§ 405.210 — Construction Requirements

Code of Ordinances, City of O'Fallon, Missouri (Code 2026-10-22) · O'Fallon City Code § 405.210

Corpus is an independent public-information project, not the official City of O'Fallon website. Stable reference: corpuslaw.us/code/949dacad-1eea-4402-b04a-51936fd459e1

Section 405.210: Construction Requirements.

A. Public Street Construction. Streets shall be graded to full width of the right-of-way and fully constructed of asphaltic concrete or Portland cement concrete pavements in accordance with the St. Louis County Department of Transportation Standard Drawings, latest revision, and the St. Louis County Standard Specifications for Highway Construction, Divisions 200 through 1000, latest revision, except as modified by the City of O'Fallon's codes or ordinances. 1. Those publications listed above shall be adopted in whole with the following exceptions: a. Standard drawing numbers: C203.66-C203.70, C604, C614, and C725-C732 drawings are not adopted. b. All references to "St. Louis County" in any form shall be replaced with "City of O'Fallon" where appropriate. c. All references to "department" shall mean the "Department of Engineering of the City of O'Fallon" where appropriate. d. The standard details for construction of pavements shall follow those standards established by the ordinances of the City. The ordinances of the City of O'Fallon supersede and take precedence over the St. Louis County Standard Specifications for Highway Construction and standard details. e. Construction Staking. All construction staking shall be provided by the contractor unless otherwise indicated by the City Engineer. 2. The following additional modifications shall be included and prevail over the adopted publications: a. All concrete used for public infrastructure (streets, sidewalks, trails and curbs) in the City of O'Fallon shall be approved by the Eastern Missouri Pavement Consortium (EMPC) and meet requirements specified in City Ordinance No. 6496 approved on September 13, 2018. This includes roadways that are being developed and intended to become public roadways upon dedication and acceptance by the City. b. Underdrains shall be required and installed per Exhibit A in Appendix D[1] of the O'Fallon City Municipal Code [Section 405.390(A)(5)]. Underdrains are required to be installed at all inlets. If a roadway has an open-type drainage system, underdrains are to be installed every five hundred (500) feet. c. A representative sample of proposed limestone, calcitic dolomite or other mineral referred to as "limestone" that is used for coarse aggregate for concrete shall undergo appropriate testing, by an independent third-party testing agency to determine and verify that the coarse aggregate to be utilized does not exhibit, and is not susceptible to, alkali-carbonate reaction (ACR). Said third-party testing agency or agencies will need to be a City-approved agency that is experienced in performing the necessary tests. d. For ACR testing, the testing performed shall include ASTM C295, ASTM C586 and ASTM C1105. The agency performing these tests must be informed prior to testing to look specifically for the potential of ACR, and the reports generated from the testing shall specifically address the potential of ACR in the text. This testing shall be performed for each ledge within a quarry that is planned to be used for concrete pavement within the City of O'Fallon. e. The following requirements pertain to the ASTM C295 test. For the first two (2) years of this requirement, the tests shall be made within six (6) months of the planned use in concrete. After the first two (2) years of testing within a quarry, the City Engineer may allow the interval between tests to go up to one (1) year if there is convincing evidence to show this is warranted. The petrograph test shall be performed by a petrographer experienced in identifying ACR-prone dolomitic limestone or calcitic dolomite. The reports of the testing noted herein shall be submitted to the City with the concrete mix design submittal. f. The following requirements pertain to the ASTM C586 and ASTM C 1105 tests. These test reports shall be required to be submitted to the City beginning on August 1, 2017. The period of time from approval of this Chapter to when the reporting is required to be submitted allows time for the tests to be completed. For the first two (2) years of this requirement being in place, these tests shall be made within twelve (12) months of the planned use in concrete pavement. After the first three (3) years of testing within a quarry, the City Engineer may allow the interval between tests to go up to two (2) years if there is convincing evidence to show this is warranted. g. In lieu of performing the