§ 15.01.210 — Chapter 5, Section 503.2.3 amended—Surface
The Code of the City of Wichita, Kansas (Supp. No. 36, Update 1: codified through Ordinance No. 53-088, adopted July 28, 2026) · Wichita City Code § 15.01.210
Corpus is an independent public-information project, not the official City of Wichita website. Stable reference: corpuslaw.us/code/f77c69b5-61c6-41c5-b02b-8266948c1d25
Sec. 15.01.210. - Chapter 5, Section 503.2.3 amended—Surface.
Chapter 5, Section 503.2.3 of the International Fire Code, 2024 Edition, is amended to read as follows: 503.2.3 Surface. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced with asphalt or concrete or as specified below so as to provide all-weather driving capabilities. Access roads shall be installed to one of the following criteria: 1. Asphalt - 8 inches (203.2 mm) or concrete - 8 inches (203.2 mm) thick; or 2. To city street standards. Minimum specified material thickness for a 6-month temporary access road shall be of concrete aggregate - 6 inches (152.4 mm) or AB3 rock - 6 inches (152.4 mm). 3. Alternate paving materials (Turfcrete/Grasscrete) - Alternative paving materials such as "Grass Crete" turf block or similar type materials may be used for Fire Department Access Roads under certain conditions. When submitting for permits the applicant shall include cut sheets of the proposed alternative material and the design criteria based upon the imposed load of fire apparatus weighing at least 75,000 pounds. The following conditions shall be met: a. A construction permit for the installation of the alternate paving material is required as specified in Section 105.6.26. b. Signs & Marking requirements shall be followed. c. Paving shall be structurally sound to preclude movement or disbanding with soil movement. d. The paving shall be field tested by the contractor in the presence of the Fire Code Official. Testing may include driving the access road by a weight-verified vehicle. Prior to testing, the soil shall be soaked for three days in a row. e. Prior to final approval, the engineer of record (civil or soils engineer) shall certify the installation. f. Maximum distance of alternate paving material is 200 feet.
(Ord. No. 52-878, § 21, 1-13-26)
Ask a question about Wichita law
Corpus searches the Wichita sections it holds and shows the ones that match, with their citations. Free, no sign-in.
