Section VIII — Stormwater storage
Code of Ordinances of the City of Edmond, Oklahoma (Codified through Ordinance No. 4097, enacted August 10, 2026 (Supp. No. 40)) · Edmond Code of Ordinances tit. 23, App. - Standard Drainage Policy, Section VIII
Corpus is an independent public-information project, not the official City of Edmond website. Stable reference: corpuslaw.us/code/9b5267ed-2877-4473-99f1-ec212388251e
Section VIII. - Stormwater storage.
GENERAL: "The use of storm water storage basins in urbanizing areas does not guarantee that downstream runoff peak flows will remain below their pre-development levels for a given rainfall event." [3] "Detention basins can be used in an attempt to replicate the characteristics of natural infiltration, storage, and the attenuation of flow that is lost through urbanization. The objectives are to provide a volume of storage to compensate for that lost by development of the land, and to control the detention basin discharge so that the peak flow after urbanization remains below the pre-urban peak for a given year." 1 "Although individual detention basins can meet the design objectives, the downstream peak flow may actually increase due to the timing characteristics of the resulting runoff within the watershed. Because of this "peak timing" effect, certain areas of a watershed may be more effective than others, as basin location sites, to control downstream peaks. 1 Thus, as studies have shown, on-site detention will either increase flood peaks or decrease flood peaks at any given point in a watershed, dependent upon location of a detention facility and the physical features of the basin. LOCATION CONSIDERATIONS FOR STORMWATER STORAGE (A) Design of stormwater storage facilities shall include an analysis of the downstream effects on peak flows based upon the following drainage area criteria: (1) Residential developments including duplex and mobile home developments of 20 acres and larger shall submit a model of the stormwater storage outflow hydrograph. (2) Non-residential and all other developments, not included in (1) above, of 10 acres and larger shall submit a model of the stormwater storage outflow hydrograph. (B) Modeling of and routing of outflow hydrographs downstream shall be required under criteria above and will be accomplished through the use of HEC-1 and HEC-2 computer programs or similar models acceptable to the City Engineer. (C) The length of a stream reach requiring modeling shall be either (1) to a point where no increase in peak flow is demonstrated or (2) to a point where an increase in peak flow does not increase the depth of flooding. (D) The storm events to be modeled shall be the 2, 5, 10, 25, 50, and 100 year storm events. (E) The City shall make available all existing data on stormwater flows in its possession from sources such as Master Drainage Studies or Flood Insurance Studies (FIS). (F) In the event peak flow studies indicate a development cannot comply with the criteria stated in "C" above, then alternative methods of stormwater runoff control may be required. Alternative methods may include but not be limited to: release of larger peak flows, decrease of peak flows released, release of all or some certain storm events in lieu of detention, and/or provide channel improvements in lieu of detention. (G) The City Council shall review all stormwater storage studies and shall implement the conditions of this section of these drainage standards. DESIGN CONSIDERATIONS FOR RAINFALL AND RUNOFF STORAGE Retention and detention are two general terms relating to types of stormwater runoff storage that can be utilized to reduce the likelihood of additional flooding due to development and the subsequent change in stormwater runoff characteristics. Storage may be accomplished by the detention or retention of water in reservoirs, parks, side channels, or ponds either on or off-site. Stormwater storage shall be required where proposed development will be changing the natural state of the drainage area and subsequent stormwater runoff. However, in the event a complete drainage study by a licensed professional engineer demonstrates through that an increase in downstream flooding would occur if on-site stormwater detention was provided or that there would be no detrimental effect to all upstream, adjacent, and downstream properties if stormwater detention was not provided, the requirement for stormwater storage may be waived by the City Council. Possible conditions where stormwater storage may not be required could be as follows: 1) The lower reaches of a drainage basin where a well-defined floodplain or major water body provides potential stormwater storage needs. 2) Areas where channel improvements are existing which provide the capacity and flooding protection required for basin development. 3) Areas where the confluence of two or more tributaries of a drainage channel might produce unfavorable increases in flooding depths. 4) Changes in existing timing patterns such that peak flows are cumulative and might produce increases in flooding depths downstream. The above examples should not be considered the only cases where stormwater storage might be waived nor should the above be considered only those conditions requiring review. An engineer submitting a request to waive the stormwater storage requirement will be required to produce a detailed drainage study containing any information necessary for the City to make a determination. No limits of the extent of a study should be assumed by an engineer as none are provided. The terms, detention, retention, and sedimentation basin shall have the meanings used below: (A) DETENTION FACILITY -A surface water runoff storage facility that is normally dry but is designed to hold (detain) surface water temporarily during and immediately after a runoff event. (B) RETENTION FACILITY -A surface water runoff storage facility that normally contains (retains) a substantial volume of water to serve recreational, aesthetic, water supply, or other function. Surface water runoff is temporarily stored above the normal stage during and immediately after runoff events. (C) SEDIMENTATION BASIN -a surface water runoff storage facility intended to trap suspended solids, suspended and buoyant debris, and absorbed or absorbed potential pollutants which are carried by surface water runoff. The basin may be part of an overall multipurpose stormwater