above testing, Meramec gravel can be utilized for coarse aggregate in Portland cement concrete pavement. The coarse aggregate shall be Meramec gravel meeting Missouri Department of Transportation current "Missouri Standard Specifications for Highway Construction," Section 100.5.1.5, Gradation "D." h. All coarse and fine aggregate material utilized for Portland cement concrete pavement shall have been inspected and approved by the Missouri Department of Transportation (MoDOT) for said use. If MoDOT inspection is not available, a third-party testing agency that is experienced in performing the necessary test will need to be approved by the City. The delivery ticket shall be marked to indicate that the rock has been tested and meets MoDOT specifications. i. Coarse aggregate utilized for Portland cement concrete pavement shall only be used from rock ledges that have been inspected and accepted by MoDOT for said use. If MoDOT inspection is not available, a third-party testing agency that is experienced in performing the necessary test will need to be approved by the City. j. A complete copy of the results of the above-referenced testing, as well as mix design submittal information, MoDOT certifications and other associated certifications required per this Chapter and per the St. Louis County Standard Specifications for Road and Bridge Construction shall be submitted to the City a minimum of seven (7) days prior to the placement of the concrete. The City must be in agreement with said test results, mix designs and certifications prior to the placement of any concrete. k. For all granular base material deliveries, the delivery ticket must be annotated or signed by the rock supplier to indicate that the granular base material meets the Missouri Department of Transportation (MoDOT) requirements for Type 5 aggregate for base. This ticket must be submitted to the City for recordkeeping purposes at the time of delivery. Any deliveries made without the proper delivery tickets, including signature, will not be accepted for use. In lieu of a signature on the delivery ticket a separate product certification sheet with a signature of the company's quality control manager may be provided to go with the delivery tickets. The product certification sheet must be current, dated to within four (4) weeks of the date of delivery and also list the project name or job site location. 3. The minimum concrete pavement thickness shall be seven (7) inches thick. On minor residential streets, the transverse joints are not required to have load transfer devices. All other higher classifications of streets will be required to have load transfer devices in the transverse joints. 4. The following is a list of deficiencies that shall require concrete removal and replacement: a. If there is one (1) crack in the slab, and there is deflection in the crack or other indications of structural deficiency or compromise, then the full slab shall be replaced. b. Two or more cracks in a slab shall require the replacement of the full slab. c. Any concrete slab found to be less than the required thickness per City standard shall be removed and replaced with a slab that at least meets applicable specifications. B. Approval Of Subgrade And Base (Subbase). The City Engineer and/or his/her designee shall approve the subgrade before any base is placed thereon and shall approve the base before concrete or surface course is placed. The subgrade and base shall be so constructed that it will be uniform in density throughout. 1. All subbase shall conform to a modified MoDOT Type 5 base [five (5) inches thick] and/or as approved by the EMPC. The modified MoDOT Type 5 rock shall meet all the requirements of MoDOT Type 5 rock and also be required to have no more than ten percent (10%) fines passing a No. 200 sieve. All gradations for this type of rock shall be submitted to the City and/or the EMPC for approval prior to use. 2. In all fill areas in the roadways, soil tests shall be submitted and approved by the City Engineer for each foot of fill and at least one (1) test and an average of one (1) test within every two hundred fifty (250) feet. 3. No traffic will be allowed on new concrete pavement until it has cured for seven (7) days and it reaches three thousand five hundred (3,500) psi. Concrete pavement shall not be approved unless it reaches required strength within twenty-eight (28) days. 4. Prior to placement of aggregate base material on subgrade and prior to placement of pavement on base material, the subgrade and base must be proof-rolled with a fully loaded (ten-ton load) tandem truck or equivalent tire vehicle with one (1) pass down each driving lane no faster than three (3) miles per hour. If soft spots are detected, or pumping, rutting or heaving occurs greater than one (1) inch at the subgrade, the roadbed shall be considered unsatisfactory, and the soil in these areas shall be remediated to the depth indicated by the contractor's testing firm and approved by a representative of the City Engineer. 