16.16.020 - General engineering principles for Casper streets and utilities.

A. General. 1. In compliance with state statutes, designs, plans, and specifications submitted for approval shall be prepared by a registered professional engineer licensed to practice in the state of Wyoming. All plans and specifications submitted shall carry the seal or signature of the design engineer in accordance with W.S. Sections 33-29-101 through 33-29-113. 2. Provisions Deemed Minimum Standards. These design standards shall be held to be the minimum standards, except when waived by the city engineer, Casper planning commission (commission) or Casper city council (council), as applicable. 3. Conformity to Master Plan. Proposed subdivisions and engineering designs shall substantially conform to the adopted master plans such as the city's water and sewer master plan, city of Casper comprehensive land use plan, city of Casper stormwater management master plan, and city of Casper long range transportation plan. These master plans can be found on file with the public services department and the community development office. B. Block Length. Residential block lengths shall not exceed seven hundred fifty feet in length. The city council may approve block lengths greater than seven hundred fifty feet when justified by topography, or if shorter block lengths are not practical because of impediments such as parks, railroads or other existing physical features. When block lengths exceed five hundred feet in length, pedestrian ways (trails) may be required near the center of the block to provide for pedestrian connectivity. Such pedestrian ways shall lay within a minimum of a fifteen foot public access easement and shall have a minimum paved width of eight feet. Said pedestrian way shall be constructed in compliance with established City of Casper construction standards. C. Lots. 1. Residential lots, and other lots, where applicable, shall be arranged to afford the best possible view, privacy, orientation for solar energy and air, safety, and utilization of natural features. Lot arrangements shall achieve local character and good appearance. 2. The minimum area for all lots shall not be less than that required by the zoning ordinance for the specific district. 3. All lots shall have frontage on a dedicated public street or a dedicated public access easement, meeting minimum city size and construction requirements for ingress and egress, and providing continuous access to a public street. For all newly platted or replatted lots, the required lot frontage shall meet all minimum code requirements, including, but not limited to, minimum lot width, size and access requirements. 4. Side lot lines shall be substantially at right angles to straight street lines or radial to curved street lines. In residential areas, the depth of a lot shall not exceed one hundred forty feet. 5. Lots deemed by the city to be subject to flooding by the flood insurance study prepared by the Federal Emergency Management Agency dated July, 2004, or any updates to the study, shall neither be developed for residential occupancy or for such other uses as may endanger health, life or property, or aggravate the flood hazard, unless in compliance with the requirements outlined in the flood control district of the city's zoning ordinance. 6. Residential lots shall not front (access) onto arterial or collector streets without approval of the planning commission. 7. Double frontage lots shall be prohibited unless it is unavoidable due to existing or proposed arterial and collector roadway alignments. 8. All lots abutting arterial streets shall have a six-foot-high solid fence or wall constructed by the developer on the property lines abutting the right-of-way, unless this requirement is waived by the Casper city council during the plat or replat review process. D. Street Requirements Generally. The arrangement, character, extent, width, grade and location of streets shall conform to the official street map, the city's long range transportation plan and the comprehensive land use plan adopted guide for growth related to existing and planned streets, topography, to public convenience and safety. E. Continuation of Existing Streets. Streets or utility rights-of-way in new subdivisions shall make provision for the continuation and connectivity of existing streets and rights-of-way in adjoining areas. F. Street Names. When streets are in alignment with existing streets, the new streets shall be named according to the existing streets with which they correspond. Streets which do not fit into the established street-naming pattern shall be named in a manner which will not duplicate or be confused with existing street names. G. Street Signs. Prior to the issuance of a building permit, the owner shall pay to the city a fee established by resolution, by the council for each street sign required for the subdivision. Such street signs will be installed by the city. H. House Numbers. House numbers will be assigned by the city in accordance with the house numbering system in effect in the city at the time house numbers are assigned. House numbers shall not be shown on the subdivision plat. I. Easements for Drainage and Utilities. 