§ 405.180 — Utility Easement
Code of Ordinances, City of O'Fallon, Missouri (Code 2026-10-22) · O'Fallon City Code § 405.180
Corpus is an independent public-information project, not the official City of O'Fallon website. Stable reference: corpuslaw.us/code/cbe47291-5530-48d1-9c53-547eb17a1a6e
Section 405.180: Utility Easement.
A. Utility Easement Requirements. 1. Utility Easements. Utility easements shall be provided and be at least ten (10) feet wide [five (5) feet on each side of the lot line] along rear, front and side lot lines. Easements of adequate width shall be provided for open drainage channels and rear yard swales, where required. Easements five (5) feet in width may be allowed for underground cable installations. Telephone and electric power lines shall be located underground, except in large lot subdivisions where all of the lots are twenty-two thousand (22,000) square feet or larger in size, and then the developer will have the option of underground or overhead utility lines. 2. Utility/Roadway Easements. A minimum of a ten-foot utility/roadway easement shall be required adjacent to all City, County and State rights-of-way. Such utility/roadway easements shall also include working space to work on such utility and/or roadway. 3. All underground public utility installations, including lines for streetlighting systems, which traverse privately owned property, shall be protected by easements granted by the developer to the appropriate public utility and reasonably approved by the public utility. Such easements shall be so located as to not interfere with the use of any lot or other part of the subdivision. The size of, and restrictions pertaining to, such easements shall be in accordance with the legally adopted or reasonable standards and the specifications of the agency having jurisdiction over the utility lines and subdivision and shall be indicated on the record plat submitted for approval. 4. Where a cut or fill for a street extends beyond the limits of the right-of-way, the developer shall provide a slope easement as determined by the City Engineer and/or his/her designee to be of sufficient area and limits to permit the construction and maintenance of the slope. 5. Stormwater easements and drainage rights-of-way may be required by the City of O'Fallon if necessary for proper drainage within or through a subdivision. Whenever a stream or surface drainage course conveying a minimum of one and one-half (1.5) cfs in a fifteen-year, twenty-minute storm is located in or planned for an area proposed for a subdivision, the developer shall provide a minimum ten-foot-wide easement or wider as determined by the City Engineer and/or his/her designee to be adequate in area to contain facilities, to control flooding or erosion along said stream or surface drainage course and protect the facility from blockages. Said easements shall be shown on the record plat with the following language: This easement is for emergency or access purposes; however, regular yard maintenance would fall on the property owner. B. Off-Site Utility Easement. 1. For any existing off-site utility easements that are dedicated to the City of O'Fallon but are desired to be utilized by a new development, the following are required: a. Only public-type facilities (mains that will be maintained by the public utility) can be placed within these easements. No private service lines or laterals can utilize these easements, unless otherwise approved by the City Engineer or their designee. b. The owners of the property where the existing off-site easements reside should be notified in writing and at a minimum of forty-eight (48) hours in advance of the anticipated work, of any impacts to that property (either physical alterations of the property or losses of some service of the property). Any concerns shall be addressed with the property owner. Failure to reasonably restore the property to its prior condition may result in withholding of escrow releases or issuances of related permits until these issues are addressed. The Engineering Department shall be provided copies of any and all agreements, notifications and correspondences with the property owner prior to construction plan approval. c. If the adjacent property owner is a common ground or private property (with no apparent off-site easements providing rights), then the developer of the project shall be required to obtain new off-site easements prior to plan and/or permit approval. d. The City is not responsible for the acquisition of these off-site easements.
[R.O. 2008 § 405.180; Ord. No. 6496 , 9-13-2018 ; Ord. No. 7056 , 10-26-2023 ]
Ask a question about O'Fallon law
Corpus searches the O'Fallon sections it holds and shows the ones that match, with their citations. Free, no sign-in.
