers and the capacities of downstream pump stations shall be verified. Downstream sanitary sewer lines shall have diameters equal to or greater than those upstream. If downstream sanitary sewer lines and pump stations do not have adequate capacity to accommodate the peak flow of the existing wastewater (along with the potential build out) and the estimated peak flow of the project served by the extension, then all necessary downstream sewer lines, pump stations, and appurtenances shall be upsized. The developer shall be responsible for their proportional share of the costs to increase the size of the downstream infrastructure. The costs shall be determined and or verified by the Director of Engineering or her/his designee. c. The hydraulics of the proposed manhole with the greatest slope differential (i.e., steep line entering the manhole and a flat line exiting the manhole) and the tie-in point of the existing system shall be evaluated to determine whether or not the wastewater will surcharge during peak flow conditions. d. Wastewater pump station. 1. Total dynamic head calculations for all applicable pumping conditions shall be provided. 2. The pump curve of each proposed pump shall be provided. A pump curve/system curve analysis, plotting total dynamic head versus capacity, shall be used to determine the pump selection and the operating range. System curves for the following conditions shall also be provided: system at the point of initial service (new), system at the end of service (aged), at the pump-on condition, at the pump-off condition, one pump operating, multiple pumps operating. The efficiency of the pump(s) shall be at least 40 percent throughout the operating range. 3. The number of times that the pump is activated during average daily flow and peak flow conditions shall be evaluated. The pump run time shall also be evaluated. 4. Buoyancy protection calculations shall be provided for wastewater pump stations. Flotation calculations shall assume that the elevation of the groundwater is equivalent to the ground elevation and shall not include the weight of the pumps, internal piping and appurtenances, or wastewater. 5. The available storage capacity of the wet well shall be calculated for the volume measured between the pump-off elevation and six inches from the elevation where wastewater could escape to daylight. Wastewater storage in the sanitary sewer system may not be counted toward the wet well/storage basin two hour requirement.

(Ord. No. 04-17, § 1, 3-11-2004; Ord. No. 05-113, § 7, 12-8-2005)