Section 405.240: Stormwater Detention.
A. Policy. It is the policy of the City of O'Fallon to protect and promote the public health, safety and general welfare. The criteria for stormwater detention will: 1. Reduce the possibility of damage to public and private property; 2. Reduce the erosion of land and creek channels; 3. Assist in the attainment and maintenance of water quality standards; and 4. Preserve and enhance the environmental quality of the watercourses in the City. This criteria provides uniform procedures for designing and checking the design of storm drainage detention systems. B. General Guidelines. 1. Applicability. This Section shall apply to all development within the corporate limits of the City of O'Fallon, Missouri. Residential developments having a total area of less than five (5) acres and commercial or industrial developments having a total area of less than one (1) acre may be given a waiver by the City in accordance with Article V of this Chapter subject to the following conditions: a. The City retains the right to require detention storage in all cases in which the proposed development will generate excess runoff that adversely affects the carrying capacity of the receiving watercourse. b. Developments less than one (1) acre with less than thirty percent (30%) of the area paved and developments generating less than one (1) cubic foot per second per acre (cfs/acre) increased runoff shall not be required to provide detention storage unless the condition in Subsection (B)(1)(a) above is applicable. c. This Section shall apply for all newly platted areas and new developments proposed after August 17, 1987. All developments that have an approved preliminary plan by the Planning and Zoning Commission at the time of the approval of this Section will not have to conform to this Section. 2. Affidavit Of Disclosure Of Property Interest. The effective acreage for a site is not limited to a fractional part of the total. If a project is developed in phases or small plats, the total acreage of the project site must be considered. At the time the owner of any development submits a preliminary plat or preliminary plan, the owner shall also identify to the City all contiguous property or property in the watershed that he/she has interest in. 3. Method Of Evaluation. The storage capacity and discharge rate shall be based upon the calculated volume and peak flow of the stormwater runoff, respectively. The calculations for sites having an area of one hundred (100) acres or less shall be made using either the Soil Conservation Service Method or the Rational Method. If the site is larger than one hundred (100) acres, then the engineer shall use the Soil Conservation Service Method. If another method is desired to be used, the engineer shall submit a proposed method of evaluation for the calculations for review and approval. The permitted discharge rate of stormwater runoff shall be determined by calculating the rate of runoff for the site's pre- and post-development conditions. The engineer shall determine the most critical storm looking at three (3) different time periods: a. The time of concentration; b. A one-hour storm; and c. A twenty-four-hour storm. 4. Detention Of Differential Runoff. All new developments shall provide a stormwater detention facility that insures that the rate of flow of stormwater runoff discharge from the site after development for a two-year, 15-year, and 100-year (20-minute storm), unless given a waiver by the City in accordance with Article V of this Chapter. Data shall be submitted for the two-, 15-, and 100-year frequency (20-minute storms). a. The highwater elevations for all of the above-mentioned storm events shall be provided on the plans. b. The maximum ponding elevation shall be calculated based on a routing of the design storm (100-year, 20-minute) assuming the lowest outlet is blocked with the water ponded to its maximum elevation. A minimum of one (1) foot of freeboard shall be provided from the top of the basin to the maximum ponding elevation. c. Any existing development that was approved and accounted for detention under previous City codes, shall continue to maintain detention requirements that were applicable at the time, and those former requirements will continue to be allowed, even if the property use expands (for example, a building addition, a parking lot addition). d. Any redevelopment of a tract of land shall have the current standards applied to the complete site. e. Any undeveloped lot(s) within an existing development (residential or commercial) that is already covered with detention, under previous City requirements or as may have been accepted by the City with annexations, may continue being developed under the previous requirements, unless: (1) If the previous requirements are not known or the existing detention facility calculations cannot to be verified, then the current detention requirements of the City shall govern for the improvements for the proposed lot. (2) If the existing development does not have detention, then the current detention requirements of the City shall govern for the improvements for the proposed lot. C. Design Criteria. 1. General Requirements. The design shall be accomplished under the direction of a Missouri registered professional engineer. The design shall also be based on land use in the tributary area as zoned, actually developed or indicated by an adopted future land use plan, whichever basis produces the greatest runoff. 