16.16.010 - Administration.
A. Consultant Selection Procedures. 1. Requests for Proposals. Consultants shall be selected on the basis of their qualifications. For major projects, the city shall prepare a "request for proposals" (RFP) and shall advertise for services. The RFP shall be in the general format published in the "city of Casper standard specifications for public works construction and infrastructure improvements." The RFP shall include the items listed in the standard format and other information pertinent to the project such as: a description of the project, the scope of services required, qualification criteria, selection process, etc. 2. Interviews. Typically, three to five consultants submitting the best proposals, in the opinion of the selection committee, will be interviewed by a selection committee prior to selection of the consultant for the project. 3. Contract. The selected consultant shall execute a contract with the city in the format of the city of Casper standard contract for professional services, published in the project, including Part II—General Terms and Conditions. B. Local Assessment Districts. 1. Local Assessment Districts (LADs). A copy of the city of Casper "Procedure for Creating a Local Assessment District in Casper, Wyoming" may be obtained from the city of Casper engineering office. 2. Consultants for an LAD project shall provide services for developing property assessments, mailings, ownership investigations, holding public meetings, preparing public service announcements, etc., as necessary. C. Wyoming Department of Transportation (WYDOT). 1. "E-54 License." An "E-54 License" must be obtained from WYDOT prior to installation of utilities within state highway rights-of-way. If the utility will ultimately belong to the city, even if it is constructed as part of a private subdivision for later acceptance by the city, the license must be obtained in the name of the city. The consultant for the project shall prepare the required application and exhibits and submit them to the city of Casper engineering office for review and approval prior to submitting them to WYDOT. This should be done early in the design process to avoid delay of construction due to the time required to obtain the license. 2. Access Permits. Access approaches proposed for connection to state of Wyoming highways must be authorized by WYDOT with an "access permit" in the name of the entity that will own the access when it is completed. In the case of a subdivision street to be owned and maintained by the city, the consultant for the project shall prepare the required application and exhibits and submit them to the city of Casper engineering office for review and approval, prior to submitting them to WYDOT. This should be done early in the design process to avoid delay of construction due to the time required to obtain the permit. 3. Other Considerations. Developments that will affect the traffic flow, stormwater discharge or other aspects of a state highway right-of-way must be reviewed with WYDOT. Related studies and reports may be required. D. Public Notifications. 1. During the preliminary study and design periods, consultants shall be responsible for preparing mailing lists, public service announcements, conducting public information meetings, etc., as necessary, to inform the public and interested parties of proposed projects. Consultant shall solicit, compile and share with the owner public comments regarding the project. Consultant shall consult with the city of Casper to determine the level of public notification desired for the project. 2. Consultant shall include, in the bidding and construction documents, requirements for the successful contractor to provide public notifications throughout the project to keep the public informed of project progress, road closures or other activities that may inconvenience the public. E. Oversizing. The city of Casper will compensate developers for utility and street oversizing required in excess of the sizes needed for their project in accordance with Chapter 16.19 of the Casper Municipal Code. Consultant shall be responsible for documentation necessary to determine the oversizing cost in accordance with city policy. F. Land Acquisition and Easements. For projects requiring land acquisition for street rights-of-way, utility easements or other purposes, consultant shall prepare easements, deeds and related exhibits. As required in accordance to city requirements, consultant shall obtain ownership and encumbrance reports for all land acquisitions and easements. Owner may obtain the services of realtors or other specialists for services during purchase negotiations. G. Subdivision Permit to Construct. A permit to construct is required for off-site improvements for subdivisions. Applications are available at the office of the city engineer.
(Ord. 2-06 (part), 2006)
Ask a question about Casper law
Corpus searches the Casper sections it holds and shows the ones that match, with their citations. Free, no sign-in.