1. Easements with a right-of-way width of ten feet shall be provided on each side of all rear lot lines and along certain side lot lines where necessary for utilities. During initial construction of utilities, there shall be a twelve-foot temporary utility easement adjacent to and on both sides of all permanent easements. 2. Where a subdivision is traversed by a watercourse, natural drainage channel or stream, there shall be provided a drainage easement of sufficient width for surface or subsurface drainage, as approved by the city engineer and planning director. This drainage easement for surface or subsurface drainage should conform substantially with the existing lines of the watercourse and stormwater management master plan. 3. All distribution facilities providing utility services to a proposed subdivision, including, but not limited to, water, sewer, natural gas, electric power, telephone or telegraph, and cable television, shall be buried within the easements provided on the plat, excepting those facilities, as approved by the city engineer to be placed above ground. This section shall not apply to existing distribution facilities that were constructed outside the city limits and which are now proposed to be annexed. Plans and designs for the burial of such utility services shall be submitted to and receive the approval of the city engineer, prior to their installation. 4. In residential areas, all gas meters shall be located behind the front building line adjacent to the side lot line, except where an alley is available, in which case all utilities should be located in the alley. No aboveground utility service facilities (gas, telephone, power or cable television) shall be located in the front yard without the approval of the planning director and city engineer. 5. The minimum easement width for storm sewers shall be the greater of: twenty feet, or eighteen feet, plus the diameter of the largest pipe. Easements containing storm sewer, sanitary sewer and/or water lines must have a minimum width that is adequate to provide for a ten-foot separation between pipelines and allow ten feet from the centerline of the outside pipes to the easement boundary. J. Townhouse and PUD Developments. 1. For developments of twenty residential units or less, the city will accept dedicated public roadways in planned unit developments (PUD) or cluster-type (townhouse) developments, and maintain the same, provided that the minimum right-of-way width provided is thirty-four feet with two two-foot, six-inch curb and gutters and a twenty-four-foot minimum paving width, constructed to city standards and approved by the city engineer. For developments with over twenty residential units or for commercial uses, public street right-of-way and streets shall be developed to regular city standards. 2. If individual lots are to be sold, planned unit developments of cluster-type housing shall be designed and platted in such a manner that each platted lot will abut and have access to a dedicated public street, or have adequate access and utility easement providing for ingress, egress and necessary municipal services, as well as meet the minimum criteria set forth in subsection I of this section. 3. Private drives will be permitted in a PUD, provided that the following conditions are met: a. No cul-de-sac shall exceed six hundred feet in length. b. No private drive shall be aligned to connect to a public dedicated street in such a manner that will encourage the private drive to be utilized as a public street. 4. The city shall have no responsibility for operation and maintenance of water and sewer mains in private streets located within PUD or cluster-type developments, unless some level of responsibility is established through a subdivision agreement. 5. Individual (separate) water service lines and water meters will be required for each unit in a PUD or cluster-type development, regardless of operation and maintenance responsibilities for water lines within the development. Water service lines may be connected together into one service line extending to a water main, if each service line has its own curb stop installed in a street or right-of-way granted to the city for access, and a curb stop exists on the one service line extending to the main. The city's responsibility for operation and maintenance will terminate at the curb stop located on the one service line extending to the main. 6. Separate sewer service lines will not be required for each unit in a PUD or cluster-type development if a homeowner's association exists within the development which is responsible for operation and maintenance of all sewer service lines to a main located in a public street. 7. All water and sewer service lines serving individual units, regardless of operation and maintenance responsibilities, must be located in dedicated utility easements. 