§ 405.245 — Erosion And Sediment Control Requirements
Code of Ordinances, City of O'Fallon, Missouri (Code 2026-10-22) · O'Fallon City Code § 405.245
Corpus is an independent public-information project, not the official City of O'Fallon website. Stable reference: corpuslaw.us/code/45772568-f23b-42e2-b60e-e15a87714ae4
Section 405.245: Erosion And Sediment Control Requirements.
A. Purpose And Intent. This Section specifies or authorizes performance and design standards for a Stormwater Pollution Prevention Plan (SWPPP) to reduce the amount of sediment and other pollutants in stormwater discharges associated with the land disturbance activities as required by these regulations, in addition to outlining the process by which any violations will be addressed. The applicant's engineer shall select and design erosion and sediment controls and stormwater best management practices adequate to meet those requirements, subject to review and approval by the City as hereinafter provided. Because violations of proper erosion and sediment control and stormwater best management practices pose risks to adjacent properties, affected bodies of water, other natural resources, etc., it is the intent of the City of O'Fallon to enact these policies and procedures which work to protect and promote the public health, safety and general welfare, through proper erosion and sediment control during construction activities. B. Performance Standards. Designs for a SWPPP, including erosion and sediment controls and stormwater best management practices, shall meet the following performance standards: 1. Compliance with the Missouri Clean Water Law (Chapter 644, RSMo., as amended), the Federal Water Control Act (Public Law 95-500, 92d Congress, as amended), and Missouri and Federal regulations pursuant thereto. 2. Compliance with all standards imposed by Missouri Department of Natural Resources Missouri State Operating Permit MO-R100A; provided, however, if the land disturbance area is within a valuable water resource area as determined by the Missouri Department of Natural Resources, the SWPPP shall comply with all standards imposed by a Missouri State Operating Permit MO-R109 issued in compliance with the Missouri Clean Water Law (Chapter 644, RSMo., as amended), the Federal Water Control Act (Public Law 95-500, 92d Congress, as amended), and Missouri and Federal regulations pursuant thereto. 3. Compliance with the following additional standards stated herein: a. All erosion and sediment control measures shall be fully installed and implemented prior to any work necessitating major land disturbance so as to prevent the flow or runoff of mud, silt, dirt, debris and other materials onto streets, sidewalks and other public rights-of-way. Additionally, positive steps shall be exercised to prevent mud, silt, dirt, debris and other materials from damaging adjacent property and silting up all storm drainage systems whether on- or off-site. b. No land disturbance activity shall result in the impounding of surface water on property other than the permittee's unless the permittee obtains easements or licenses for that purpose. c. Runoff into receiving streams from any area undergoing land disturbance activities that is greater than three (3) acres shall not exceed the two (2) year twenty-four (24) hour peak runoff rate for that area in its pre-developed state. d. Temporary discharges into receiving streams from any area undergoing land disturbance activities shall not result in the accelerated erosion of those streams' channels at the point of discharge. e. If temporary facilities and erosion and sediment controls installed pursuant to approved plans fail to meet the performance standards set out herein, the Director of Engineering or their designee may require the permittee to submit modified plans which meet the required standards. f. For storms exceeding the design storm (fifteen-year, twenty-minutes), any silt or debris leaving the site and affecting public rights-of-way or stormwater drainage facilities shall be cleaned up within twenty-four (24) hours after the end of the storm. C. Design Criteria. 1. SWPPPs for a development site shall be designed in accordance with the Protecting Water Quality Field Guide (latest edition as prepared by the Missouri Department of Natural Resources). 