2. Other References. Other agencies have criteria and regulations pertaining to drainage systems which may complement these criteria. When conflicts are encountered, the most rigorous criteria shall govern. a. FEMA. Floodplain regulations and implementing ordinances adopted by municipalities. Drainage systems designed within the limits of the designated 100-year floodplain on the principal stream shall be designed to convey the flood as defined by applicable published floodplain information studies. For areas located in FIRM Zone "A" outside the detailed study, the developer shall prepare studies and calculations establishing the floodplain, elevation and width. These calculations shall be submitted to the reviewing agencies for approval. (1) In the event that a developer desires to place a basin within an existing floodplain that is to be adjusted via a FEMA-approved process, then the following process must be followed: (a) Developer shall identify the proposed conceptual new floodplain limits on the plans to be submitted to Planning and Zoning. (b) Obtain conditional Letter of Map Change from FEMA prior to construction plan approval. (c) Approved Letter of Map Change denoting the adjusted floodplain shall be completed prior to final ten percent (10%) escrow release for the development. This item will be noted as part of the construction inspection process. b. Missouri Department Of Natural Resources. Rules and regulations of the Dam and Reservoir Safety Council shall apply to those Missouri structures classified as dams thereunder. 3. Stormwater Runoff. The design criteria used in determining the amount of runoff shall be the same as set out in Section 405.230 of this Chapter. 4. Hydraulic Considerations For Detention Storage. a. Principal spillways shall be designed to meet the following requirements: (1) The principal spillway shall be designed to function without requiring attendance or operation of any kind or requiring use of equipment or tools. (2) All discharge from the detention facility when inflow is equal to or less than the 100-year inflow shall be via the principal spillway(s). (3) The design shall allow for discharge of at least eighty percent (80%) of the detention storage volume within twenty-four (24) hours after the peak or center of mass of the inflow has entered the detention basin. On basins less than one hundred (100) acres, this shall not apply. (4) The design discharge rate via the spillway shall continuously increase with increasing head and shall have hydraulic characteristics similar to weirs, orifices or pipes. b. Emergency Spillways. The emergency spillway shall be provided to pass a 100-year storm without damaging any property and, where applicable, designed to DNR dam safety requirements. Overland flow route will be required to be depicted on the plan for emergency spillways. c. Outlet Works. Detention facilities shall have an outlet works consisting of valves, gates, pipes and other devices as necessary to completely drain the facility in seventy-two (72) hours or less when required for maintenance or inspection on normally wet basins. d. Sediment Storage. Public detention facilities shall be designed to provide for five (5) years of sediment accumulation calculated by using Figure 1 in Appendix D.[1] All other detention facilities shall provide storage for two (2) years of sediment accumulation by using Figure 1, except for those using roofs of buildings, paved parking areas or other facilities designed to preclude the deposition or accumulation of sediment. Sediment storage volume shall be in addition to the volume required for temporary storage of stormwater to properly size the detention facility on normally wet basins. e. Erosion and Sediment Control. A SWPPP shall be developed to prevent erosion in principal spillways and prevent the flow or runoff of mud, silt, dirt, debris and other materials onto streets, sidewalks and other public rights-of-way, in accordance with the guidelines and requirements as set forth in Section 405.245 of the City Code. Special measures shall be taken by the developer to not permit sediment from filling the proposed detention basin during all construction of the proposed development unless a design is provided and approved to use the detention basin as a temporary silt basin until such time as the stormwater improvements are completed and the site vegetated. f. Public Detention Facilities. As a general rule, detention facilities shall be private facilities. When determined that a facility shall be a public facility, the owner shall dedicate the detention facility and easements with the recording of the record plat, except: (1) When multipurpose wet facilities are planned or are suitable for use for private aquatic recreation or for aesthetic enhancement of the owner's property. (2) When multipurpose dry facilities incorporate surface recreational improvements. (3) Any other means of dedication shall require acknowledgement and acceptance by ordinance from the City Council. g. Private Detention Facilities. Shall be designed requiring the same criteria as the public detention facilities. The amount of easement shall be equal to the land occupied by the facility, plus a 20-foot wide strip around the perimeter of the highest elevation attained by the design storage volume, plus an access easement twenty (20) feet in width between the facility and the public street. This easement shall be shown as common ground and be dedicated to the trustees of the subdivision or owner of the multi-family, commercial or industrial property for the purpose of maintenance of the stormwater detention facility and shall not be part of a residential lot. The easements as described above shall also be dedicated to the City for emergency access or periodic inspection. The following items shall be addressed: (1) A plan for perpetual maintenance and designating responsibility for the maintenance shall be provided for its continuing performance to the standards established by these criteria. (2) Underground detention facilities shall also have the above-mentioned easements provided. Easements shall be labeled properly on the record plat or by separate document. h. Plan Requirements. The plan requirements shall be the same as set out in Section 405.230 of this Chapter with the following additions: (1) Elevation-area-capacity curves for the detention facility, including notation of the storage volumes allocated to runoff and permanent residual water storage for other uses (wet basins only). (2) Inflow hydrograph (detention volumes for Rational Method) for the two-, 15-, 25- and 100-year recurrence interval design storms. (3) Stage-discharge rating curves for