8. Connection charge fees will be assessed in a similar manner for both townhouses and condominiums. Connection charge fees will be assessed, as determined by Casper public utility staff and approved by the council. 9. If lots are to be sold individually in a PUD or other zoning district as townhouses, each lot must be platted in accordance with city requirements. K. Intersections. 1. A maximum of four approaches is allowed at any intersection. 2. Colored concrete crosswalks shall be installed only at signalized intersections. 3. ADA ramps shall be provided at all corners of all intersections. a. New and Retrofit Collector and Arterial Streets. All new arterial streets shall have colored ADA ramps. The ramp color shall be a red or brick red color, as approved of by the city engineer. A detectable warning mat with truncated domes shall be installed on top of the colored ADA ramps. The location of the mat shall be in accordance with federal regulations and the installation shall meet the manufacturer's recommendations. b. New Residential and Collector Street Construction. All new residential and collector street intersections shall be equipped with ADA ramps. ADA ramps for these intersections need not have colored concrete. A detectable warning mat with truncated domes shall be installed on top of the ADA ramps. The location of the mat shall be in accordance with federal regulations and the installation shall meet the manufacturer's recommendations. c. A separate ADA ramp shall be provided for each street crossing, except single corner ramps will be allowed under special circumstances when approved by the city engineer. L. Street Curve Restrictions. Deflections in street segments shall be connected by a horizontal curve having a sufficient radius to insure adequate sight distance, as determined by the city engineer. M. Frontage Roads Near Arterials. Where a subdivision abuts an existing or proposed arterial street, the city may require a frontage road to protect residential properties and separate through and local traffic. O. Streets Bordering Railroads. Where a subdivision borders railroad right-of-way, the city may require a street on each side and approximately parallel to the right-of-way. The distance between the railroad right-of-way and the street shall be suitable for the appropriate use of intervening lands and shall be determined with regard to the requirements of proper approach grades and future grade separation. P. Half Streets. Half streets are prohibited unless this provision is waived by council. Q. Dead-End Streets and Cul-De-Sacs. Dead-end streets or cul-de-sacs shall be less than six hundred feet in total length. The closed end of any permanent or temporary dead-end street or cul-de-sac shall have a turnaround having a right-of-way radius of fifty feet. The turnaround at temporary dead-end streets shall be maintained until such time the street is extended. Turnarounds shall be provided on property owned by the owner of the subdivision. R. Alleys. 1. Alleys shall be provided in commercial, business, and industrial zones. The city may waive this requirement where other provisions are made for service access, off-street loading and unloading, parking and installation of public utilities. 2. Dead-end alleys are not permitted. Council may waive this requirement if a dead-end alley is unavoidable due to topography or other existing natural conditions and if an adequate turnaround is provided. S. Sidewalks, Curbs and Gutters, Curbwalks. 1. General Requirements. All street sections within the city shall include curb and gutter, curb and gutter with sidewalk or curbwalk in accordance with the street design guidelines unless otherwise determined by the planning commission and council. At minimum, curb and gutter is required on all streets. a. Residential Areas. Curb and gutter with sidewalk or curbwalk shall be required on both sides of local and collector streets, except as follows: i. Sidewalks are not required on either side of the street where lot density development is less than 0.75 dwelling units per acre; ii. Sidewalks are required on only one side of the street or cul-de-sac where lot density development is between 0.76 and two dwelling units per acre; iii. As otherwise determined by the commission and council. b. Commercial Areas. Curb and gutter with sidewalk or curbwalk shall be required on both sides of the street in all commercial areas, except when the requirement is waived by the commission and council. c. Industrial Areas. Curb and gutter is required on both sides of streets. Sidewalks are not required, except as determined by the commission and council. U. Infrastructure Design. 