Sec. 62-83. - Pre-construction conference and issuance of permit.
(a) The developer, design engineer, and contractor or a designated representative for each shall attend the pre-construction conference. If a representative for each of the aforementioned parties is not in attendance, the pre-construction conference shall be rescheduled to a later date when each party can be represented. (b) The developer, design engineer, and contractor or a designated representative for each, shall provide copies of all applicable federal, state, and local permits, easements, rights-of-way and encroachments and the appropriate engineering drawings to the Director of Engineering for approval prior to the pre-construction conference. (c) The "authorization to construct" permit shall be issued by the Director of Engineering after all applicable federal, state and local permits, recorded easements and encroachments have been received and written approval from the Director of Engineering has been issued for the submitted engineering drawings and the developer, design engineer, and contractor or a designated representative for each has met the pre-construction conference requirements. (d) Any utility construction activity initiated prior to the receipt of a written "authorization-to-construct" permit from the Director of Engineering shall be prohibited and subject to a civil penalty of up to ten percent per day of the posted bond or letter of credit. If no bond or letter of credit has been posted, any utility construction activity initiated prior to the receipt of a written "authorization-to-construct" permit from the Director of Engineering shall be prohibited and subject to a civil penalty of up to ten percent per day of the amount of the bond or letter of credit that should have been posted if the permitting process set forth in this chapter had been followed as by law provided. (e) In the event that construction does not commence and complete within 24 months of the issuance of the permit, the permit shall expire and a new permit must be applied for and obtained by the applicant. An active permit must be maintained until full final approval has been issued for the infrastructure defined in the permit. Written requests for an extension of time received prior to expiration of the permit may be granted by the director of engineering for good cause shown. (f) The denial of the issuance of a permit, subject to the provisions in this section shall be made in writing and shall contain the reasons for the denial and the city's estimate of the general changes in the applicant's proposed activities or plan which will be required in order that the applicant may obtain a permit. Nothing in such estimate shall preclude or otherwise bar the city from denying a permit, which incorporates such changes, based upon changed circumstances or information not previously known by the Director of Engineering or the applicant. (g) Copies of all applicable federal, state, and local permits shall be submitted to the Director of Engineering prior to the City of Concord's issuance of an "authorization-to-construct" permit.
(Ord. No. 04-17, § 1, 3-11-2004; Ord. No. 05-113, § 3, 12-8-2005; Ord. No. 06-81, § 1, 8-10-2006)