For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 405.260 — Water Supply

Code of Ordinances, City of O'Fallon, Missouri (Code 2026-10-22) · O'Fallon City Code § 405.260

Corpus is an independent public-information project, not the official City of O'Fallon website. Stable reference: corpuslaw.us/code/bc342649-3e22-4bcb-869c-e681fda6f740

Section 405.260: Water Supply.

A. Where a public water supply main is reasonably accessible, in the opinion of the City, the subdivision shall be provided with a complete water distribution system adequate to serve the area being platted, including a connection for each lot and appropriately spaced fire hydrants whose locations shall be reviewed and approved by the appropriate fire protection district. The water system shall be designed and constructed per the American Water Works Association (AWWA) standards and guidelines and approved by the City of O'Fallon, per Chapter 700, Public Utilities. 1. Water systems outside the City of O'Fallon service area shall be reviewed and approved by the appropriate water district servicing the area. Approval letters shall be forwarded to the City of O'Fallon Engineering Department for service areas within the municipal boundaries. 2. Where proposed developments are adjacent to municipal boundaries in the City water district and where fire flow demands are deficient, or where the area is served with no looped system, the developer may be required to connect to the outside agency's water system. a. If required, the proposed connection will be recommended to the City Council as part of the Planning and Zoning review and approval of the proposed development. b. Any hydraulic analysis shall require the City's model to be updated. The City's water consultant shall be engaged to review any technical design report or documents pertaining to any final system layout and to update the model. B. For lots with individual water systems and sanitary sewage disposal systems, the applicant shall adhere to St. Charles County requirements regarding the minimum lot size.

[R.O. 2008 § 405.260; Ord. No. 6496 , 9-13-2018 ]

Ask a question about O'Fallon law

Corpus searches the O'Fallon sections it holds and shows the ones that match, with their citations. Free, no sign-in.