1. Investigations. a. Geotechnical Requirements. A geotechnical investigation of the project site shall be provided. Borings, sampling, and testing shall be performed in accordance with the applicable ASTM standards. Recommendations for suitability of the soil conditions for the proposed construction, including recommendations on trench excavations and backfill, shall be provided based on the information obtained from the soil borings and sampling. i. Underground Utility Construction. At a minimum, perform one test boring per block. ii. Roadway Construction. Perform soil sampling, as necessary for pavement design. iii. Sampling tests and/or procedures and the associated report shall address the following items: (A) Engineering properties, including moisture content, Atterburg limits, sieve analyses, and blow counts per foot; (B) Soil profile logs covering pavement thickness and soil types encountered to the depth of the borings; (C) Groundwater depth determination, if encountered; (D) Include soil boring locations on the project design drawings; (E) Classification of subgrade materials under the Unified Soil Classification (USC) system; (F) Soil samples from each test boring shall be screened for volatile organic compounds (VOC) using a photoionization detector (PID). The PID shall be performed on samples from the boring exhibiting the highest potential for VOC contamination. In the event PID testing and/or visual observations of soil boring material indicates the presence of contamination, after discussion with city staff, soil samples shall be screened for gasoline and diesel range organic compounds using DRO/GRO testing procedures to further define the soil contamination. b. Underground Facilities. i. Comply with Wyoming State Statutes Title 37 for requirements regarding underground facilities. In particular, comply with "any person requiring excavation or design for excavation shall obtain information from persons with underground facilities, as to the nature, location, and depth if known, of underground facilities. If the information is not available, the person requiring excavation shall determine at their expense the nature and location of the underground facilities. The person requiring excavation shall make the information and location a part of the plan by which the excavators operate." ii. Private utility companies shall be contacted (i.e., telephone, power, cable television, gas, etc.) to obtain location of their utilities on the project and to coordinate any required adjustments. iii. Site plans shall include all existing utilities; utilities to be removed, abandoned or relocated; and all proposed utilities. Utilities include water, sewer, gas, phone, cable television, electric power, etc., that may exist or be desired. All potential conflicts shall be addressed. c. Traffic Studies. A traffic study shall be required for any development that will produce seventy-five or more vehicle trips per peak hour. The city of Casper engineering office will arrange for a traffic study to be prepared. The cost of the study will be borne by the developer. The traffic study shall include the requirements, as outlined in Chapter 16.20, Preliminary Plats, of this title. d. Stormwater Management. i. All site and subdivision plans shall include information on proposed drainage features, including final contours, paved area, landscaped area, building area, location of roof drain outlets, gutters, swales, catch basins, storm drain piping, etc. ii. When required by the city engineer for sites under ten thousand square feet, and for all sites over ten thousand square feet, a drainage study prepared in accordance with the city of Casper Storm Water Management Design Manual by a professional engineer registered in the state of Wyoming shall be prepared. All design criteria and assumptions shall follow the policies set forth in the design manual. iii. Sanitary Sewer System Study. Prepare a sanitary sewer system study for the proposed project and the existing system to the extent required by the city engineer or the city of Casper public utilities manager. Modeling of the system shall be performed if requested. iv. Water Distribution System Study. Prepare a water distribution study for the proposed project and the existing system to the extent required by the city engineer or the city of Casper public utilities manager. Modeling of the system may be required to demonstrate adequate fire flows. V. Survey Requirements. 1. General. a. Provide all necessary survey required for the proposed work. All engineering surveys required for the planning, design, and construction of infrastructure and appurtenances, including detailed layout and staking for installation, shall be the responsibility of the person, firm, or corporation requesting or receiving the permit to construct. Such surveys shall be made or performed by a professional engineer or land surveyor licensed to practice in the state. 2. Datum. All elevations shown on plans or drawings, or referred to in the specifications, shall be referenced to NAVD 88 (GEOID12A) as established by the National Geodetic Survey. 