§ 405.250 — Sanitary Sewers
Code of Ordinances, City of O'Fallon, Missouri (Code 2026-10-22) · O'Fallon City Code § 405.250
Corpus is an independent public-information project, not the official City of O'Fallon website. Stable reference: corpuslaw.us/code/0f67037f-824b-4e92-a0a9-3c25a12e715c
Section 405.250: Sanitary Sewers.
A. All buildings, structures and uses of land in the incorporated area of the City of O'Fallon shall hereafter be required with an adequate, safe and sanitary disposal system for all human disposal of sewage or other liquidated wastes and shall conform to the methods outlined herein: 1. Where a public sanitary sewer main is reasonably accessible, in the opinion of the City, the developer shall provide the subdivision with a complete sanitary sewer system connected with such sewer main, including a lateral connection for each lot. Such systems and connections shall comply with the regulations of the Missouri State Board of Health and Missouri Department of Natural Resources, City of O'Fallon and the Duckett Creek Sewer District (where applicable). a. Sanitary sewer systems outside the City of O'Fallon service area shall be reviewed and approved by the appropriate sewer district servicing the area. Approval letters shall be forwarded to the City of O'Fallon Engineering Department for service areas within the municipal boundaries. b. All sanitary sewer laterals shall be SDR 26 gasketed six-inch (6") PVC material. The wye shall be installed at the same standard as the main. c. Developers of commercial or industrial lots shall complete and submit to the City a sewer pre-treatment survey form. 2. It shall be the responsibility of the developer/applicant to comply with all requirements of the City of O'Fallon per Chapter 700, and/or Metropolitan St. Louis Sewer District (MSD), latest revision. 3. Verification of the service shall be provided at the time of submission of the preliminary plat. 4. Where no sewers are accessible and no plans for a sewer system have been prepared and approved, or where the topography restricts the use of reasonable gravity sewer mains, the developer shall provide a written engineering alternatives report, signed/sealed by a Missouri professional engineer, evaluating all of the options to service sewer for the site. This report should evaluate both gravity and mechanical options, costs, and maintenance responsibilities of each option, and provide pros and cons on each. Staff will review options and make recommendations for this development, and ultimately agree to one (1) or more of the solutions. 5. Review By The City's Sewer Consultant. The City's sewer consultant may be engaged to review the engineering alternatives report. The sewer consultant's report regarding the analysis will be forwarded as part of the petitioner's application to the Planning and Zoning Commission. 6. Should a mechanical system be the approved alternative, the developer shall either install a sewage collection and disposal system in accordance with the requirements of Subsection (A)(2) above or individual disposal devices may be installed on each lot within the subdivision, provided that no individual disposal device should be permitted unless the lots to be served have sufficient area to allow adequate soil absorption for on-site sewage disposal. The Planning and Zoning Commission may modify lot area requirements in relation to soil conditions and other pertinent facts and findings in any particular subdivision. All such individual devices and systems shall be constructed and maintained in accordance with the regulations and requirements of the Missouri Department of Natural Resources. a. If a pump station is being considered in the City's district, the developer shall use the City's standard design, where applicable. The City's sewer consultant may be engaged to review any technical design report or documents pertaining to any final mechanical system. Any alterations of the City's standard design shall be reviewed and approved by the City and/or the City's sewer consultant. Said consultant shall provide recommendations to the City for the final design to be built with the development. b. Any plan for a mechanical system shall be presented to Planning and Zoning, with the development. A concept level study will be required at the area plan or preliminary plat stage. c. Any mechanical system shall be built in accordance to the City's requirements in order to provide a reliable system to the public. 7. For lots with individual water systems and sanitary sewage disposal systems, the applicant shall adhere to St. Charles County requirements regarding the minimum lot size.
[R.O. 2008 § 405.250; Ord. No. 6496 , 9-13-2018 ; Ord. No. 7015 , 4-27-2023 ; Ord. No. 7230 , 7-24-2025 ]
Ask a question about O'Fallon law
Corpus searches the O'Fallon sections it holds and shows the ones that match, with their citations. Free, no sign-in.