5. Subgrade and base beneath pavements shall be compacted to St. Louis County Standard Specifications for Road and Bridge Construction. The moisture range shall be determined by the Standard or Modified Proctor Density Method AASHTO T-99 and within -2)/+4 percentage points of the optimum moisture content. 6. The entire width and length will conform to line, grade and cross section shown on the plans or as established by the engineer. If any settling or washing occurs, or where hauling results in ruts or other objectionable irregularities, the contractor shall improve the subgrade or base to the satisfaction of the City before the pavement is placed. Additional rolling or methods to verify compaction shall be at the discretion of the City Engineer. Tolerance allowed on all lines, grades and cross sections shall be plus or minus four-one-hundredths (+ 0.04) feet. 7. Delivery tickets for all granular base material shall be submitted to the City as specified in City Ordinance No. 6335[2] approved on April 13, 2017. C. Utility Work Prior To Base Construction. No base course work may proceed on any street until all utility excavations (storm and sanitary sewers, water, gas, electric, etc.) have been properly backfilled with granular material, crushed stone or gravel mechanically tamped in ten-inch lifts. Utilities installed after subgrade preparation shall be bored. Compaction requirements shall follow St. Louis County standards. D. Outside (beyond) the pavement limits, excavations shall be jetted with water and allowed to set for a length of time satisfactory to the City Engineer. 1. Jetting. Granular materials and earth materials associated with new construction beyond the pavement may be jetted, taking care to avoid damage to newly laid sewers. The jetting shall be performed with a probe route on not greater than seven-and-one-half-foot centers with the jetting probe centered over and parallel with the direction of the pipe. Trench widths greater than ten (10) feet will require multiple probes every seven-and-one-half-foot centers. a. Depth. Trench backfill less than eight (8) feet in depth shall be probed to a depth extending to half the depth of the trench backfill, but not less than three (3) feet. Trench backfill greater than eight (8) feet in depth shall be probed to half the depth of the trench backfill but not greater than eight (8) feet. b. Equipment. The jetting probe shall be a metal pipe with an exterior diameter of one and one-half (1.5) to two (2) inches. c. Method. Jetting shall be performed from the low surface topographic point and proceed toward the high point, and from the bottom of the trench backfill towards the surface. The flooding of each jetting probe shall be started slowly allowing slow saturation of the soil. Water is not allowed to flow away from the ditch without first saturating the trench. d. Surface Bridging. The contractor shall identify the locations of the surface bridging (the tendency for the upper backfill crust to arch over the trench rather than collapse and consolidate during the jetting process). The contractor shall break down the bridged areas using an appropriate method such as wheels or bucket of a backhoe. When the surface crust is collapsed, the void shall be backfilled with the same material used as trench backfill and rejetted. Compaction of the materials within the sunken/jetted area shall be compacted such that no further surface subsidence occurs. E. Required Joint Details In Concrete Streets. Construction joints shall be required in all concrete roadways as a normal requirement. St. Louis County Department of Transportation standards shall apply. Additionally: 1. The developer's engineer shall identify on the record plat any lot for which special precautions should be taken to prevent damage to any structure caused by the forces commonly known as "street creep." The developer's engineer shall also recommend any special construction technique required to counter the forces. F. Material Testing And Frequency. Materials for construction shall be tested and inspected per the appropriate ASTM code or at the City Engineer's discretion. The developer's engineer shall perform the following quality control guidelines: 1. Concrete. a. Cylinders/Compressive Strength. One (1) set of four (4) cylinders within the first fifty (50) cubic yards and one (1) set per one hundred (100) cubic yards thereafter. One (1) cylinder must be tested at seven (7) days, one (1) at fourteen (14) days and two (2) at