§ 405.247 — Stormwater Quality — Best Management Practices
Code of Ordinances, City of O'Fallon, Missouri (Code 2026-10-22) · O'Fallon City Code § 405.247
Corpus is an independent public-information project, not the official City of O'Fallon website. Stable reference: corpuslaw.us/code/74593148-0f5d-43bd-8776-00430a58d0fe
Section 405.247: Stormwater Quality — Best Management Practices.
A. Purpose And Intent. Two (2) consequences of construction and development are increased runoff created by the changed properties of ground surface and the rate of discharge of this increased runoff. These are both of great relevance to stormwater. The natural condition of the land before development is in relative balance with the natural capacity of the receiving creeks. Normally, the undeveloped conditions provide greater permeability and longer times of concentration. By modification of the ground surface from the irregular, pervious and vegetation-covered, the areas are changed to more impervious, more quickly drained and, in some cases, denuded of vegetation. It is the policy of the City to protect and promote the public health, safety and general welfare. The management of stormwater will reduce the erosion on land and creek channels, will reduce the possibility of damage to public and private property, and will assist in the attainment and maintenance of water quality standards, and will preserve the environmental quality of the watercourses in the City. B. Requirements — Creek Bank Setback. 1. Development along natural watercourses shall have residential lot lines, commercial or industrial improvements, parking areas and driveways set back a minimum of twenty-five (25) feet from the top of the existing stream bank. This is not meant to prevent access across creeks. Except as otherwise provided herein or as allowed by the City, the section of land between a natural watercourse and lot lines shall be designated as common ground and drainage easement to be maintained by the trustees or owners' association of the subdivision within all types of developments. Only for non-residential subdivisions in lieu of the common ground requirement, the section of land between the natural watercourse and twenty-five (25) feet from the top of bank can be: a. Private property with an easement dedicated to the trustees or owners' association requiring maintenance of the areas as the responsibility of the trustees or owners' association; b. Private property subject to a conservation easement in favor of an organization or land trust dedicated to environmental protection or land preservation such as Trailnet, Inc., the Open Space Council for the St. Louis Region or similar organization; c. Set aside in a stream bank mitigation program approved by the United States Army Corps of Engineers under the provisions of the Clean Water Act. 2. All developments shall maintain a setback minimum of fifty (50) feet from the top of the existing bank to any building structure requiring a construction permit that necessitates excavation or also requires a foundation. Commercial and industrial areas shall have creek areas dedicated as drainage easements. Notwithstanding the foregoing setback requirements, an applicant may obtain a variance to develop within the stream buffer area from the City, provided the applicant is able to demonstrate that the water quality and stream morphology will not be adversely affected or adequate mitigation is provided to offset such adverse effects. Mitigation may include, but not be limited to, the following: a. Installing additional erosion and sediment control; b. If the stream has the potential for lateral movement, installing stream stabilization practices within the stream; c. For those sites where vegetation does not exist, establishing vegetation; and/or d. Additional tree planting. C. Post-Construction — Water Quality. In order to preserve the quality of water in natural streams, it is important to provide a mechanism to remove contaminants on the site prior to water entering the natural watercourse. Typically called post-construction BMPs (best management practices), these methods identify a critical water quality volume that will need to receive a treatment to remove certain contaminants. These improvements, whether structural or non-structural, will remain in place after the construction is completed. The concepts introduced in the following Subsections are taken from the Georgia Stormwater Management Manual, Volume 2, August 2001. Nothing in the following Subsections shall change or replace any of the City's detention ordinances. 1. Water Quality Volume (WQv). a. The water quality volume (denoted as the WQv) is the storage needed to capture and treat the runoff from ninety percent (90%) of the recorded daily rainfall events. In numerical terms, it is equivalent to one and fourteen hundredths (1.14) inches of rainfall multiplied by the volumetric runoff coefficient (Rv) and site area. The WQv is directly related to the amount of impervious cover created at a site. A minimum WQv of two-tenths (0.2) inches per acre shall be met at all sites. b. Redevelopment projects can appeal to the Planning and Zoning Commission to reduce or eliminate WQv if it can be shown that there are stormwater enhancements being provided. 