3. Survey data shall be compatible with the city GIS and CAD infrastructures, all data must be horizontally referenced to NAD 83(2011) Wyoming State Plane East Central Zone, U.S. survey feet. 4. Each digital submission shall show at least four corners with the state plane coordinates (x, y and z) in NAD 83 datum. The convergence angle and combination factor shall be shown on all final drawings. W. Project Signage. All projects being financed with any optional sales tax funding shall have advertising signs installed at prominent locations. This needs to be accomplished the first week of construction. Signs will be four feet by eight feet in size and furnished by city to contractor. Contractor shall furnish posts, hardware and installation. Consultant shall include this information in the bidding documents. X. Public Service Announcements. Contractor shall provide for public service announcements for infrastructure improvements and other projects that are anticipated to inconvenience the public in any way for a time period longer than one day. The extent and content of public service announcements will vary with the project. Consultant shall consult with city staff to determine bidding document content. Y. Aesthetics. 1. Electrical Services. a. Consideration shall be given to the aesthetic elements of construction projects, including electrical service equipment. The replacement of such items shall be coordinated with city staff and the electric company. Specific concerns are: i. No meter cans shall be placed on poles; ii. Meter placement shall be at least three feet from the pole; iii. Electric company access to the meter shall be of primary importance; iv. The city of Casper electrical inspector must approve any code issues involved; v. The city must closely coordinate the work of electrical subcontractors for nonelectrical utility construction. b. Prior to construction, such details as electrical drop views and equipment locations shall be submitted to the city engineering office for approval. 2. Colored concrete shall be used for crosswalk paving, ADA ramps and other features, as directed by the city on a case-by-case basis. Typically, the colored concrete crosswalks are used only at signalized intersections. Dye for colored concrete shall be specified as solomon colors or approved equal as follows: a. Crosswalks and ADA ramps: i. Option 1, Standard for Second Street—No. 492 maroon at the rate of twenty-five lbs. per one cubic yard of concrete, ii. Option 2, Standard for Arterials and Collectors Other Than Second Street—No. 492 or No. 775 mohawk orange at the rate of twenty-five lbs. per one cubic yard of concrete; b. Special paving: No. 492 maroon or No. 775 mohawk orange at the rate of twenty-five lbs. per one cubic yard of concrete; c. Concrete pillars for railings: No. 288 buff at the rate of twenty-five lbs. per four cubic yards of concrete; d. Culvert wing walls and retaining walls: No. 288 buff at the rate of twenty-five lbs. per four cubic yards of concrete. 3. Brick pavers may be used at various locations at the direction of the city. a. Brick pavers colors shall be as described in the city of Casper downtown streetscape standards, latest edition. The brick specifications shall include the following: i. Brick shall be free of cracks or other imperfections detracting from the appearance of a designated sample when viewed from a distance of fifteen feet. Parts of the brick that will be exposed in place shall be free of chips. ii. Size shall be a standard of 7.62 inches long, 3.81 inches wide, 2.25 inches deep. iii. Due to the variation of colors produced during manufacturing, samples of the batch(es) of brick proposed for use shall be submitted for approval, prior to installation. Samples consisting of full-size units (minimum number of six) for each color and texture showing full range of variations expected in these characteristics shall be submitted to the city for approval. iv. If other manufacturer's products are approved as equal, the contractor shall be responsible to submit and to calculate any and all modifications to installation details, dimensions of areas to receive brick and other information, as may be requested by the city engineer or as may be required due to variations in brick size or other factors. v. Brick materials shall be solid brick pavers, complying with ASTM C902, Weather Class SX, Traffic Type 1, application PX with an average absorption rate of four percent, abrasion index of Type 1, a maximum saturation coefficient of 0.85, and a modulus rupture of 1.45 ksi. Approved brick manufacturer Boral Brick, "bourbon" or approved equal. Z. Construction Traffic Control. For projects where traffic control is anticipated to be necessary during construction, consultant shall include specifications and provision for payment for traffic control in the bidding/construction documents. Contractors must submit traffic control plans and obtain traffic control permits from the city engineer's office prior to start of work. All traffic control shall comply with the Manual on Uniform Traffic Control Devices, latest edition (MUTCD). AA. Stormwater Phase II Regulations, Erosion Control Plans and Bonds. 