twenty-eight (28) days. If the first cylinder does not meet specifications at twenty-eight (28) days, then the second cylinder must be held and tested at day fifty-six (56). b. Percent Air And Temperature. First truck batch each day and two (2) thereafter until a consistency is encountered. Once a consistency is encountered, then tests will be performed in conjunction with the concrete cylinders. c. Slump. First truck batch each day and two (2) thereafter until a consistency is encountered. Once a consistency is encountered, then tests will be performed in conjunction with the concrete cylinders. d. If concrete is batched from more than one (1) plant, then the aforementioned guidelines will be applicable to each plant. 2. Subgrade And Base. a. Proof roll as described in Section 405.210(B). b. One (1) compaction test per two hundred fifty (250) feet of mainline paving, three (3) tests per intersection, five (5) tests within culs-de-sac and one (1) test per repair slab. c. Gradation test for subbase material. 3. Asphalt. a. One (1) set of compaction tests per two hundred fifty (250) feet of mainline. One (1) set includes three (3) tests across the paved lane at the same station. b. One (1) bulk density test per paving operation. 4. Site Grading. a. Within City Right-Of-Way. Material is to be placed in eight-inch to twelve-inch loose lifts and compacted per the approved compaction requirements. One (1) compaction test will be performed every two hundred fifty (250) feet along the center line for each lift. b. Outside Of City Right-Of-Way. Material is to be placed in eight-inch to twelve-inch loose lifts and compacted per the approved compaction requirements. One (1) compaction test will be performed at two-foot vertical intervals and approximately every one thousand (1,000) cubic yards. 5. Quality Control Reports. a. Daily. Descriptive daily reports are required for each day a representative is present on-site from the quality control company (soil testing firm). At a minimum, the daily report should include representative on-site, date, materials observed, activities performed, weather, recommendations or concerns made and to whom. b. Proctor Reports. Must have a valid Proctor value prior to testing on-site. At a minimum, the Proctor curve provided must include sample location and must have five (5) density points (values) and moisture (values) listed on the document, optimum moisture content, maximum dry density, zero air voids curve and assumed specific gravity, natural moisture content, Proctor type and procedure, liquid limit, plastic limit. c. Compaction Report. At a minimum, the compaction reports will include elevation of test and rod depth, station/specific location, Proctor type, optimum moisture content, maximum lab dry density, in place moisture content, in place dry density, percent compaction, does/does not comply with specification requirements, specification requirements, material type, weather, date. If a drawing is needed to show location of the tests, the drawing must be professionally done or at least on sheet copy of the plans. No hand drawings will be accepted. d. Concrete Report. At a minimum, the field concrete report will include location of concrete placed, representative on-site, date, weather, concrete supplier, ticket and truck number, time truck arrived on-site, time concrete poured, air temperature, concrete temperature, mix type, strength requirement, water added, slump (actual and required), air content (actual and required), number of cylinders cast, overnight temperature, overnight storage temperature, date received at lab. At a minimum, the laboratory concrete field report will include age (days) of test, test date, cylinder diameter, cylinder area, load (pounds), compressive strength (psi), does/does not comply with specification requirements. 6. Equipment Calibration. The developer's contractors and subcontractors must have their equipment calibrated by the following minimum standards: a. Air meter: weekly. b. Cylinder compression: annually by independent calibration service. c. Batch scales: monthly. d. Nuclear testing devices: every six (6) months. e. Proctor equipment: every six (6) months. f. Slump cone: monthly. G. Specifications For Construction Of Driveway Entrances. All driveway entrances constructed within the public right-of-way in the City of O'Fallon shall meet the following specifications and conform to site plan requirements. A permit shall be obtained through the Engineering Department, for any driveway widening and/or modifications to the driveway apron, within the City street right-of-way. A permit will not be needed if the construction is part of another City-permitted development: 1. All driveway entrances shall be built to grade; 2. The maximum grade of the driveway, behind the sidewalk, shall be fifteen percent (15%). No portion of the driveway may exceed fifteen percent (15%) in slope. 