Sec. 62-92. - Final approval requirements and conditions.

(a) Final approval shall not be issued until the construction of the extension and/or modification to the water distribution system and the wastewater collection system have meet all the applicable rules, regulations, statutes, and ordinances of the City, the State of North Carolina, and the United States of America and the WSACC standards. (b) The engineer shall certify that the installation and the construction of any extension and/or modification to the Concord Utilities System shall meet all regulatory design standards and is in substantial compliance with the approved engineering plans and associated permits. (c) If the Director of Engineering should find that final approval should be denied, the denial shall be made in writing and shall contain each reason for the denial and the Director of Engineering's estimate of the general changes in the applicant's proposed activities or plan which will be required, in order that the applicant may obtain a final approval. Nothing in such estimate shall preclude or otherwise bar the Director of Engineering from denying final approval, which incorporates such changes, based upon changed circumstances or information not previously known by the Director of Engineering. (d) A properly executed certification, the "as-built" drawings, the "record" drawings, and the video assessment, as prescribed in section 62-88 of this article, shall be submitted to the Director of Engineering for review and shall be determined complete by the Director of Engineering before final approval is issued. (e) No construction, alteration, or expansion of the Concord Utilities System shall be placed into final service or made available for human consumption until the applicant has fully complied with all applicable federal, state, and local regulations and standards and has obtained final approval from the Director of Engineering.

(Ord. No. 04-17, § 1, 3-11-2004)