1. Consultant shall comply with provisions of Chapter 12.20, Erosion and Sediment Control, of the Casper Municipal Code for preparation of stormwater Phase II regulations, erosion control plans and specifications. These plans shall comply with the city of Casper and the Wyoming Department of Environmental Quality stormwater Phase II regulations. 2. Consultant shall include in the construction documents the information for the required erosion control bond. Contractors are required to submit an erosion control plan and post a bond prior to beginning any earthwork that disturbs the soil surface and creates the potential for water or wind erosion. Contractors shall be responsible for installing and maintaining erosion control measures and preventing erosion. 3. Erosion control plans and specifications shall be submitted for approval as part of the construction documents. BB. Oversizing. Construction of streets of greater width, or water or sewer piping in excess of the size required for the development or in excess of the minimum required size may be required. Consult the applicable city of Casper master plans and with engineering and public utilities staff to identify oversizing requirements. The city of Casper will reimburse the developer/contractor for the cost in excess of that required for the development or minimum sizes as appropriate in accordance with Chapter 16.19 of the Casper Municipal Code. CC. ADA Requirements. All new infrastructure projects shall incorporate American with Disabilities Act features in accordance with federal requirements and the requirements of the city of Casper standard specifications for public works construction and infrastructure improvements. DD. Documents. 1. General. Construction documents shall consist of drawings representative of the work to be performed, general and special provisions, and technical specifications. The city will leverage the increased use of digital mapping in public and private organization[s] to facilitate the development of more efficient and accurate digital records. In addition to standard paper documents, the owner/contractor/engineer/developer will submit digital drawings of all subdivisions, site construction, building construction or other construction that modifies existing utility or transportation infrastructure or includes the addition of aforementioned infrastructure. To expedite the review of submissions, the city requests applicable digital data be delivered in computer aided design (CAD) and geographic information system (GIS) formats as described in the below requirements. To obtain a copy of the GIS data or CAD (DWS or DWT) templates contact the city engineering or GIS departments. 2. Construction Documents. a. Construction drawings shall contain sufficient detail and information to determine construction costs and to construct the improvements. Standard drawing sheet size shall be thirty-four inches by twenty-two inches. "Half size" (seventeen inches by eleven inches) plan sheets may be used, provided all information on the drawings is legible. b. Plan and profile sheets shall have a horizontal scale not less than one inch equals fifty feet, and an appropriate vertical scale. Drawings shall accurately represent the extent of infrastructure improvements and appurtenances (e.g., service lines and manholes) and utility conflict locations. c. Plan information shall include street alignment; parcel lines; right-of-way; proposed back of sidewalk, street centerline; curb and gutter or curbwalk, demolition and salvage; proposed alignments of water lines and sewer lines; existing underground utilities; length and grade of pipes; pipe material and size; location of manholes, valves, and fire hydrants; pavement rehabilitation; and any other work relevant to the project. d. Profile information shall include estimated depths of existing underground utilities and alignments of proposed utilities. Proposed underground utilities shall include grades, stationing, and lengths. e. Preliminary, final, and record drawings shall be in computer-aided drafting format. Digital format shall be compatible with the city's CAD system. f. Two copies of the "draft" construction drawings and project manuals shall be submitted to city engineering office staff for review. g. A traffic control plan in construction drawings, at an appropriate scale shall be included. The plan shall depict phased construction of the project to minimize inconvenience to local traffic and homeowners, as necessary. 