each spillway and for combined spillway discharges. (4) Routing curves for the two (2) year and all greater criteria recurrence interval design storms with time plotted as the abscissa and the following plotted as ordinates (this item is not required for the Rational Method): (a) Cumulative inflow volume. (b) Cumulative discharge. (c) Stage elevation. (5) A 10-foot minimum depth for all retention (wet detention) basins shall be required (per DNR recommendation for healthy aquatic environment). (a) Shallower depth [eight (8) foot minimum] may be allowed as long as aeration is provided on the pond. (6) All storm sewer pipes shall be labeled as either "public" or "private" on the storm sewer profile sheets. The transition from private maintenance to public maintenance shall occur at a transition structure, with the transition structure itself being publicly maintained. For purposes of this subsection: (a)"structure" means a manhole or area inlet installed at ground level and a vertical access element leading to a buried pipe; and (b) "transition structure" means a segment of buried pipe combined with a connected structure. Pipes are not allowed to transition between private and public maintenance other than at a transition structure. Unless otherwise approved by the Director of Engineering for good cause shown by the applicant to the Director's professional satisfaction, a detention basin and the adjacent segment of pipe discharging into a detention basin shall be located in common ground in accord with subsection (C)(4)(g) of this Section, above, and shall be privately maintained and shall be so labeled. A transition structure shall be located adjacent to the segment of pipe discharging into the detention basin, and that transition structure and all pipes discharging into the transition structure shall be publicly maintained and shall be so labeled. Ideally, the transition structure should be installed at the boundary between common ground and adjacent private property whenever possible. Detention outflow pipes which flow into a creek, stream or to a point located in common ground will be privately maintained and shall be so labeled. Detention outflow pipes which do not flow into a creek or stream and continue to connect to a public system, shall be privately maintained up to the first structure and shall be so labeled. The structure and the segment of pipe to which it is connected shall be a transition structure, and that transition structure and further pipe carrying discharge from the transition structure shall be publicly maintained and shall be so labeled. (7) For all underground detention facilities, a manhole (or similar accessible structure) shall be provided both upstream and downstream [within ten (10) feet or as approved by the City], for access. Access lids shall be labeled with the words "underground basin" or similar on each structure. Labels shall be cast into the lid and be of the same material that is required under storm sewer design. (8) No planting of trees or extensive landscaping shall be permitted over the top of the underground detention facility, within the limits of the encompassing easement. 5. Safety Bench. All retention (wet detention) basins shall have a safety bench above the normal pool water elevation, with the following requirements: a. Width shall be six (6) feet, starting at where the normal pool elevation intersects the bank. b. Slope of the safety bench shall not exceed 6:1. c. The 3:1 slope of the basin banks shall then start at the back of the safety bench. d. Any aquatic bench (defined as a stormwater BMP) being considered shall be a separate entity from the safety bench. D. Construction Alternates. The developer shall build as part of his/her development a detention facility as required by this Section unless the following Subsections apply: 1. If requested by the developer or by the City of O'Fallon, the City, at its option, may waive the construction of a detention facility as for the development. The developer shall seek approval from the City Engineer for the basin to be waived. If the waiver is granted, the developer shall pay an amount equal to the cost of detention for the site as determined by the unit cost as published and updated by St. Louis County. This money is to be used in a stormwater fund for future City stormwater projects. A contractor's bid may be submitted in lieu of using the published data although the bid must be reviewed and approved by the City Engineer prior to acceptance. This option may only be considered if the requirements set out in Subsection (B) above are applicable. 2. Off-Site/Regional Detention. All detention facilities shall be on the individual site being developed. The exception to this requirement is if there is either a regional detention facility identified that accounts for the subject property being developed, or if the subject property is a lot within a subdivision plat that accounts for detention. In any case, if the off-site or regional detention facility does not fully account for the City's requirements at the time of development, then supplemental detention may be needed. a. On-site detention will be required whenever increased runoff from the proposed development creates a hazard downstream. b. Supplemental detention may be provided by means of modifications to the off-site or regional basin if feasible. If it is not feasible, then supplemental detention on-site shall be provided. c. If the off-site/regional detention facility is existing at the time of development, then the developer of the subject property shall provide approval for use of the detention facility (that also addresses maintenance responsibility) for said facility, prior to approval. E. Inspection, Maintenance And Acceptance By The City Of O'Fallon. 1. The City Engineer and/or his/her designee shall inspect or cause to be inspected all stormwater detention facilities constructed within the City of O'Fallon, Missouri. Through such inspections the City Engineer and/or his/her designee shall ensure that the facilities under construction are being constructed in accordance with the approved plans for such development. 