2. As a basis for determining water quality treatment volume, the following assumptions may be made: a. The water quality volume WQv for off-site areas is not required. The following equations are used to determine the storage volume, WQv (in acre/feet of storage): WQv | = | [(P)(Rv)(A)]/12 P | = | 1.14 inches of rainfall Where: WQv | = | Water quality volume (in acre-feet) Rv | = | 0.05 + 0.009 (I) where I is percent impervious cover A | = | Area in acres b. Measuring Impervious Cover. The measured area of a site plan that does not have vegetative or permeable cover shall be considered total impervious cover. c. Multiple Drainage Areas. When a project contains or is divided by multiple drainage areas, the WQv volume shall be addressed for each drainage area. d. Off-Site Drainage Areas. The WQv shall be based on the impervious cover of the proposed site. Off-site existing impervious areas may be excluded from the calculation of the water quality volume requirements. e. BMP Treatment. The final WQv shall be treated by an acceptable BMP(s) from the list presented in this Chapter. f. Extended Detention For Water Quality Volume. The water quality requirements can be met by providing a twenty-four-hour draw down of a portion of the water quality volume (WQv) in conjunction with a stormwater pond or wetland system. D. Acceptable Urban BMP Options. 1. This Subsection sets forth five (5) acceptable groups of BMPs that can be used to meet the water quality volume criteria (WQv). The design and selection of these BMPs should comply with the Georgia Stormwater Management Manual as prepared by the State of Georgia. 2. Where the City's criteria or requirements are more stringent, then they shall govern. Adapting to local Missouri environment and natural conditions should be expected but shall be as approved by the City or a higher authority. The acceptable BMP designs are assigned into five (5) general categories for stormwater quality control (WQv): a. BMP Group 1 stormwater ponds. b. BMP Group 2 stormwater wetlands. c. BMP Group 3 infiltration practices. d. BMP Group 4 filtering practices. e. BMP Group 5 open channel practices. 3. See Section 1.3 of the Georgia Stormwater Management Manual for additional BMP options. Section 3 of the Georgia manual has detailed descriptions of each control. 4. To be considered an effective BMP for stand-alone treatment of WQv, a design shall be capable of: a. Capturing and treating the required water quality volume (WQv). b. Removing eighty percent (80%) of the TSS. 5. A combination of BMPs and/or credits is normally required at most development sites to meet all three (3) stormwater sizing criteria. a. BMP Group 1. Stormwater Ponds. Practices that have a combination of permanent pool, extended detention or shallow wetland equivalent to the entire WQvs include: (1) P-1 micropool extended detention pond. (2) P-2 wet pond. (3) P-3 wet extended detention pond. (4) P-4 multiple pond system. (5) P-5 pocket pond. b. BMP Group 2. Stormwater Wetlands. (1) Practices that include significant shallow wetland areas to treat urban stormwater but often may also incorporate small permanent pools and/or extended detention storage to achieve the full WQv include (Modification of existing wetland areas will require a Corps 404 permit.): (a) W-1 shallow wetland. (b) W-2 ED shallow wetland. (c) W-3 pond/wetland system. (d) W-4 pocket wetland. (2) Wetlands shall not be used for control of water quantity (i.e., the flood protection volume). c. BMP Group 3. Infiltration Practices. (1) Practices that capture and temporarily store the WQv before allowing it to infiltrate into the soil over a two-day period include: (a) I-1 infiltration trench. (b) I-2 infiltration basin. (2) Infiltration practices will be allowed on sites where it is proven that infiltration will work. Percolation rates shall be determined for proper use. d. BMP Group 4. Filtering Practices. (1) Practices that capture and temporarily store the WQv and pass it through a filter bed of sand, organic matter, soil or other media are considered to be filtering practices. Filtered runoff may be collected and returned to the conveyance system. Design variants include: (a) F-1 surface sand filter. (b) F-2 underground sand filter. (c) F-3 perimeter sand filter. (d) F-4 organic filter. (e) F-5 pocket sand filter. (f) F-6 bioretention.* (g) F-7 proprietary filtering system. *May also be used for infiltration. (2) A maintenance agreement and maintenance schedule shall be required. e. BMP Group 5. Open Channel Practices. (1) Vegetated open channels that are explicitly designed to capture and treat the full WQv within the dry or wet cells formed by check dams or other means include: (a) Dry swale. (b) Wet swale. (c) Filter strips. (2) Open channel practices shall be designed with the proper plantings. Wet swales shall be designed to drain out over time.
[R.O. 2008 § 405.247; Ord. No. 6496 , 9-13-2018 ]
Ask a question about O'Fallon law
Corpus searches the O'Fallon sections it holds and shows the ones that match, with their citations. Free, no sign-in.