2. The erosion and sediment controls and temporary facilities shall be designed to accommodate, at a minimum, the runoff for the design storm specified herein, using the runoff coefficients specified in Table 1 and calculated according to the methods defined in this Section. a. Design Storm. Designs for erosion and sediment controls and temporary facilities constructed during land disturbance activities shall be sufficient at a minimum to accommodate stormwater flows from a fifteen-year, twenty-minute storm. b. Runoff Coefficient. The runoff coefficient (C) corresponds to the effective runoff based on ground cover, ground slope and that portion of rainfall that is lost to surface runoff by processes such as depression storage, infiltration, interception and evaporation. The runoff coefficients in Table 1 shall be used in calculating peak runoff rates and stormwater volumes. Table 1 — Runoff Coefficient Table (C) Ground Cover | Runoff Coefficient (C) Pasture and unimproved areas | 15% Woods | 10% Lawns < 6% slope | 15% Lawns > 6% slope | 30% Graded/no vegetation < 6% slope | 50% Graded/no vegetation > 6% slope | 60% Gravel parking lot | 75% Gravel road | 80% Pavement, walks, buildings | 95% The runoff coefficients shall be determined for each drainage area to proposed erosion and sediment control and temporary facilities based on the following criteria: (1) Land disturbance areas shall be considered stripped of all vegetation in determining runoff for erosion and sediment controls placed prior to land disturbance activities. (2) After cut and fill operations are completed, land disturbance areas shall be considered stripped of all vegetation in determining sediment controls, runoff conveyance systems and erosion prevention devices. c. Stormwater Runoff Calculation Method. The Rational Method, as developed by Mulvaney in 1851, shall be used to determine the peak (maximum) runoff rate. The Rational Method (also known as the Rational Formula) is: QWET = C * i * A Where: QWET | = | total stormwater runoff in cubic feet per second (cfs) C | = | runoff coefficient (dimensionless) i | = | 4.55 (rainfall intensity rate, inches per hour) A | = | drainage area in acres (ac) (1) The drainage area for erosion and sediment control facilities is limited to the following: Sediment Trap: Less than five (5) acres. Limited to eighteen (18) months of structural life. Sediment Basin: Twenty (20) acres or less. Limited to ten (10) years of structural life. Silt Fence: Maximum length is six hundred (600) feet. Ends should be flared uphill. Location shall be in accordance with DNR recommendations specified in Field Guide. Must be checked after each rain event and repaired within forty-eight (48) hours. Limited to three (3) months of structural life. (a) Two percent (2%) slope or less — one-fourth (1/4) acre per one hundred (100) feet. (b) Two percent (2%) to five percent (5%) slope — one-fourth (1/4) acre per seventy-five (75) feet. (c) Five percent (5%) to ten percent (10%) slope — one-fourth (1/4) acre per fifty (50) feet. (d) Ten percent (10%) slope or greater — one-fourth (1/4) acre per fifteen (15) feet. (2) The runoff coefficients (C) to be used are set out in tabular form in Table 1, above. (3) The rainfall intensity rates: (i) were derived using Figure 4-1 from the Metropolitan St. Louis Sewer District Rules and Regulations and Engineering Design Requirements for Sanitary Sewer and Stormwater Drainage Facilities, 2018 Edition. (4) In addition to the stormwater storage that occurs during a rain event (QWET), the equivalent amount of dry storage (QDRY) is further required in the event that a second storm occurs before the storage facility has had a chance to drain the existing stormwater. d. Sediment Storage Volume Calculation. The total volume of sediment storage within a storage facility shall be based on the drainage area, in acres, which is: V = A * 1,800 (for Sediment Storage within a Trap) V = A * 3,600 (for Sediment Storage within a Basin) Where: V | = | total sediment storage volume in cubic feet (cf) A | = | drainage area in acres (ac) (1) The runoff coefficients (C) to be used are set out in tabular form in Table 1, above. e. Total Storage Volume Calculation. The total storage volume for determining sizing of storage structure is the combined volumes of stormwater (wet and dry) and sediment storage with an additional one (1) foot of freeboard to the spillway elevation or top of berm. SVT = QWET + QDRY + V + 1 ft (Freeboard) D. Surface Stabilization Requirements. 1. Surface Stabilization Techniques. Bare ground must be stabilized by vegetation, rock surfacing, erosion control blankets and netting, soil binders, structural topping, like concreting or other techniques authorized by the Protecting Water Quality Field Guide (latest version as prepared by the Department of Natural Resources). With respect to vegetation, the following provisions shall also apply: a. Temporary seeding shall be used if the area will be disturbed later in the development. The area must be vegetated by permanent seeding or sodding, when no further land disturbance will occur. b. Seeding, fertilizing and mulching shall be applied at the rates and times specified in the Protecting Water Quality Field Guide (latest edition as prepared by the Department of Natural Resources). c. Mulch can be used as temporary cover in unseeded areas to protect against erosion over the winter or until final grading and shaping can be accomplished. Application rates are shown in the Stormwater Management Policy. d. Temporary seeding and mulching shall be placed on at least seventy percent (70%) of the total disturbed site area according to the stabilization schedule. e. Temporary seeding may be suspended in portions of the project area which have an active building permit. Upon completion of the building activity, the site must be permanently stabilized. f. Seeded areas shall be refertilized four (4) weeks after initial seeding. The seeded area shall be inspected at that time for uniform cover and adequate density. All areas which are bare or sparse [less than thirty percent (30%) ground cover] shall be reseeded and mulched. g. Non-degradable mats shall be used only as a permanent installation and in areas that will not be mowed. 