2. Each owner of the property being developed or has been developed, whose property has caused the increase in runoff that has necessitated the need for detention, has the responsibility and duty to properly operate and maintain any stormwater management system and/or detention facility, which has not been accepted for maintenance by the City. The responsibility of maintenance of the system and subdivision projects shall remain with the developer until such time as the stormwater management system escrow for such development has been released and turned over to the homeowner's association or property owner(s) of record. If there is no active homeowners' association, all properties listed as part of the subdivision and/or development will become responsible for maintenance. This will include all underground detention facilities. 3. Maintenance responsibility shall remain with the property owner(s) whose said property or development necessitated the need for detention. Regardless of ownership of said basin, should the developer, owner(s), association, or other entity responsible for maintenance choose to sell, abandon, or otherwise vacate their interest or ownership of the basin, this will in no way eliminate their maintenance responsibility of said basin unless they have provided for perpetual future maintenance separately. Said maintenance plan as referenced in Subsection (C)(4)(g)(1) above shall be submitted to the City for approval. 4. All such privately owned and maintained stormwater systems and/or detention facilities shall be subject to periodic inspections by the City Engineer and/or his/her designee. After an inspection by the City Engineer and/or his/her designee, he/she determines whether or not the conditions of the privately owned stormwater system and/or detention facilities are safe and operating and functioning per the approved plans. a. For underground detention facilities, the owner(s) shall be required to submit an annual maintenance report to the City Engineer verifying its condition and that it is operating and functioning per the approved plans. Said inspection shall be performed by a competent professional who is experienced in this type of work. 5. If the privately owned stormwater systems and/or detention facility is found to be deficient and in need of compliance measures or maintenance, the property owner(s) will be notified and correction of such requested. Any corrections will be the responsibility as identified in Subsection (E)(3) above. Any cost incurred by the City, as a result of the City Engineer's actions, shall be assessed against the owner(s) of the system. Initially, the stormwater funds as set up in Subsection (D)(2) above may be used to pay for any such emergency authorized by the City. 6. After notification is provided to the owner(s) of any deficiencies discovered from an inspection of a privately owned stormwater system and/or detention facility, the owner(s) shall have thirty (30) days or other time frame mutually agreed to between the City and the owner(s) to correct the deficiencies. The City shall then conduct a subsequent inspection to ensure completion of the repairs. If repairs are not undertaken or not found to be done properly, then enforcement procedures following this Section shall be followed. 7. If, after inspection by the City, the condition of a privately owned stormwater system and/or detention facility presents an immediate danger to the public health or safety, because of an unsafe condition or improper maintenance, the City shall take such action as may be necessary to protect the public and make the facility safe. Any cost incurred by the City, as a result of the City Engineer's actions, shall be assessed against the owner(s) of the system. a. No modifications shall be made to any privately owned stormwater system and/or detention facility, without a permit or other approval from the City. 8. Native Vegetation/Natural Basins. Should the owner(s) of a privately owned stormwater system and/or detention facility want to alter original construction to convert the system to provide increased water quality benefits and have a more natural appearance, such alternatives must be submitted by permit process to the City Engineer or his/her designee for review of detention facility functionality and approval. a. Conversion examples include, but are not limited to, native grasses, wildflowers, removal of concrete swales, or alteration of outfall structures. b. If approved, the owner(s) shall prepare and submit a maintenance schedule for the conversion. Modifications will be subject to inspection during conversion and continue after acceptance. c. If approved, converted areas shall be excluded from mowing requirements as stated in Section 220.100, Weeds, but an alternative mowing/maintenance schedule shall be submitted and followed. (1) Annual mowing will be required in efforts to prevent the vegetation from becoming excessive and basins from getting overgrown. All conversion-permitted basins shall be mowed by November 1 of each year. Failure to meet this requirement will result in enforcement in accordance with Section 220.100. d. Maintenance of such systems will continue to be the responsibility of the property owner(s) as stated in Subsection (E)(2) through (7). e. Under no circumstances does the altercation from a detention facility to a native vegetation area waive the requirements for detention. 9. Upon acceptance of public detention facilities by the City Council, the stormwater detention facility may be dedicated to the City for perpetual maintenance. Any such system shall include adequate perpetual access and sufficient area for maintenance by the City personnel and vehicles.
[R.O. 2008 § 405.240; Ord. No. 6496 , 9-13-2018 ; 7-27-2023 by Ord. No. 7034 ; Ord. No. 7056 , 10-26-2023 ; Ord. No. 7138 , 9-26-2024 ; Ord. No. 7196 , 3-27-2025 ]
Ask a question about O'Fallon law
Corpus searches the O'Fallon sections it holds and shows the ones that match, with their citations. Free, no sign-in.