3. If a culvert is necessary in the opinion of the Engineering Department, no culvert smaller than twelve (12) inches in diameter shall be installed, and no culvert shorter than sixteen (16) feet shall be installed; a larger culvert shall be installed wherever, in the opinion of the Engineering Department, it is necessary. 4. No driveway entrances shall be constructed or built or partially constructed or built within two (2) feet from the side or rear property lines. No driveway shall be closer than six (6) feet from the edge of a curb inlet. Exceptions: a. Existing entrances that are already closer than two (2) feet from the property line. b. Multi-family dwellings. c. City staff may allow minor alterations in special circumstances. 5. All driveway entrances shall be six (6) inches in depth for residential driveways and a minimum of seven (7) inches in depth for commercial driveways from the edge of the road pavement to the property line. a. For commercial driveways, for new concrete entrances at existing pavement and curbing, saw cut at one (1) foot and install tie bars, five-eighths-inch diameter, eighteen (18) inches long, at twelve-inch centers along all saw-cut edges. New tie bars shall be placed in drilled holes with non-shrink grout or epoxy. The bars, where existing, shall be cleaned and straightened for incorporation in the new concrete. b. For commercial driveways, the new driveway edge up against existing street pavement shall match the street pavement thickness. All street pavement removed and replaced shall be the same thickness. After the gutter line or the edge of street pavement line, it shall then flare back to the seven-inch minimum depth within a two-foot length. 6. All driveway approaches constructed in conjunction with a sidewalk shall give the appearance that the sidewalk is continuous. That portion of the driveway approach that doubles as a sidewalk shall have a one-and-one-half percent (1.5%) maximum cross slope the same as the abutting sidewalk, meeting ADA requirements. a. If the existing sidewalk adjacent to the driveway is over one and one-half percent (1.5%) in cross slope, then the first panel of sidewalk immediately adjacent to the driveway shall be removed and replaced as a transition section. b. An exception to this requirement is when a sidewalk does not exist nor is not planned to be built. 7. Expansion joints in the driveway approach area shall be two (2) inches wide and full depth at the back of curb. In all cases if the driveway approach depth exceeds the minimum six-inch thickness, the joint material shall extend the full depth of pavement, no concrete to concrete interface. 8. The expansion joint between the driveway and garage floor shall be a minimum of two (2) inches and full depth of slab. H. Guardrail. The following additional modifications shall be included and prevail over the adopted publications: 1. Guardrail shall be required to protect traffic from hazardous features, or to restrict or prohibit traffic movements. Guardrail will be required for roadway heights (including fill) of ten (10) feet or more adjacent to the roadway, or heights of seven (7) feet or more at pavement terminations. Terminal sections will be required for both directions of traffic flow on two-way pavement. Where the distance between terminal sections of two sections of guardrail will be one hundred (100) feet or less, one (1) continuous length of guardrail shall be installed. a. Guardrail shall be provided for protection of traffic adjacent to creeks and lakes, at bridge ends, piers, large signs (with no breakaway base) and headwalls, and as street barricades, as directed by the Engineering Department. Refer to the St. Louis County Standard Drawings C606.01 through C606.23. 2. Roadway Berms. The grading and placement of berms within the road right-of-way as an alternate to guardrail may be permitted with special approval by the Engineering Department where such installations are considered compatible with the roadway typical section. Berms shall be constructed to a height of three (3) feet above the adjacent edge of pavement or curbs with 3:1 side slopes. 3. Escape Area. The grading of an escape area as an alternate to guardrail or roadway berms will have a slope no steeper than 6:1 and will be permitted by the Engineering Department in accordance with the following: Minimum Escape Area Distance Design Speed(MPH) | From Edge of Pavement to Breakpoint(feet) 25 | 20 30 to 35 | 25 40 | 30

[R.O. 2008 § 405.210; Ord. No. 6496 , 9-13-2018 ; Ord. No. 6855 , 12-16-2021 ; Ord. No. 7056 , 10-26-2023 ; Ord. No. 7311 , 4-23-2026 ]