2. Surface Stabilization Schedule. Land disturbance activities shall be scheduled as provide in the table below: Table 2 — Soil Stabilization Schedule Soil Disturbance Activity or Condition | Required Stabilization Time Soil disturbance has ceased in areas greater than 2,000 square feet. | 14 days After construction of dikes, swales, diversions and other concentrated flow areas. | 5 days When slopes are steeper than 3 horizontal to 1 vertical. | 7 days When slopes are greater than 3% and longer than 150 feet. | 14 days Perimeter controls around soil stockpiles. | End of workday Stabilization or covering of inactive stockpiles. | 30 days When land disturbance is completed, permanent soil stabilization must be installed. | 30 days 3. Land Disturbance Phasing. Land disturbance activities shall be scheduled in stages of development, so that only the areas that are actively being developed are exposed. Land disturbance areas exceeding ten (10) acres in total shall require phasing. A phasing plan, including the size and schedule of activities for each phase, is to be submitted to the Director of Engineering for review and approval, together with documentation concerning the need to disturb more than ten (10) acres at a time and the additional measures to be taken to ensure site stability. When evaluating the proposed phases of development, the Director of Engineering shall consider the following factors and such additional factors as the Director deems relevant based on the circumstances of the project under consideration: a. Overall size of the development. b. Proposed contours/existing graded conditions. c. Soil composition on the site. d. Size of watershed affected by the development. e. Presence of streams, creeks or other natural water courses on the site. f. Interim/transitional SWPPP plans. g. Additional/alternative erosion control measures. h. Construction timing and ability to grow ground cover. 4. Surface water shall be diverted from the face of all cut and fill slopes exceeding eight (8) feet in vertical elevation. 5. Slope breaks shall be provided whenever the vertical elevation of any slope exceeds twenty (20) feet. 6. Diversion berms shall not exceed eight hundred (800) feet in length. 7. No excavation shall be made so close to the property line to endanger any adjoining public or private property without supporting and protecting such public or private property from settling, cracking or other damage. 8. No fill material shall be placed so as to cause or to allow the same to be deposited upon or to flow onto another property without written consent of the owner. 9. No fill material shall be placed so as to cause or to allow the same to be deposited upon or to flow onto any public street, walk, place or way, nor so close to the top of a bank of a channel as to create the possibility of bank failure. 10. Materials for fills shall consist of material obtained from excavation of banks, borrow pits or other approved source. Material shall be free of vegetative matter and deleterious material and shall not contain large rocks or lumps except as certified by a geotechnical engineer to be acceptable fill material. 11. No cut or fill slope shall be made steeper in slope than three (3) horizontal to one (1) vertical without being certified by a geotechnical engineer as to its stability and approval by the Director of Engineering. 12. Individual and isolated slopes, rock dikes, undisturbed natural slopes and slopes blending with the natural terrain may be steeper than the requirements as approved by the Director of Engineering. 13. All fills and trench backfills shall be compacted to the minimums as defined in the Stormwater Management Policy. Compaction of fills and backfills must be certified by a geotechnical engineer. 14. Solid rock, shale, tree stumps, masonry and other obstructions shall be removed to a depth of two (2) feet below finished grade or pavement subgrade. 15. Tree Preservation. If any trees are to be preserved on site per the approved plans, protection for the trees (in the form of construction fencing, snow fencing, or other high visibility barrier) shall be constructed and placed at the drip line of the tree canopy. No land disturbance activities shall take place within the barrier. E. Stormwater Conveyance Requirements. 