3. Project Manual. a. Bidding and Contract Documents. i. City of Casper standard forms for bidding documents, agreement, bonds, etc., shall be used. Consultant shall recommend project specific modifications for preparation by the city. ii. Consultant shall provide bid schedules and measurement and payment requirements appropriate for the project. iii. Consultant shall provide general provisions and special provisions sections specific for the project. The city format or consultant's format may be used. b. Specifications. i. Specifications covering the materials and requirements of construction shall be submitted with the plans when presented for approval. City of Casper "standard specifications" shall be used supplemented by special provisions or CSI format technical specifications, as appropriate to the particular project. ii. Special time lines, phasing requirements and dates for partial substantial completion that will trigger liquidated damages shall be clearly explained in the special provisions and referenced in the agreement. c. Warranty. Special warranty requirements shall be included in the construction documents, as appropriate. Describe requirements for start of warranty, duration of warranty and requirements for acceptance by the city of Casper, where applicable. 4. Construction. a. Construction Observation. All construction of infrastructure and appurtenances covered within the scope of these standards shall be observed for compliance with the standards, and for conformance with the approved plans and specifications. b. If the work is performed by a developer's contractor, the developer's engineer shall provide a competent resident project representative (RPR) for the work, and all required inspection and testing shall be coordinated through such RPR. Materials installed, or work performed not in compliance with the approved plans and specifications, shall be removed, replaced, or made acceptable, before the construction will be accepted by the city of Casper. The developer and the developer's engineer shall certify in writing on the form provided by the city of Casper, that all work has been completed in compliance with its approved plans and specifications, before acceptance and start of the warranty period. c. Consultant's RPR shall at all times maintain a copy of the project specifications and a redline set of as-built record drawings on-site available for reference. d. RPR shall maintain a daily log of construction activities, weather conditions, personnel and equipment used on the project. Any out of scope emergency work shall be monitored and logged, including the equipment used and its source, personnel required for the work, personnel on-site and materials used. A copy of the log shall be on-site and available for reference at all times. 5. Project Coordination. a. Prior to construction, a preconstruction conference shall be organized and conducted by the engineer or developer. The contractor, representatives of all affected utilities, city staff, and any affected party shall be invited. b. Developer or engineer shall be responsible for coordination with the Wyoming Department of Environmental Quality (DEQ) as well as with all affected business owners within the project areas. This shall include timely notification of construction activities, as necessary, and the procurement of all necessary certifications from the appropriate agency or agencies. 6. Construction Survey and Control. a. Consultant shall show control points, bench marks, etc., on the drawings and provide the related pins, staking, etc., in the field, as necessary to construct the project. b. Consultant shall periodically verify the contractor's survey work to assure compliance with project requirements. 7. Testing. Materials and other testing shall be provided by a firm specializing in that work and approved by the city of Casper. Testing shall be paid for by the contractor. Compliance with city of Casper standard specifications for types and frequency for testing shall be required. All required testing shall be performed and documented for review by city staff. Acceptance of the work will be based on satisfactory results of all required testing. 8. Record Documents. a. Consultant shall provide to the city record drawings showing those changes made during the construction process, based on the consultant's observation, marked-up prints, drawings, and other data furnished by the contractor. b. Within thirty days of substantial completion of construction, developer or engineer shall submit one hard copy and one copy in digital PDF format via the city's FTP site, email, or other approved digital device. The hard copy shall be on either thirty-four inches by twenty-two inches or seventeen inches by eleven inches reproducible four-mil mylar. The digital copy must be in AutoCAD and GIS formats. CAD digital deliverables must be compatible with the city's current AutoCAD software, and utilizing the CAD (DWT) template provided by the city. Applicants may obtain a copy of the city CAD template from the city engineering office or via the city website. c. All CAD data developed for record documents must be submitted to the city engineering office within thirty days of substantial completion. All submitted CAD data must adhere to the National CAD Standard (NCS) Version 5 layering convention. Applicants may obtain a copy of the city CAD (DWS) standards file from the city engineering office or via the city website. d. The file naming convention for all digitally submitted CAD or GIS data shall be named according to plan/project name followed by drawing designation (preliminary, final, record), date