drainage system. (D) The sizing of storage facilities shall be by an approved method such as American Public Works Association (APWA) Unit Hydrograph, SCS, HEC-1, etc. All stormwater storage facilities serving drainage areas four (4) acres and larger shall be analyzed by routing an inflow hydrograph through the storage outlet structure(s). All data, calculations and assumptions shall be provided in report form. (E) The detention facility shall be designed based upon the maximum allowable release rates. The release rates will be established based upon natural state runoff characteristics from the development site. A continuous probability or recurrence interval criterion shall be used in designing the outlet control structure. As a minimum the outlet control structure shall be designed for the 2, 5, 10, 25, 50 and 100 year recurrence intervals. A single stage outlet control structure shall not be considered acceptable. (F) Rooftop storage, if used, shall be designed into the original building plans and not added to existing structures as an afterthought due to possible structural failure as well as water damage to the building contents through leakage. Such plans shall bear the seal of a registered architect or registered professional engineer. The roof should drain within twelve (12) hours. Temporary roof dams of loose gravel shall not be allowed. (G) When a combination of storage facilities are used to control runoff, the system as a whole shall be designed with discharge rates in accordance with (E) above. (H) All storage facilities shall be provided with a paved or otherwise scour-protected emergency spillway sized to handle the entire 100 year event storm and with scour protection at its downstream end. Earth embankments shall have side slopes not steeper than 4:1 (horizontally:vertically). Proper materials shall be specified with the corresponding optimum compaction according to standards to provide stability and minimum seepage. (I) The outlet to a detention pond should extend to the stormsewer, creek, or other suitable location covered by a drainage easement. (J) The engineer shall take into account the flow that would be discharged through the emergency overflow spillway during the 100 year storm event with total blockage of all other outlets of the detention pond when designing the emergency spillway, and shall provide a safe means to convey said water without adversely affecting downstream properties. (K) The storage volume of a storage facility shall be oversized 10% to allow for sedimentation. (L) All storage ponds shall be provided with a concrete paved trickle channel from the inlet to the outlet structure to transmit low flows unless the flowline of the storage facility is entirely on hard rock. (M) Erosion control for storage and/or detention facilities shall be in accordance with Section IX Erosion and Sedimentation Control. (N) A paved access road shall be provided to all storage areas for maintenance purposes. For those owned and maintained by the City, the access road shall be dedicated as part of the storage area. (O) Earth dams or other earth embankments shall be designed by a licensed professional engineer in accordance with accepted engineering practices to assure that dam or embankment failure will not occur. Design criteria used by the Natural Resources Conservation Service (NRCS), formerly the Soil Conservation Service, in the selection of materials and construction procedures will be acceptable. (P) Property line swale ponding and small on-site ponds, if used, shall be examined for possible adverse effects on building foundations due to saturation of the soil. (Q) Parking lot storage shall be considered the last alternative of providing required detention. The use of parking lots for storage shall be well designed to minimize the potential damage and/or threat to pedestrians, emergency responders and vehicles, and parked vehicles. In no case shall the depth of ponding in a parking lot exceed six inches (6"). (R) Structures adjacent to a detention and/or retention site shall have their finished floors (excluding ductwork) set at a minimum of two feet (2') above the 100 year storm event water surface elevation in the facility, and in all cases a minimum of one foot (1') of freeboard shall be provided from the finished floor of the structures to the top of the projected 100 year water surface elevation in the emergency spillway calculated under the conditions that all other outlets of the pond are blocked. (S) Public safety of the detention pond and outlet works, both in a passive condition and when functioning shall be addressed in design. (T) All detention bypass areas on the development must be identified. Increased runoff from bypass areas shall not detrimentally affect adjacent and downstream properties. (U) The detention facility shall be designed as a visual amenity consistent with the existing topography and proposed development and should be designed with multi-use potentials related to recreation taken into consideration. The use of large unnatural depressions which disrupt the continuity of the landscape shall be avoided. Length to width ratios should be investigated in relation to depth of the proposed facility to improve the aesthetic appearance of storage facilities. The geometric layout of detention facilities shall be such that multi-purpose use is available. All storage facilities shall be provided with landscaping which includes the planting of appropriate trees and shrubs. The use of evergreen and wetlands adaptable plantings should be incorporated to improve the water quality of the storage runoff. Outlet control facilities shall include headwalls, slopewalls, energy dissipaters, and any additional outlet erosion and scour control measures approved by the City Engineer. The outlet facilities, as a visible part of any storage facility, shall include landscape plantings to improve aesthetics and provide a more pleasant and appealing appearance. Detention facilities which are planned for dedication to the City shall be reviewed by the Parks and Recreation Department for proper recreational layout and design. Landscaping of all facilities including access roads and parking areas (storage facilities 3 acres and larger) shall be of sufficient size and number to provide a park-like setting.
Ask a question about Edmond law
Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.