1. Temporary conveyance of stormwater during land disturbance activities depends upon the peak runoff for the design storm and a suitable method to prevent erosion after construction. The requirements listed below shall be used for temporary conveyance of stormwater: a. All drainage shall be designed to transport surface waters to the nearest practical storm drain, natural watercourse or street as approved by Engineering Review. b. Diversion channels and ditches are to be designed to a non-erosive velocity as defined in the geotechnical report required for the site. Diversion ditch length shall not exceed eight hundred (800) lineal feet. c. A rock outlet is required at all pipe and improved channel discharges to open watercourses. The maximum design velocity shall be seven (7) feet per second (fps). If the discharge velocity exceeds seven (7) fps, an engineered energy dissipater shall be required. F. Sediment Control Requirements. 1. A temporary construction vehicle wash-off pad is required to avoid tracking mud onto public roads and must be located where construction traffic leaves the site. The permittee shall remove any mud, sediment or debris tracked onto public roads by sweeping or other mechanical means on a daily basis (sweeping to be performed at the end of the day, unless existing conditions are such that require additional sweeping to be performed), or as requested by the Director of Engineering or their designee. A water truck may be required to facilitate vehicle cleaning or roadway cleaning, if needed. 2. Sediment basins shall be used to meet water quality discharge requirements and predeveloped runoff rates during land disturbance activities. Sediment basins shall be designed for the following criteria: a. Sediment volume shall be determined in accordance with Subsection (C)(2)(d). b. Dewatering time shall be twenty-four (24) hours for the total volume of wet storage of the basin. c. The outlet must be designed to convey the required runoff with a minimum one (1) foot freeboard between the water surface of the outlet and the top of the basin embankment. G. Inspection Requirements. 1. The property owner, developer, his/her agent or applicant shall inspect all erosion control on a weekly basis. An inspection report summarizing the inspection and any noted deficiencies shall be submitted weekly to the O'Fallon Stormwater Management Coordinator. 2. The property owner, developer, his/her agent or applicant shall inspect all erosion control and correct any deficiencies within forty-eight (48) hours of the end of any storm producing more than one-quarter (1/4) inch of rain at the project site. 3. The Director of Engineering, the Stormwater Management Coordinator, Construction Inspector or other designee may inspect all erosion control at any time as required. H. Erosion And Sediment Control Violations. 1. If a violation concerning erosion or sediment control (examples, include, but are not limited to, non-compliant/incorrect installation of items noted on a SWPPP, failure to comply with a SWPPP (City-approved stormwater pollution prevention plan) for a site that results in sediment leaving the property, entering streets or the stormwater system, erosion occurring on site, failure to correct noted deficiencies, etc.) occurs or if the erosion and sediment control fails to meet the required performance standards within or on a site currently under development within the City of O'Fallon, as determined by the Director of Engineering or their designee, the procedure outlined in the Subsection (H)(2), below shall commence immediately. 2. Erosion And Sediment Control Violation Procedure. a. Any conditions found by the Director of Engineering or their designee to be violations or items not in conformance with the SWPPP shall be reported to the site supervisor or appropriate personnel with oversight of SWPPP compliance. b. The permittee shall have seven (7) calendar days after notification of a violation, commencing the working day following the day on which the violation notice was provided, to complete remediation or corrections. The Director of Engineering or their designee, may grant an extension, if the permittee reasonably demonstrates that the repairs cannot be made within the specified timeframe. c. A subsequent reinspection of the site shall be conducted by the appropriate City personnel. If any items have not been remedied to conform with the approved SWPPP, the City Administrator can issue a Stop Work Order for the site, per Section 405.500. Any and all activities related to construction with the exception of work related to remediating SWPPP items, shall cease until such remedies have been made. d. It is an ordinance violation, punishable as provided in Section 100.010, for any permittee, developer, construction company or other party to proceed with work not related to the SWPPP or in any way violate the Stop Work Order. In addition, such a violation may result in the suspension or revocation of all approval or permit(s) to conduct work on the site.
[ Ord. No. 7138 , 9-26-2024 ]
Ask a question about O'Fallon law
Corpus searches the O'Fallon sections it holds and shows the ones that match, with their citations. Free, no sign-in.