Section VI. - Sump position flood protection.
PURPOSE: The following criteria shall be used to help prevent the flooding of structures situated adjacent to sump positions. DESIGN CRITERIA (A) In a location where the stormsewer improvements already have been constructed, the structure shall have its minimum finished floor including electrical and mechanical equipment servicing the structure, but excluding ductwork, 2' above the highest elevation of either the top of the curb elevation at the sump inlets or flume or 2' above the top of the curb elevation of the overflow flume at its entrance. A FEMA Elevation Certificate demonstrating compliance with this requirement shall be required prior to the issuance of a Temporary Certificate of Occupancy or a Certificate of Occupancy. A proposed structure with a basement or walk-out will be reviewed by the City Engineer to determine if the minimum finished floor requirement shall apply to it; the decision shall be based on the proposed building plans, site plan, location of the sump position, and the likelihood of flooding. In lieu of this subsection, subsection (B) shall be allowed: (B) If the builder so chooses, he shall provide to the City a hydrologic and hydraulic drainage study and model prepared by a registered professional engineer licensed to practice in the State of Oklahoma using HEC-RAS or other program acceptable by the City Engineer. The model shall be based on surveyed data accompanied by a proposed grading plan, proposed site plan, and any proposed drainage structures or alterations of existing structures. The model shall demonstrate that even though the proposed structure would not be compliant with the minimum finished floor elevation required in (A) above, the following design criteria shall be met: 1. The proposed structure shall have at least 2' of freeboard on all sides from the 100 year storm event water surface elevation on and/or immediately adjacent to the lot and the proposed finished floor of the structure including all mechanical and electrical equipment servicing the structure, but excluding ductwork. A proposed structure with a basement or walk-out shall be reviewed by the City Engineer to determine if the 2' freeboard requirement shall apply to it; the decision shall be based on the proposed building plans, site plan, location of the sump position, and the likelihood of flooding. 2. At no location would the 100 year storm event flood water come in contact with the proposed structure or its mechanical and electrical equipment. 3. This modeling shall be done with runoff quantities calculated as specified in Section II under the conditions that all of the upstream inlets and grates are partially clogged as per the design criteria in Section IV, while any existing inlets and/or grates at the sump position are totally clogged. The model shall demonstrate where and at what depth the flow overtops any curbs and the flowpath(s) the runoff will take via flumes, swales, and overland in the vicinity of the property. Flow velocities also shall be provided. If the above are adequately demonstrated, the City Engineer shall be allowed to approve the building of the proposed structure in accordance with the submitted model and plans. The City Engineer may require a drainage easement or other remedies to help ensure that the structure shall be safe from flooding. The City Engineer may schedule the item for discussion at a Stormwater Drainage Advisory Board Meeting. Before the issuance of a Temporary Certificate of Occupancy or Certificate of Occupancy, the following shall be required: 1. Certified surveyed as-built plans of the structure, grading, and all required drainage structure alterations or improvements to demonstrate compliance with the model shall be submitted to the City and approved, and 2. The submittal and acceptance of a FEMA Elevation Certificate demonstrating compliance with the model, and 3. Any other requirements placed upon the Building Permit by the City Engineer such as drainage easements shall be met. (C) For new developments and site plans, the sump position locations shall be designed so that when all upstream inlets and grates are partially clogged per the design criteria in Section IV, the sump position inlets and/or grates, or flume if no stormsewer is present, shall handle the 100 year storm event without exceeding depth-in-street design criteria. Clogging factors shall be applied to the sump position inlets and/or grates during their design. All flume entrances shall have sufficient weir length. In addition, an emergency overflow flume shall be provided for sump position inlets and/or grates. The overflow flume shall be sized to handle the 100 year storm event under the conditions that the existing inlets and/or grates at the sump position are 100% blocked and all upstream inlets and grates are partially clogged per design standards. The flume entrance shall have sufficient weir length to capture this flow and the flow shall remain within the flume to the back of the lot(s). A sufficiently sized drainage easement, minimum 15', shall be provided. Certified surveyed as-builts shall be provided to document that the streets, stormsewer, and flume(s) in this drainage basin were constructed in accordance with the approved plans and drainage study and function in accordance with Tile 23 and STD-400. If all of the above conditions are met, a proposed structure in a sump position shall be built as follows: 1. Where a stormsewer system with the emergency overflow flume exists, a minimum of 1' of freeboard shall be required from the finished floor of the structure's leading edge closest to the sump position to the top of the flume curb immediately adjacent to it. 2. Where a flume serves as the primary method of stormwater conveyance, a minimum of 2' of freeboard shall be required from the finished floor of the structure's leading edge closest to the sump position to the top of the flume curb immediately adjacent to it. In both situations, the electrical and mechanical equipment servicing the structure shall conform to the freeboard requirement; the ductwork is excluded. A proposed structure with a basement or walk-out will be reviewed by the City Engineer to determine if the freeboard requirement shall apply to it; the decision shall be based on the proposed building plans, site plan, location of the sump position, and the likelihood of flooding. A FEMA Elevation Certificate shall be required before issuance of the Certificate of Occupancy. The developer is encouraged to submit as-built survey data and corresponding drainage calculations to the City upon completion of the development's infrastructure as soon as possible so that the Staff can verify that the sump positions meet the Title 23 and STD-400 design criteria. By doing so, delays in issuing Building Permits at these sump positions will be minimized. (D) For rural paving section developments or site plans, the applicant for a proposed sump position structure shall submit to the City a proposed grading plan signed and sealed by a registered professional engineer licensed to practice in the State of Oklahoma. The grading plan shall include the proposed site plan including driveway, topographic data, bar ditches, channels, swales, creeks, easements, proposed grading, proposed swales, minimum finished floor elevations, and any additional drainage improvements required to ensure that the structure shall be safe from flooding. The City Engineer may require additional information, modifications, drainage studies, modeling using HEC-RAS or other computer programs, and/or place conditions on the Building Permit based on the proposed structure's likelihood to flood. Before issuance of the Temporary Certificate of Occupancy or Certificate of Occupancy, the applicant shall provide a signed and sealed letter from the design engineer stating that the finished site conforms with the approved grading plan and that all proposed improvements have been constructed. A FEMA Elevation Certificate and/or an "as-built" survey of the property may be required based on the grading plan. (E) Design engineers are strongly encouraged to design the street sump positions so that these areas are cut into the existing grade of the land. Utilizing the natural topography in this manner will yield naturally higher lots adjacent to the sump position flumes, will provide excavation material that may be used to elevate these adjacent lots to help meet finished floor requirements, and will result in a more aesthetically pleasing elevation relationship among the residences along the block.
Ask a question about Edmond law
Corpus searches the Edmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.