delivered, with the extension .DWG for CAD type, .SHP (plus related files) for shapefile, and .GDB for file geodatabases. e. CAD and GIS digital deliverables must adhere to fundamental topologic and cartographic rules including but not limited to: Points must be connected to lines and lines must be broken at intersections with points. f. Within thirty days of substantial completion of construction, developer or engineer must submit via FTP, email, or other digital device a GIS digital file compatible with the city GIS infrastructure showing all new improvements will be provided with the record documents including but not limited to: Transportation, traffic, recreation, and utility related features. To obtain a comprehensive listing of features or a copy of the feature schemas included within the city GIS database contact the GIS office. For inclusion in the city GIS infrastructure all data must be horizontally referenced to NAD 83(86) state plane east central zone, survey feet at grid and all vertical measures will be referenced to NAVD 88(GEOID12A). g. The owner/subdivider/engineer/contractor will provide record drawings, signed and stamped by the engineer depicting the actual configuration and conditions after construction. Record drawings shall include location and elevations for all utility and transportation infrastructure. One set of reproducible record drawings on mylar and one set in digital format, in addition to, compatible digital CAD and GIS formats that adhere to the city's drafting and GIS programs shall be provided to the city engineer's office prior to the issuance of the letter of completion and start of the warranty period. h. If the applicant fails to submit digital data in accordance with this section within thirty days of substantial completion of construction, then the city may, at its option, do any or all of the following: After written notice to the applicant of any digital records which have not been completed or properly submitted, and upon applicant's failure to cure the same within thirty days, the city may complete the digital records on its own, or hire a third party to do so. The applicant shall pay to the city any and all costs and expenses (including, but not limited to, attorneys' fees, court costs and litigation costs) resulting therefrom upon demand by the city. The remedies provided in this section are in addition to any other remedies specifically provided for in this agreement, or which the city may otherwise have at law or in equity, and are not a limitation upon the same. 9. Temporary Traffic Control. a. Contractors shall submit traffic control plans and obtain traffic control permits from the city engineer's office prior to start of work. All traffic control shall comply with the MUTCD. b. Each time traffic control setups are revised, the revisions shall be communicated to the city engineer's office to be included in emergency services notifications. 10. Stormwater Phase II Regulations. a. Consultant shall include in the project requirements provisions for contractor to prepare erosion control plans and stormwater control plans, and obtain the required permits, including the NPDES permit for all projects that will disturb one acre or more. Consultant shall review and approve or comment on all plans. b. Stormwater control plans shall include controls for the construction period and for the post-construction period. c. The stormwater control plan may be incorporated into the erosion control plan submitted with the erosion control permit application. 11. Acceptance. Acceptance of the work shall be based on compliance with the drawings, specifications and quality. 12. Warranty. a. Standard warranty for city of Casper projects is a one-year period beginning with the date of the final payment. b. Subdivision warranty is required by the subdivision ordinance to be eighteen months; beginning after all punch list items have been completed. c. Owners (developers), heirs, successors in interest, and assigns covered by the subdivision agreement or water and sewer contract, shall warrant or guarantee the construction of public improvements against defects in workmanship or materials, including settlement of backfill. The owners, etc., shall make all needed repairs arising out of such defective workmanship or materials, or both, which in the judgment of the city of Casper staff shall become necessary during such period. EE. Schools Traffic Circulation. School bus drop-off locations shall be located off the street right-of-way. Drop-off zones for buses shall not be within street rights-of-way. Parent parking and drop-off zones shall be located in designated parking and driving zones off the street right-of-way. Parent parking and school bus drop-off locations at school facilities shall not conflict with the traffic patterns of each other.

(Ord. 2-06 (part), 2006) (Ord. No. 5-09, § 1, 12-17-2009; Ord. No. 8-11, § 3, 3-1-2011; Ord. No. 15-14, § 2, 7-15-2014; Ord. No. 31-19, § 1, 11-19-2019; Ord. No. 11-24, § 5, 6-18-2024)